GovChime
Notice ID: d5851c6053a348329de67341099fc4d0Solicitation

Replace Flooring Bldg 102 & Bldg 110

Archived on June 27, 2026. Original response deadline: . Full description on SAM.gov.

Description

The scope of work for this requirement involves removing approximately 1,260 square feet of vinyl and carpet flooring, reconditioning  approximately 4,825 square feet of existing floors in two separate buildings. The Contractor shall provide all necessary supervision, labor, materials, tools, and equipment necessary to accomplish the work, as identified in the Statement of Work.

The magnitude of this requirement is between $25,000 and $100,000.

A site visit is tentatively scheduled for Wednesday 27 May at 0800 PDT.  The designated rally point will be the west gate parking lot.  Parking space is limited, carpooling is strongly advised.  Offerors must complete the Defense Biometric Identification System (DBIDS) Prequalification and be listed on the base access form to obtain base access. Complete all fields under the CONTRACTOR/VENDOR/VISITOR INFORMATION section consisting of attendee names, citizenship, and DBIDS code (6-digit code). The base access form must be provided 5 business days before the site visit. Refer to Attachment, Base Access Request for additional instructions.

As required by 15 U.S.C. § 644(w), implemented by RFO FAR 36.101-4, the following information is provided to interested small businesses:

(A).  The National Guard Bureau (NGB) has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts, other than those described at FAR 43.204, DFARS 243.204 and Army FAR Supplement (AFARS) 5143.204.

(B).  Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the NGB is currently unavailable, however data for Department of the Army (which NGB reports to) is listed below:

Selected Agency: DEPT OF THE ARMY
Time to definitize after receipt of an adequate Change Order Definitization Proposal under Construction Contracts:    Number of Change Order Proposals definitized under Construction Contracts


30 days or less:    0
31 to 60 days:    1
61 to 90 days:    0
91 to 180 days:    0
181 to 365 days:    1
Greater than 365 days:    1
After completion of contract performance via a contract modification addressing all undefinitized equitable adjustments received during contract performance    2

Update 1: Questions and Answers, Images of Flooring and Drawings are attached.  

Full description on SAM.gov

Overview

Agency:
Department of WarDepartment of the Army
Office:NATIONAL GUARD BUREAU.JFHQ USPFO CA.USPFO CA PROCUREMENT.W7MX USPFO ACTIVITY CAANG 144
Posted:June 10, 2026
NAICS:238110: Poured Concrete Foundation and Structure Contractors
Last Updated:Aug 21, 2026
PSC:Z2JZ: REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
Set-Aside:Total Small Business Set-Aside (FAR 19.5)
Type:Solicitation
Place of Performance:Fresno, California, 93727

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Select documents to download

Showing 9 of 9 items

Document
Source
Agency
Posted Date
File Size
Actions
SolicitationDEPT OF THE ARMYJun 10, 2026409.71 KB
SolicitationDEPT OF THE ARMYJun 10, 2026454.58 KB
SolicitationDEPT OF THE ARMYJun 10, 20266.2 MB
SolicitationDEPT OF THE ARMYJun 10, 2026243.97 KB
SolicitationDEPT OF THE ARMYJun 10, 2026407.36 KB
SolicitationDEPT OF THE ARMYJun 10, 202690.68 KB
SolicitationDEPT OF THE ARMYJun 10, 2026131.93 KB
SolicitationDEPT OF THE ARMYJun 10, 20266.02 MB
SolicitationDEPT OF THE ARMYJun 10, 202624.51 KB

Lifecycle

Solicitation:W50S6T26QA021
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 3×
    SolicitationCurrentMay 19, 2026

    Replace Flooring Bldg 102 & Bldg 110

    Notice d5851c6053a348329de67341099fc4d0 on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location

Additional Details

Solicitation Number

W50S6T26QA021

Archive Date

Jun 27, 2026

Office Address

FRESNO, CA, 93727-2199