B1130 ROOF REPLACEMENT
Archived on March 28, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 4:00 PM EDT
- Posted
- March 6, 2026
- Notice type
- Sources Sought
- NAICS
- 238160: Roofing Contractors
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- AIR COMBAT COMMAND.FA4803 20 CONS LGCA
- Place of performance
- Sumter, South Carolina, 29151
- PSC
- Z2AZ: REPAIR OR ALTERATION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
- Last updated
- Nov 2, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- VLSB260069
- Notice ID
- 9ddc3271738642d78ce79053960c014a
Description
1. Description:
This is a Sources Sought Notice and is issued solely for market research and planning purposes to identify potential sources capable of providing the construction needs for a Design-Build (DB) contract to execute a complete roof replacement for Section A of Building 1130 (highlighted in the Condition Assessment Report) at Shaw AFB.
The contractor shall provide all design, engineering, labor, materials, equipment, and supervision necessary to:
a) Completely demolish the existing roofing system down to the structural concrete deck to include the elevator shaft roof.
b) Repair the spalls and cracks on the existing concrete deck. Prepare the concrete deck with a new air & vapor barrier and insulation board for a standing seam metal roofing retro fit/hugger system.
c) Design and install a new, fully compliant, Single Sloped Hydrostatic Standing Seam Metal Roofing hugger system incorporating an adequate slope to ensure positive water drainage/flow. The slope of the new SSMR will be directed to the back of the building. The height of the new SSMR must not be higher than the existing front building’s parapet wall height primarily to maintain the overall aesthetic of the building’s front. Demolish all parapet wall in the rear building area to incorporate a new external drainage system at the rear of the building. All existing drainage and appurtenances of the building is to be sealed and removed.
d) Design and install a new, 2-ply, cold-applied SBS Modified Bitumen roofing system, complete with new insulation for the elevator shaft. The system shall be drained via new scuppers designed to discharge water onto the new main standing seam metal roof.
e) Engineer and execute a comprehensive redesign of the drainage system, demolishing the 25 existing internal drains, in its entirety. The new external drainage system will be located at the back of the building. The sizing of the gutters, downspouts and tie-in locations to the storm drains must be designed to handle the massive volume and velocity of water from a 100-year storm event impacting the entirety of the new roof.
f) Demolish the existing penthouse roof access. Demolish all existing access past the floor below the roof as these appurtenances are no longer required. Provide all necessary renovations and additions to structurally frame and fill the opening left from the penthouse demolition. Provide all necessary renovations and additions to retain stairway functions, fire rating and overall operations after transformation (drop down ceiling, lights, fire protection system etc).
g) Remove and replace all metal coping on all the remaining parapet walls, including the elevator shaft.
h) Extend existing vents, roof curbs, ducts and other penetrations as required and flash properly.
i) Install a new Horizontal Lifeline System / Fall Protection System.
j) Ensure all work complies with the Unified Facilities Criteria (UFC), UFC 3-110-03 Roofing, the Shaw AFB Design and Construction Guide, and all attached specifications.
k) Accomplish the work while omitting/minimizing operational impact on the fully functional, 24/7 mission-critical B1130 facility.
2. Submission Requirements:
Interested vendors are invited to submit the following information:
Company Information
- Company name, address, and point of contact (name, email, phone)
- CAGE code and UEI (if available)
- Applicable NAICS codes
- Capabilities Statement
- Description of your ability to fulfill the listed requirements in the Statement of Work
- Indicate your ability to perform at Shaw, AFB.
3. Submission Instructions:
Response Deadline: 13 March 2026, 4:00 PM EST
Submission Method: Email responses to hutton.cobb@us.af.mil
Subject Line: Sources Sought Response - B1130 Roof Replacement.
Disclaimer: This Sources Sought is issued solely for information and planning purposes and does not constitute a solicitation. This notice shall not be construed as a commitment by the Government to issue a solicitation or award a contract. The Government will not reimburse any costs incurred.
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Files (11)
- Download
Attachment 07 - FOR CONSTRUCTION - Drawings Volume 2 Shaw AFB B1130.pdf
27 MBAdded in Sources Sought version 1Posted - Download
Attachment 03 - Shaw AFB Design Constr.pdf
6.9 MBAdded in Sources Sought version 1Posted - Download
Attachment 01 - CAR B1130-HQ_AF.pdf
5.7 MBAdded in Sources Sought version 1Posted - Download
Attachment 02 - Bldg 1130 I.R Scan Report.pdf
3.7 MBAdded in Sources Sought version 1Posted - Download
Attachment 09 - UFC_3-110-03.pdf
1.2 MBAdded in Sources Sought version 1Posted - Download
Attachment 08 - Modified Bituminous Roof System Specification.pdf
218 KBAdded in Sources Sought version 1Posted - Download
SOW VLSB 26-0069.pdf
195 KBAdded in Sources Sought version 1Posted - Download
Contract Environmental Provisions.pdf
201 KBAdded in Sources Sought version 1Posted - Download
DD Form 1354 - AUG 2022.pdf
96 KBAdded in Sources Sought version 1Posted - Download
CATEX list with examples.pdf
135 KBAdded in Sources Sought version 1Posted - Download
Attachment 04 - Thermal Board Insulation Specification.pdf
101 KBAdded in Sources Sought version 1Posted
Lifecycle
- 1Version 1Sources SoughtArchived
B1130 ROOF REPLACEMENT
- 3Version 3Sources SoughtArchivedCurrent
B1130 ROOF REPLACEMENT
Similar Opportunities
Additional Details
Solicitation Number
VLSB260069
Archive Date
Mar 28, 2026
Office Address
SHAW AFB, SC, 29152-5125