GovChime
Notice ID: b0c513174fe371929ea9b26a60d3a1f4Award NoticeAwarded

J--Replace MBC energy management panel and PC Board

Awarded on August 7, 2013. Full description on SAM.gov.

Awarded tounder 589WC3676/VA255-13-P-3806 (source: SAM.gov award notice)• $28.7K

Overview

Posted
August 7, 2013
Notice type
Award Notice
Agency
Department of Veterans Affairs

Notice details

Office
255-NETWORK CONTRACT OFFICE 15 (36C255)
Place of performance
Leavenworth, KS 66048 66048 US
PSC
J: MAINT, REPAIR, REBUILD EQUIPMENT
Last updated
Dec 5, 2025
Award date
Aug 7, 2013
Award amount (SAM.gov award notice)
$28.7K

Identifiers

Solicitation number
VA255-13-Q-1378
Notice ID
b0c513174fe371929ea9b26a60d3a1f4
Award number (PIID)
589WC3676/VA255-13-P-3806

Description

No Description Provided

Full description on SAM.gov

Award Overview

Award Number

589WC3676/VA255-13-P-3806

Award Amount (SAM.gov award notice)

$28.7K

Award Date

Aug 7, 2013

Awardee

Original Solicitation

Notice ID: b0c513174fe371929ea9b26a60d3a1f4

Posted Date: Aug 7, 2013

Original Response Deadline: Not specified

Contract Details

Contract data not yet available

Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.

Contacts

Contracting Officer

Primary Contact

Name: Client Services, Title: Client Services, Phone: 1.877.933.3243, Fax: 703.422.7822, Email: Clientservices@fedbid.com;

Documents

No documents available.

Lifecycle

Solicitation:VA255-13-Q-1378
  1. Combined Synopsis
  2. Awarded

This opportunity has been awarded.

