GovChime
Notice ID: 8b6e475bacbf412698a3e1a13d925600Sources Sought

M231/M232A2, Modular Artillery Charge System (MACS) Load, Assemble, and Pack (LAP)

Archived on December 31, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
3:00 PM UTC−05:00
Posted
November 27, 2024
Notice type
Sources Sought
NAICS
332993: Ammunition (except Small Arms) Manufacturing
Agency
Department of WarDepartment of the Army

Notice details

Office
W6QK ACC-PICA
Last updated
Jan 23, 2026

Identifiers

Solicitation number
W15QKN-25-X-117Y
Notice ID
8b6e475bacbf412698a3e1a13d925600

Description

The United States Army Contracting Command-New Jersey (ACC-NJ) on behalf of the Project Manager Combat Ammunition Systems (PM-CAS), both located at Picatinny Arsenal, New Jersey, is conducting market research to identify potential qualified sources that are capable of manufacturing and completing final delivery of the Modular Artillery Charge System (MACS) M231/M232A2 Load, Assemble, and Pack (LAP) for the 155mm Propelling Charges. The purpose of this market survey (W15QKN-25-X-117Y) is to obtain current information on the capability of potential sources to deliver MACS to support FY26 FY31 requirements. The MACS LAP consists of two (2) types of propelling charges, the M231 and the M232A2, and all associated packaging. It uses a "build-a-charge," incremental-based system; the M231 is used singularly or in pairs for Low Zones (1 & 2) and the M232A2 is used in groups of 3, 4 or 5 charges for High Zones (3, 4 & 5). The system is compatible with all current 155mm field artillery weapons. To be considered as a capable source for this effort, all interested parties must submit the requested information: Provide evidence of capabilities including an ability to produce a combined total of the M231 and M232A2 MACS at a production rate of up to 80,000 units per month and any capability to surge to 445,000 units per month; Past manufacturing experience with MACS or similar products within the last ten (10) years; Description of facilities, personnel (numbers, experience, specialized skill sets), key raw material sources, and environmental compliance as it relates to the above production efforts; Experience with respect to propellant handling/storage and other hazardous handling/storage; Provide evidence of in-house Quality Assurance System(s) to support the LAP program; Provide company name, address, telephone number, email address, technical point of contact, and company size (please specify as either a Large Business, Foreign-Owned Business, Small Business, Small Disadvantaged Business, 8(a) concern, Woman-Owned Small Business, Historically Underutilized Business Zone concern, Veteran-Owned Small Business, or Service-Disabled Small Business). All companies interested in this notice must be registered in System for Award Management (SAM). This market survey is for informational and planning purposes and shall NOT be construed as a Request for Proposal (RFP). The Technical Data Packages (TDPs) will be provided upon request for information only. Both the M231 and M232A2 TDPs are marked Distribution F (Further Dissemination only as directed by PM CAS). To receive the TDP, contractors are required to submit a signed and completed DD Form 2345 - Militarily Critical Technical Data Agreement; AMSTA-AR Form 1350 - Technical Data Request Questionnaire; and Non-Disclosure Agreement (NDA). If the TDP for this effort is provided, a Certificate of Destruction form shall be completed and submitted by any contractor in receipt of the TDP, upon this source sought notice closing. All information is to be submitted at no cost or obligation to the Government. If a formal solicitation is generated at a later date, a solicitation notice will be published. Please identify and appropriately mark any proprietary information submitted. All information provided will not be returned and will be held in confidential status. All market information sought in this notification must be provided within 15 days of this notice by electronic mail only at no cost to the Government. The point of contact for this requirement is Ms. Arian Sommers, arian.r.sommers.civ@army.mil and/or jennifer.m.hughes56.civ@army.mil, ACC-NJ (CCNJ-CA), Bldg.10, Picatinny Arsenal, NJ 07806-5000. All inquiries shall be made via e-mail only. Telephone inquiries will not be accepted.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

Select documents to download

Showing 4 of 4 items

Document
Source
Agency
Posted Date
File Size
Actions
Sources SoughtDEPT OF THE ARMYNov 27, 2024-
Sources SoughtDEPT OF THE ARMYNov 27, 2024-
Sources SoughtDEPT OF THE ARMYNov 27, 2024-
Sources SoughtDEPT OF THE ARMYNov 27, 2024-

