Notice ID: bfd1a485d49491e7497210db9e6b5cb1Award NoticeAwarded
RECOVERY C--Recovery - AE Design Sand Cast Water Main Replacement
Awarded on August 12, 2009. Full description on SAM.gov.
Awarded tounder VA69D-P-1075 (source: SAM.gov award notice)• $183.1K
Overview
- Posted
- August 12, 2009
- Notice type
- Award Notice
- NAICS
- 541330: Engineering Services
- Agency
- Department of Veterans Affairs
Notice details
- Office
- 252-NETWORK CONTRACT OFFICE 12 (36C252)
- PSC
- C: ARCHITECT/ENGINEER SERVICES
- Last updated
- Sep 25, 2026
- Award date
- Aug 12, 2009
- Award amount (SAM.gov award notice)
- $183.1K
Identifiers
- Solicitation number
- VA-69D-09-RA-0275
- Notice ID
- bfd1a485d49491e7497210db9e6b5cb1
- Award number (PIID)
- VA69D-P-1075
Description
RECOVERY - This is a request for Standard Form 330, not a request for proposal. Provide Professional Architectural Engineering Design services for the Water Main Replacement, Project #578-06-135 at the Edward Hines Jr. VA Hospital, Hines, Illinois. Work to include, but is not limited to, preparation of drawings, specifications and cost estimates for all facets of work and trades necessary to facilitate award of a construction contract for replacement and installation of new waters mains on the medical center campus. Approximately 3,370 feet of water main will be replaced and 1,500 feet of new 6" water main installed in the first phase. AE will utilize state of the art geophysical prospecting techniques to determine the location of all underground utilities in the vicinity of the existing sand-case iron water mains proposed for replacement to avoid damage to them during the replacement of the water mains. Estimated construction cost is between $1,000,000- $2,000,000. Area of consideration is restricted to 100 miles of the Hines VA Hospital, Hines, Illinois. Submit two (2) copies of SF 330 with appropriate documentation by close of business April 23, 2009. Mail information to: Great Lakes Acquisition Center, Attn: Laura Silguero, 5000 West National Avenue, Building 5, Milwaukee, Wisconsin 53295-0005. Selection criteria will be based on: (1) specialized experience and technical competence of the firm (including a joint venture or association) with the type of design required, (2) specific experience and qualifications of personnel proposed for assignment to the project, (3) Maintaining project schedules and project budgets; (4) Knowledge in design and construction requirements; and (5) Cost control effectiveness. No bid packages are available. This is not a Request for Proposal (RFP). NAIC #541330 applies. Award of a contract is subject to the availability of funds.
Award Overview
Award Number
VA69D-P-1075
Award Amount (SAM.gov award notice)
$183.1K
Award Date
Aug 12, 2009
Awardee
Original Solicitation
Notice ID: bfd1a485d49491e7497210db9e6b5cb1
Posted Date: Aug 12, 2009
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Laura SilgueroContract Specialist414-902-5417 Contract Specialist
Documents
No documents available.
Lifecycle
Solicitation:
VA-69D-09-RA-0275- Pre-Solicitation
- Awarded
This opportunity has been awarded.
- Pre-SolicitationMar 23, 2009
C--RECOVERY - Water Main Replacement Project - Phase 1
- AwardedCurrentAug 12, 2009
RECOVERY C--Recovery - AE Design Sand Cast Water Main Replacement
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
VA-69D-09-RA-0275
Archive Date
Sep 11, 2009
Office Address
MILWAUKEE, WI, 53214