  1. 2×
    Combined SynopsisJul 31, 2013

    J--Replace MBC energy management panel and PC Board

    Notice 4d5bbe78cf192a8d11930613ec33d6f9 on SAM.gov

  2. AwardedCurrentAug 7, 2013

    J--Replace MBC energy management panel and PC Board

    Notice b0c513174fe371929ea9b26a60d3a1f4 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The Government is seeking a minimum of 19,000 to a maximum of 19,000 of American National Standards Institute/Building Owners and Managers Association (ANSI/BOMA) Occupant Area (ABOA) square feet (SF) of contiguous space within the Area of Consideration set forth below. See Section 2 of the Lease for applicable ANSI/BOMA standards.
-Solicitation12/18/2026
Modification 2 to Presolicitation Notice 36C25527R0013 This modification provides answers to RFIs received and revised the evaluation criteria to be used for this project. RFIs Received for Project # 657A5-24-108, Replace Medium Voltage Feeder 3 and Transformers 1. Factor 4 Past Performance / Section F Project Eligibility  The solicitation states that projects submitted for past performance consideration must have completed both design and construction, and that projects not constructed will not be considered. Would the VA consider accepting relevant electrical infrastructure studies or assessments in Section F, particularly those involving medium-voltage distribution systems and feeder evaluations, that demonstrate directly applicable technical expertise but did not result in construction? We prefer to keep it as projects that were designed AND constructed. Since this is a construction project and not a study, we want projects that have been finished to be used for past performance criteria.  2. Factor 2 Specialized Experience and Technical Competence / Laboratory Requirements  Factor 2 references the firm's technical capabilities in design quality management procedures, CADD/BIM, equipment resources, and laboratory requirements. Given that the project scope primarily involves medium-voltage electrical feeder and transformer replacements, could the VA clarify the applicability of laboratory requirements to this project? We respectfully request that this criterion be removed from the evaluation requirements, as it does not appear directly relevant to the stated scope of work. Laboratory requirements were deleted. Please see revised evaluation criteria below.  3. Request for Submission Deadline Extension Given the technical scope of the project and the level of detail required to address the evaluation criteria, we respectfully request a one-week extension of the SF330 submission deadline, from November 10, 2026, to November 17, 2026. This additional time would allow interested firms to prepare comprehensive qualifications packages that fully address the solicitation requirements. SF330 submission due date extended from 11/10/2026 to 11/172026. End of RFIs.
-Pre-Solicitation11/17/2026
Amendment 0004 (P04) to RFQ 36C25526Q0617, Fire Alarm, Smoke and Automatic Door Inspection and Testing Services (IDIQ). The purpose of this amendment is to extend the quote due date to November 20, 2026, 3:00 PM CST. The previous due date was 11/10/2026 1500 CST. All other terms and conditions remain unchanged. Offerors must acknowledge this amendment by signing and returning the SF30 with their quote, or as otherwise stated in the amendment. Offerors who already submitted a quote may submit a revised quote by the new due date. If no revised quote is received, the quote already on file will be considered. .
-Solicitation11/20/2026
Modification 2 to Presolicitation Notice 36C25527R0007, P/N 657-27-209JB, Project Title: Renovate Building 1 and 53 Main Lobbies. This modification provides answers to RFIs received, revised evaluation criteria and revised supplement B per below RFIs. The SF330 submission due date is extended from November 10, 2026 to November 16, 2026. RFIs Received with VA Responses in blue text: Construction Budget questions: Is that the Estimated Cost of Construction or the maximum for the A/E Design Fee? Estimated Cost of Construction If the $949,026 is the construction budget, this appears low in today's environment given that over 6,000 SF needs to be renovated. Can the VA please re-evaluate this budget and provide an update? The construction budget that was originally used in the supplement B pre-solicitation notice is incorrect. A revised supplement B is attached, changing the construction cost estimate from $949,026 to $725,873. The Construction budget is set and cannot be changed until the design process is underway. Key Personnel questions: The Presolicitation Notice lists: Supervisory, Fire Protection Engineer, Certified Professional Industrial Hygienist, and Life Safety Engineer. The Statement of Work and Supplement B list: Communications (voice/data), Interior Design, VPIH, Plumbing (including fire protection), and a 3rd Party Fire Protection Review. Questions: Which positions require resumes in Section E? What is the intended role of "Supervisory"? Per the SOW & Supplement B the following positions require resumes: Project Manager, Architectural, Mechanical, Electrical, Communication (voice data) Plumbing (Including Fire Protection), Structural, Interior Design, VPIH, Cost Estimator and a 3rd Party Fire Protection Review. Project manager is Supervisory Industrial Hygienist/Asbeston Project Designer: Question: Is an ABIH Certified Industrial Hygienist (CIH) acceptable for this position, and does a CIH satisfy the requirement for the VPIH and the state-accredited Asbestos Project Designer? If these must be separate individuals, should both be identified in the SF330? A CIH satisfies the requirement for the VPIH and the state-accredited Asbestos Project Designer. They can be the same individual. Site Visit: Supplement B, page 6, Section III.6.g: the A/E "shall meet with the COR at the proposed project site" prior to submitting a response Presolicitation Notice, page 4: "Personal visits to discuss this announcement will not be allowed" and only "the most highly rated firm must physically come to the site" before pricing Question: Please confirm that no site visit is required before the SF330 submission. No site visit is required prior to SF330 submission. Laboratory and Special Room Rquirements: Presolicitation Notice, page 7, Evaluation Criteria 2, Specialized Experience and Technical Competence: "laboratory requirements for the firm" Supplement B, page 18, Section B6.II.1: "floor plans of special rooms such as the endoscopy suite, recovery room, etc." Questions: Neither a laboratory nor an endoscopy suite or recovery room appears in the project scope. Do any of these requirements apply to this project? These requirements do not apply to this project. Can the VA please release updated and corrected documents? The evaluation criteria 2 will be changed to remove laboratory requirements for the firm and the COR will revise Supplement B to remove the endoscopy suite and recovery room from the Supplement B.