Lifecycle

Solicitation:W15QKN-25-X-117Y
  1. Market Research

Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)

  1. Market ResearchCurrentNov 27, 2024

    M231/M232A2, Modular Artillery Charge System (MACS) Load, Assemble, and Pack (LAP)

    Notice 8b6e475bacbf412698a3e1a13d925600 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The U.S. Army Contracting Command – Rock Island at Picatinny (ACC-RI-PICA), Picatinny Arsenal, New Jersey 07806-5000, on behalf of the Office of the Project Manager for Combat Ammunition Systems (PM CAS), intends to issue competitive Request for Proposal (RFP) for the manufacture, Load, Assemble, and Pack (LAP), and final delivery of the 155MM M231 and M232 TYPE Modular Artillery Charge System (MACS) Propelling Charges. The MACS M231/M232 Type LAP meets the U.S. Army’s requirements for 155mm artillery propelling charges that are critical for and compatible with all existing 155mm artillery weapons systems and compliant with the Joint Ballistic memorandum of understanding. The 155mm M231/M232 MACS provides U.S. field artillery with a less-sensitive improved solid propelling charge system for use with current and future 155mm howitzer systems. The MACS is an evolution of the XM230 Unicharge, which was developed as a replacement for the family of four separate bag charges for the 155mm cannon artillery systems. The Unicharge was intended to be a single increment universal charge module that would provide needed zoning solutions for both 39-caliber and Extended Range Ordnance Assembly cannons by building up the charge. The MACS is currently a two-charge propellant system that offers improvement in operational flexibility, performance, logistic support, and cost when compared to the previous generation of bag propelling charges. The MACS LAP consists of two types of propelling charges, the M231 and the M232 TYPE, and all associated packaging. It uses a "build-a-charge," incremental-based system; the M231 is used singularly or in pairs for Low Zones (1 & 2) and the M232-Series is used in groups of 3, 4 or 5 charges for High Zones (3, 4 & 5). The system is compatible with all current 155mm field artillery weapons. The total maximum contract value will be $2,586,684,823.02, to include all contract awards, to procure up to an estimated 3,544,182 M231 and an estimated 15,000,000 M232 TYPE propelling charges. Contractors must be registered in the System for Award Management (SAM) database by accessing the SAM web site at http://www.sam.gov to be eligible for contract award and all correspondence must be in English. Estimated time for release of the solicitation is Quarter 2, FY27 (Q2FY27). However, if any interested sources intend to review, respond, and/or submit a response to the formal Solicitation; a DRAFT Solicitation is readily available to be provided via DOD SAFE, upon request. The MACS LAP of the 155mm M231 and the M232 TYPE Propelling Charges will be in accordance with Government Technical Data Packages (TDPs). The TDPs are coded as Distribution Statement D (Further Distribution authorized to the Department of War (DoW) and U.S. DoD contractors only. Other requests for this document must be referred to the controlling DoW office: PM CAS) and will be made available once the Solicitation has been released for this effort. A completed Military Critical Technical Data Agreement (AMSTA-AR Form 1350), and a completed Non-Disclosure Agreement (NDA) will be required prior to consideration to receiving the TDP. The POCs for any questions, DRAFT Solicitation, or the TDP request, this notification, and any requests/questions may be directed to Ms. Arian Sommers, at arian.r.sommers.civ@army.mil and Ms. Jennifer Hughes, at jennifer.m.hughes56.civ@army.mil. Telephone inquiries will not be accepted.
98%
Combined Synopsis02/15/2027
Amendment 0010 - The purpose Amendment 0010 is to incorporate the updated questions and answers attachment and to formally revise the Prototype Project Opportunity Notice (PPON) Volume IV row of the Section 3.2.1 table. Specifically, this amendment:1. Formally Incorporates Updated Attachments: The following updated attachments are incorporated into the solicitation and replace all previous versions: Attachment 35 Updated MACE Offeror Questions Addressed (Dated 11-12), incorporating Questions #32 and #33. Please note Attachment 35 has been uploaded as a Controlled attachment. PPON Document MACE Extended November 30 W15QKN-26-R-1C5R (Dated 11-12), revised to incorporate the updated attachment list in Section 11 and Volume IV row of Section 3.2.1 table. 