GovChime
Notice ID: 671450a704eccc65b2ae4a70ab210b08Solicitation

J--Boiler Maintenance

Archived on December 5, 2009. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
6:00 AM UTC+01:00
Posted
October 16, 2009
Notice type
Solicitation
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
NAICS
811310: Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Notice details

Place of performance
ONE VETERANS DRIVE;MINNEAPOLIS, MN 55417 US
PSC
J: MAINT, REPAIR, REBUILD EQUIPMENT
Last updated
Dec 3, 2025

Identifiers

Solicitation number
VA-263-10-RP-0001
Notice ID
671450a704eccc65b2ae4a70ab210b08

Description

RFP VA263-10-RP-0001J045 Maintenance-repair of plumbing-heating equipment The VISN 23 Midwest Health Care Network Contracting Office, 708 SouthThird Street, Suite 200E, Minneapolis, MN 55415 intends to acquireboiler mainteance services outlined below for the VA Medical Center,Minneapolis, MN. The proposed contract is for a base year and fouroption years. I Base Year - date of award [est. December 1, 2009] throughSeptember 30, 2010 II Option Year One - October 1, 2010 through September 30, 2011 III Option Year Two - October 1, 2011 through September 30, 2012 IV Option Year Three - October 1, 2012 through September 30,2013 V Option Year Four - October 1, 2013 through September 30, 2014 NAICS 811310 $6.5M. In accordance with PL 109-461 this solicitation isset-aside 100% for SDVO Small Business concerns. All responsible SDVOSBsources may submit a written proposal which, if timely received, shallbe considered by the Government. PROPOSALS MUST BE COMPLETE AND PROVIDEALL INFORMATION SOUGHT IN THE SOLICITATION DOCUMENTS. Failure toprovide full information may cause proposals to be down-rated in theevaluation process. Solicitation documents will be available on www.fbo.gov on or aboutMonday, October 5, 2009. Offers are due Thursday, November 5, 2009 at4:30 pm CT. Proposals will be sent (or delivered) to arrive by the dateand time due. If hand delivered bring to the VA Contracting andPurchasing Office, 708 South Third Street, Suite 200E, Minneapolis, MN55415. Use the same address for U. S. Mail or other deliverysystems/methods. Late proposals will be rejected. Proposals must be inthe Government's custody by the due date and time. Delivery will beverified. Electronic and facsimile proposals will NOT be accepted.E-mail messages (Michael.owen@va.gov) will be accepted only forquestions and requests. Proposals sent via e-mail or fax will beautomatically rejected as non-responsive. POC: Michael Owen. The Energy Center requires a Contractor to provide preventivemaintenance including visual inspection, cleaning, lubrication,adjustments and calibration of boiler burners, controls, instrumentationand other related equipment. Contractor will furnish all labor, partsand materials needed to maintain the equipment listed in thissolicitation in good operational condition. The Energy CenterSupervisor must approve the use of any parts that are not the currentmanufacturer, and the contracting office must approve payment for thepurchase of parts for any given work under this contract before anyupgraded parts are ordered or provided. Contractor shall be responsiblefor providing services any time contacted. All work will be performedduring the working hours of 8:00 am to 4:30 pm. Work shall be scheduledwith the Supervisor of the VAMC Energy Center. Contractor shall also beresponsible for providing semi-annual inspections. Emergency Service -If the boilers at the Energy Center are such that a required backup isnot available, it will be considered an emergency. Contractor willprovide emergency service including diagnosis, repair, parts and laborto correct problems related to the equipment covered under the contract.The service shall be rendered at any hour of any day of the week.Contractor is required to call the Energy Center back within an hour ofcontact, and must arrive on site at the Energy Center within 4 hours ofnotification. Contractor must make necessary repairs within three days.If emergency service is performed during normal hours, there will be noadditional charge. Reporting requirements - A written report shall besubmitted to the Supervisor of the Energy Center after each service,certifying that all instruments covered by these specifications havebeen serviced as required. The report shall also contain anyrecommendations concerning instrumentation that Contractor servicepersonnel may deem necessary. During semi-annual testing, Contractorwill complete a spreadsheet provided by the Energy Center during thataccounts for all measurements taken and data collected and thatindicates the equipment has been calibrated, adjusted and inspected.Contractor shall tag all equipment that is calibrated. When Contractoris contacted for service, Contractor personnel will report to theSupervisor, Energy Center upon arriving at the VA Medical Centerfacility. Upon completion of work, a service report listing date, time,equipment serviced and service performed will be submitted to theSupervisor, Energy Center.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Michael L OwenContract Specialist612-467-2190 Contracting Officer

Documents

No documents available.

Lifecycle

Solicitation:VA-263-10-RP-0001
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 3×
    Pre-SolicitationOct 2, 2009

    J--Boiler Maintenance

    Notice de84ffe86bb65a85941c468446462d41 on SAM.gov

  2. SolicitationCurrentOct 16, 2009

    J--Boiler Maintenance

    Notice 671450a704eccc65b2ae4a70ab210b08 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

VA-263-10-RP-0001

Archive Date

Dec 5, 2009