-Pre-Solicitation11/16/2026
657-27-111JB, Install Continuous Water Monitoring System  This modification is to correct the NAICS code to 238220 Plumbing, Heating, and Air-Conditioning Contractors. If you have submitted a response for NAICS code 236220 this response will not be considered. If eligible please resubmit under NAICS code 238220. This is a Sources Sought Notice to determine the availability of service disabled veteran owned small business (SDVOSB) firms for a possible small business category type set-aside for Construction Services project: This is a Sources Sought Notice that is issued for information and planning purposes only and is not to be construed as a commitment by the government, implied or otherwise to issue a solicitation or ultimately award a contract. An award will not be made on information received in response to this notice. This notice is not a Request for Proposal (RFP); it is a market research tool being utilized to determine the availability of sources prior to issuing a Best Value type RFP. PROJECT DESCRIPTION AND SCOPE This project will install continuous monitoring equipment for biocides, PH level, pressure and temperature at domestic cold water sources and hot water generation for VHA DIR 1061 Buildings, additional temperature sensors on the hot distribution will be installed at mid-point and end-of-line for each major distribution system of the buildings. Data will be back net capable for Building automation system (BAS) VA Johnson controls tie-in and real-time monitoring. Scope includes: JB Bldgs 3, 51, 52, 53, 59 Jefferson Barracks VAMC: Building 3: 1 incoming cold water continuous monitoring with pressure and temperature 1 cold water distal Furthest point from incoming cold water 1 hot water distal Furthest point from incoming hot water 1 hot water source equipment supply temperature 1 hot water source equipment return temperature Monitoring cold and hot temperature at midpoints at each riser Building 51: 1 incoming cold water continuous monitoring with pressure and temperature 2 cold water distal -Furthest point from incoming cold water 1 hot water distal Furthest point from incoming hot water 1 hot water source equipment supply temperature 1 hot water source equipment return temperature Monitoring cold and hot temperature at midpoints at each riser Building 52: 1 incoming cold water continuous monitoring with pressure and temperature 1 cold water distal Furthest point from incoming cold water 1 hot water distal Furthest point from incoming hot water 1 hot water source equipment supply temperature 1 hot water source equipment return temperature Monitoring cold and hot temperature at midpoints at each riser Building 53: 1 incoming cold water continuous monitoring with pressure and temperature 1 cold water distal Furthest point from incoming cold water 1 hot water distal Furthest point from incoming hot water 1 hot water source equipment supply temperature 1 hot water source equipment return temperature Monitoring cold and hot temperature at midpoints at each riser Building 59: 1 incoming cold water continuous monitoring with pressure and temperature 1 cold water distal Furthest point from incoming cold water 1 hot water distal Furthest point from incoming hot water 1 hot water source equipment supply temperature 1 hot water source equipment return temperature Monitoring cold and hot temperature at midpoints at each riser Provide full training of new water monitoring equipment and basic I&C training relating to this project. Contractor work must fully comply with VHA Directive 1061 The intent of this notice is to identify potential Small Business firms capable of performing these services. The Government will use the information obtained from this sources sought announcement to make a set-aside determination including further restriction under a socio-economic status, firms must identify their socio-economic status for NAICS code 238220 Plumbing, Heating, and Air-Conditioning Contractors. The appropriate North American Industry Classification System (NAICS) code for this acquisition is 238220 with the applicable business size of 19.0 million. If interested in this opportunity, please provide via email a Capability Statement: The Capability Statement is designed to inform the Department of Veteran Affairs, of any prospective construction contractors' project execution capabilities. The submission is limited to 10 single sided pages which shall include the following information: 1) Offeror's name, address, point of contact, phone number, e-mail address, and EIN number; 2) Offeror's interest in bidding on the solicitation when it is issued; 3) Offeror's capability to perform a contract of this magnitude and complexity and comparable work performed within the past 5 years - brief description of the project, customer name, timeliness of performance, customer satisfaction, and dollar value of the project) - provide at least 3 examples; 4) Offeror's CVE certification as a Veteran owned business; 5) Please provide Socio-economic status for NAICS code 238220 Plumbing, Heating, and Air-Conditioning Contractors and provide percentage of self-performed labor your company can perform for this type of project; 6) Offeror's Joint Venture information if applicable - existing and potential; 7) Offeror's Bonding Capability in the form of a letter from Surety providing bonding level per contract and aggregate. The Response Due Date for this Sources Sought Notice is November 12. 2026 at 10:00 am Central Time. Respondents will not be notified of the results of analysis. Submit your responses to Jennifer.Hill@va.gov. PLEASE REFERENCE "SOURCES SOUGHT: 36C25527Q0052 Project 657-27-111JB, Install Continuous Water Monitoring System" IN THE SUBJECT LINE and first page of the response. The point of contact for submission of Capabilities Statement and questions is: Jennifer Hill Contracting Officer Email: jennifer.hill@va.gov NCO 15 Contracting Office Leavenworth, Kansas 66048 No basis for claim against the Government shall arise as a result of a response to this sources sought or Government use of any information provided. The Government will not pay for information or comments provided and will not recognize any costs associated with submission of comments. There is no guarantee, expressed or implicit, that market research for this acquisition will result in a particular set-aside, or any other guarantee of award or acquisition strategy. Respondents will not be contacted regarding their submission or information gathered as a result of this Sources Sought notice. Interested firms shall be required to respond to additional announcements separately from this announcement without further notice from the Government when posted to the Contract Opportunities website at https://sam.gov/. The Contract Opportunities website is the only official site to obtain these documents.
-Market Research11/09/2026

Additional Details

Solicitation Number

VA255-13-Q-1378

Archive Date

Jan 29, 2014