2. Establishes Proposal Submission Boundaries: This correction ensures that the SOW Section 6.0 Milestone Table remains strictly in Volume III (Cost/Price) as a priced document, while the Section 889 Certification is properly submitted within Volume IV (Miscellaneous Agreement Documentation).Instruction to Offerors: All Offerors shall use the timelines, relative durations, and CLIN structures specified within these amended attachments (dated November 12, 2026) as the sole, definitive basis for their proposal submissions, including their Technical, Schedule (IMS), and Cost/Price volumes..***********************************************************************************************************************************End of Narrative 0010************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0009 - The purpose of this Amendment 0009 is to incorporate the updated questions and answers attachment, formally revise the proposal submission portal instructions in the Prototype Project Opportunity Notice (PPON) and to add Attachment 34. Specifically, this amendment: Formally Incorporates Updated Attachments and a new attachment: The following attachments are incorporated into the solicitation and replace all previous versions: Attachment 33 Updated MACE Questions Addressed (Dated 11-5), incorporating Questions #24 through #31 (including key clarifications regarding propellant GFE, NRE milestone formatting, and payload canister compatibility). Please note Attachment 33 has been uploaded as Controlled attachment. Attachment 34 12961016 Rotating Cover Band has been uploaded as Controlled attachment in response to question #28. PPON Document: PPON MACE EXTENDED November 30 W15QKN-26-R-1C5R Dated 11-5) has been revised to incorporate the updated attachment list in Section 11. Amends the PPON Submission instructions: The PPON Document: PPON MACE EXTENDED November 30 W15QKN-26-R-1C5R Dated11-5) has been revised in Section 3.1.13 to formally correct the submission portal from SAM.gov to Procurement Integrated Enterprise Environment (PIEE) Proposal Manager Module: Revised Text: 3.1.13 All proposal submissions shall be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE) Proposal Manager Module (https://piee.eb.mil) .The direct solicitation link may be accessed via the active solicitation notice on SAM.gov. Instruction to Offerors: All Offerors shall use the timelines, relative durations, and CLIN structures specified within these amended attachments (dated November 5, 2026) as the sole, definitive basis for their proposal submissions, including their Technical, Schedule (IMS), and Cost/Price volumes. **************************************************************************************************************************************End of Narrative 0009************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0008 - The purpose of this Amendment 0008 is to incorporate updated questions and answers, and issue revised solicitation attachments. Specifically, this amendment: Formally Incorporates Updated Attachments: The following updated attachments are incorporated into the solicitation and replace all previous versions: Attachment 30 Updated MACE Offeror Questions Addressed (Dated 10-29), incorporating Questions #20 through #23.Attachment 31 Updated MACE CLIN Matrix (Dated 10-29), to clarify that the due dates for CLINs 0001A and 0014A represent the initiation of NRE activities, and that payment may be earned across interim milestones per Question #23.Attachment 32 Updated Statement of Work (SOW) (Dated 10-29), removing the administrative reference to Attachment B in SOW Section 8.0 per Question #21.Amends the PPON Text: The Prototype Project Opportunity Notice (PPON Document: PPON MACE EXTENDED November 30 W15QKN-26-R-1C5R Dated 10-29) has been revised in Section 3.3.3 (Volume III, Cost/Price) to add the following language to the third paragraph: to include the interim milestone allocations for Non-Recurring Engineering (NRE) under CLIN 0001A and CLIN 0014A. The attachment list has been updated to incorporate the revised attachments. Instruction to Offerors: All Offerors shall use the timelines, relative durations, and CLIN structures specified within these amended documents as the sole, definitive basis for their proposal submissions, including their Technical, Schedule (IMS), and Cost/Price volumes.