187th MXG Hanger Floor Resurfacing
Awarded on July 16, 2026. Full description on SAM.gov.
Overview
- Posted
- July 21, 2026
- Notice type
- Award Notice
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 238330: Flooring Contractors
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- NATIONAL GUARD BUREAU.JFHQ USPFO AL.USPFO AL PROCUREMENT.W7MT USPFO ACTIVITY ALANG 187
- Place of performance
- Montgomery, Alabama, 36108
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
- Award date
- Jul 16, 2026
- Award amount (SAM.gov award notice)
- $125.7K
Identifiers
- Solicitation number
- W50S6N26PA021
- Notice ID
- b3d8d251c0a94637b97f2aee00ebd0a9
- Award number (PIID)
- W50S6N26PA021
Description
This notice is to confirm the award of Contract No. W50S6N26PA021 for the 187th MSG/CES BLDG 1201 Hanger Floor Resurfacing project.
The work consists of providing all necessary supplies, equipment, and personnel to remove the existing floor surface and resurface the hangar floor at Dannelly Field, Montgomery, AL.
Award Overview
Award Number
W50S6N26PA021
Award Amount (SAM.gov award notice)
$125.7K
Award Date
Jul 16, 2026
Awardee
Awardee UEI
E9FGHTHPJC14
Awardee CAGE Code
1LYS9
Awardee Address
Belden, MS 38826, UNITED STATES
Original Solicitation
Notice ID: b3d8d251c0a94637b97f2aee00ebd0a9
Posted Date: Jul 21, 2026
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (12)
- Download
Solicitation Amendment W50S6N26QA0170001 SF 30.pdf
3.8 MBAdded in Solicitation version 6Posted - Download
Solicitation W50S6N-26-Q-A017 Questions and Answers.docx
18 KBAdded in Solicitation version 6Posted - Download
Current Epoxy Floor Product.pdf
12 MBAdded in Solicitation version 6Posted - Download
Site Visit Attendance Roster.pdf
163 KBAdded in Solicitation version 6Posted - Download
Solicitation - W50S6N26QA017.pdf
6.2 MBAdded in Solicitation version 4Posted - Download
2. SOO - HANGER B1201 Top Coat Floor Resurfacing.pdf
160 KBAdded in Solicitation version 4Posted - Download
Attachment 1 - AF3000.pdf
2.3 MBAdded in Solicitation version 4Posted - Download
Attachment 2 - A2.1 Floor Striping Floor Plan.pdf
1.7 MBAdded in Solicitation version 4Posted - Download
Attachment 3 - Hanger Floor Plan.pdf
226 KBAdded in Solicitation version 4Posted - Download
Attachment 4 - Specification 01-6116 VOC Content Restrictions.pdf
121 KBAdded in Solicitation version 4Posted - Download
Specification 09 9600-USER-High-Performance Coatings-06-26-2021.pdf
272 KBAdded in Solicitation version 4Posted - Download
DBA Wage Determination.pdf
240 KBAdded in Solicitation version 4Posted
Lifecycle
- 2Version 2SolicitationArchived
187th MXG Hanger Floor Resurfacing
- 5Version 5Award NoticeArchivedCurrent
Type changed from Solicitation to Award Notice
187th MXG Hanger Floor Resurfacing
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The U.S. Coast Guard Academy in New London, Connecticut, requires a qualified contractor to provide all labor, materials, equipment, supervision, transportation, and incidental services necessary to inspect, prepare, sand, refinish, cure, and clean Government-owned hardwood athletic basketball court flooring at Roland Hall Gymnasium, approximately 17,422 square feet and serviced annually, and Billard Hall Gymnasium, approximately 12,129 square feet and serviced bi-annually. Services shall include protection or reapplication of existing court markings as required, use of commercial-grade indoor athletic floor finishes, removal of Contractor-generated debris, compliance with applicable safety and facility requirements, and coordination with the Contracting Officer’s Representative to minimize disruption to Academy operations. | 59% | Combined Synopsis | 11/16/2026 |
The work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply. All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825. Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.16JUL2026 AMENDMENT 0001 corrects an administrative Site Visit date error. REMINDER: Acknowledge all amendments in your Bid Package. Update 27 July 2026: Site Visit sign in sheet and slides added to solicitation package. Update 28 July 2026: This update adds in additional drawing and room photos to further define scope of work, adds in additional site visit day and time for 4 August 2026 at 2:00pm EDT, and extends the bid due date to 12 August 2026 at 12:00pm EDT. Please resubmit base access request if planning on attending second site visit. Please acknowledge all solicitation amendments on the SF1442. Update 10 August 2026: This update extends the bid opening date from 12 August 2026 at 12:00PM EDT to Wednesday 26 August 2026 at 12:00PM EDT. This update also adds in another site visit for Wednesday 19 August 2026 at 2:00PM EDT. Please access original solicitation posting to access Base Access Request Form to attend site visit. Update 21 August 2026: This update adds in the 19 August 2026 site visit sign in sheet and the presentation slides. This update adds in an updated wage determination and bid extension due to outstanding RFIs. Bids are now due on Wednesday 9 September 2026 at 12:00pm EDT. Update 3 September 2026: This update adds in RFIs asked after the last site visit. Bid due date is not extended. Bids are still due on Wednesday 9 September 2026 at 12:00pm EDT. Update 9 September 2026. This update adds in two Bid Opening Abstract documents from the 9 September 2026 bid opening results. These results will only be published here in sam.gov. | 51% | Solicitation | 09/09/2026 |
The work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply. All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825. Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract. | 51% | Pre-Solicitation | Open |
Solicitation Number 36C24626Q1025 | 49% | Pre-Solicitation | 09/18/2026 |
THE PURPOSE OF THIS AMENDMENT IS TO EXTEND THE SOLICITATION. SEE NEW DUE BY DATE. | 49% | Combined Synopsis | 09/18/2026 |
Additional Details
Solicitation Number
W50S6N26PA021
Archive Date
Jul 31, 2026
Office Address
MONTGOMERY, AL, 36108-4824