*******************************************************************************************************************************************************************************************************************************************End of Narrative 008 ******************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0007 - The purpose of this Amendment 0007 is to extend the solicitation response deadline, incorporate updated questions and answers, and issue revised solicitation attachments. Specifically, this amendment: Extends the Proposal Submission Deadline: The solicitation response deadline is extended from October 30, 2026, to 1500 EST on November 30, 2026. This extension is granted to ensure all potential offerors have sufficient time to conduct thorough analyses, address recent technical clarifications, and submit comprehensive, high-quality proposals that deliver the best value to the Government. As a result, the Prototype Project Opportunity Notice (PPON Document: PPON MACE EXTENDED November 30 W15QKN26R1C5R Dated 10-27) has been revised to reflect the new response deadline and the updated attachments list. Incorporates Updated Attachments: The following updated attachments are formally incorporated into the solicitation and replace all previous versions: Attachment 27 Updated MACE Offeror Questions Addressed (Dated 10-26), incorporating Questions #17 through #19.Attachment 28 Updated Statement of Work (SOW) (Dated 10-26), reflecting the revised anticipated award date of March 29, 2027, while maintaining relative milestone durations. Attachment 29 Updated MACE CLIN Matrix (Dated 10-26), incorporating dedicated Non-Recurring Engineering (NRE) line items pursuant to Question #17. Instruction to Offerors: All Offerors shall use the timelines, relative durations, and CLIN structures specified within these amended documents as the sole, definitive basis for their proposal submissions, including their Technical, Schedule (IMS), and Cost/Price volumes. ************************************End of Narrative 0007 ******************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0006 - The purpose of amendment 0006 is to update the Question and Answer document from Attachment 23 - Updated MACE Offeror Questions Addressed 10-5 to Attachment 26 - Updated MACE Offeror Questions Addressed 10-15. This amendment also updates the PPON (PPON MACE Extended Updated Attachments (Updated 10-15)) to add Attachment 26 to the attachment list.*********************End of Amendment 0006************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0005 - The purpose of this Amendment 0005 is to resolve the schedule discrepancies identified in the solicitation and provide the definitive baseline for all proposal submissions. Specifically, this amendment: The Government acknowledges the discrepancy between the delivery dates specified in the original Statement of Work (SOW) (Attachment 7) and the performance periods specified in the original MACE CLIN Matrix (Attachment 4), which was caused by the proposal submission extension in Amendment 0001. This Amendment 0005 provides a revised and corrected Statement of Work (SOW) and CLIN Matrix. All schedule milestones have been aligned to relative durations (Months After Agreement Award) to ensure a stable, executable performance period. Amendment 0005 also adds the Updated MACE Questions Addressed plus an updated PPON which lists the amended attachments. The following updated attachments are formally incorporated into the solicitation and replace all previous versions: Attachment 25 Updated Statement of Work (SOW) (Dated 10-6) Attachment 24 Updated MACE CLIN Matrix (Dated 10 6) Attachment 23 Updated MACE Questions Addressed (Dated 10-5) PPON Document MACE Extended Updated Attachments W15QKN 26R1C5R (Dated 10-6) All Offerors shall use the timelines, relative durations, and CLIN structures specified within these amended documents (updated attachments October 5 and 6, 2026) as the sole, definitive basis for their proposal submissions, including their Technical, Schedule (IMS), and Cost/Price volumes. *********************End of Amendment 0005************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0004 - The purpose of amendment 0004 is to update the Question and Answer document from Attachment 15 - Updated MACE Offeror Questions Addressed 9-17 to Attachment 16 - Updated MACE Offeror Questions Addressed 9-24. Amendment 0004 also serves as notification that 6 additional TDP documents have been uploaded to SAM.gov. Vendors who have already been approved for the TDP can access the documents immediately, and those not previously approved may request access through SAM. **********************************************End of Amendment 0004************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0003 - The purpose of this amendment 0003 is to add Attachment 15 - Updated MACE Offeror Questions Addressed 9-17 **************End of Amendment 0003************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0002 - The purpose of this amendment 0002 is to add Attachment 15 - MACE Offeror Questions Addressed. *********************End of Amendment 0002 Narrative **************************************************************************************************************************************************************************************************************************************************************************************************************************** Amendment 0001 - The purpose of this amendment 0001 is to extend the solicitation response deadline from September 30, 2026 to October 30, 2026. This extension is granted to ensure all potential offerors have sufficient time to conduct thorough analyses, address recent technical clarifications, and submit comprehensive, high-quality proposals which deliver the best value to the Government. As a result of the extension, the Prototype Project Opportunity Notice (PPON) has been revised to reflect the new response deadline. Attachment 1 - Terms and Conditions has been updated in Supplement 5, Sub Section number 2 Outside Funding Contribution Schedule to change the Basic Agreement Years from FY 2026, FY 2027, FY 2028 to FY 2027, FY 2028, FY 2029. ****End of Amendment 0001 Narrative****************************************************************************************************************************** 155mm Modular Artillery for Combat Effectiveness (MACE) - Please refer to Prototype Project Opportunity Notice (PPON) and attachments. Please note: Attachment 8 - Purchase Description and Attachment 9 - Packing and Unitization Drawings will be provided to Offerors upon request once the Offeror signs, completes and submits the following documents for contracting approval: Attachment 12 Technical Data Request Questionnaire; Attachment 6 Non-Disclosure and Non US Agreement plus Attachment 14 DD2345 Military Critical Technical Data Agreement. Please refer to section 8 of the PPON for further information.
85%
Solicitation11/30/2026
Base Bleed Stand Alone OTA - Please refer to attachments.
71%
Solicitation04/30/2026
amended to allow vendor to post revised offer and attempt to get competition
61%
Combined Synopsis09/08/2026
The Naval Surface Warfare Center, Indian Head Division (NSWC IHD), Contracts Department intends to issue a Firm-Fixed-Price (FFP) contract on a sole source basis to Northrop Grumman Systems Corporation. The NAICS is 332993. The Contractor shall develop and produce new Austempered Ductile Iron (ADI) 5 Inch Projectile Bodies compatible with the MK 45 Gun Weapon System. In accordance with 10 USC §4022, the Government will be awarding a follow-on FAR contract. The Naval Energetic Systems and Technologies (NEST) Request for Prototype Projects (RPP), under which this prototype OTA was awarded, included provisions for a follow-on production contract. The prototype OTA award for the ADI 5 Inch Projectile Bodies development and qualification was competitively awarded and the associated tasks mentioned above were delivered successfully and accepted by the Government as the basis for the prototype build. The participant in the OTA (Northrop Grumman Systems Corporation) successfully completed the prototype projects provided for in N001742390042. As such, the requirements of 10 USC §4022(f)(1) and DFARS 206.001-70 have been met and a follow-on contract for production can proceed without further competition. THIS NOTICE IS NOT A REQUEST FOR PROPOSAL. This acquisition is being pursued on a sole source basis under the statutory authority of 10 USC 4022(f)(1), as implemented in DFARS 206.001-70, Exception for prototype projects for follow-on production contracts. This notice of intent is not a request for competitive proposals nor does it restrict the Government from an ultimate acquisition approach; however, the Government will consider all responses received to this notice. A determination by the Government not to compete this requirement is solely within the discretion of the Government. This notice should not be construed as a commitment by the Government for any purpose. Requests for solicitation will not receive a response. All information is to be submitted at no cost or obligation to the U.S. Government. The U.S. Government reserves the right to reject, in whole or in part, any input as a result of this market survey. The U.S. Government is not obligated to notify respondents of the results of this survey. If a formal solicitation is generated at a later date, a solicitation notice will be published. All interested sources shall provide the organization name, address, point of contact, phone number, fax number, e-mail address, business size, taxpayer identification number, DUNS number, and CAGE Code. In addition, all interested sources shall provide a summary of their company’s capabilities. All responding sources must email their response submissions no later than 4:00 pm EST, 18 November 2026 to: Sean McAvoy, Contract Specialist NSWC IHD 3rd Avenue, Bldg. 61N Picatinny Arsenal, NJ 07806-5000 sean.p.mcavoy.civ@us.navy.mil
59%
Special Notice11/18/2026

Additional Details

Solicitation Number

W15QKN-25-X-117Y

Archive Date

Dec 31, 2024

Office Address

PICATINNY ARSENAL, NJ, 07806-5000