Notice ID: ea7e3111f7f54dfeb3d310543ecf438cSolicitation
Repair Apron Joint Sealant Scott AFB IL
Archived on August 14, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM UTC−05:00
- Posted
- July 28, 2021
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W7M6 USPFO ACTIVITY ILANG 126
- Place of performance
- Scott AFB, IL, 62225
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- W50S7S21R0001
- Notice ID
- ea7e3111f7f54dfeb3d310543ecf438c
Description
Mod 10: Added 4th questions and answers. Mod 9: Added missing set of 3rd questions and answers. Clarifying: The Base Contracting Officer will be present in the Office from 1200 to 1300 (1PM) on 7/30/2021 in order to recieve hand delivered submissions. Mod 8: Added 3rd questions and answers and discussed submitting proposals. The 30th is a "flex day" for the wing. If hand delivering proposals on that day, contact Contracting Office directly to coordinate delivery such that your proposal is recieved timely. Mail also is not typically directly delivered to Contracting. Ensure mailed proposals have adequate time for hard copies to be delivered. Mod 7: Added 2nd questions and answers Mod 6: Added document AMDT W50S7S21R0001 - 0001. Removed Past Peformance subfactors. Removed requirement for Exhibit C. Mod 5: Added 1st questions and answers. Mod 4: Added site visit notes Mod 2 and 3: Changed document permissions and uploaded revised documents. Mod 1: Added drawings. Description of Proposed Construction: The work specified consists of furnishing all labor, equipment, tools, materials, travel, licenses, and permits required to complete the project. Contractor shall bid the project in two sections, Base and Option. The base bid will be to complete the following for Zone 1 and Zone 2. The option will be to complete the following for Zone 3. The work shall be completed in compliance with UFC 3-260-04 and USAF AFI 31-101 and updated to all other codes, instructions and regulations. The Magnitude of this project is between $250,000.00 and $500,000.00. Construction/contract completion time is anticipated to be 150 days after notice to proceed to include inspection and punch list. See attachments for full solication details. The date for the pre-proposal conference is 13 July 2021, 9:00AM local time at the 126th ARW at Scott Air Force Base, IL. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the pre-proposal conference. All questions for the pre-proposal conference must be submitted by 1 July 2021 via email (preferred) to 126.ARW.MSC.Org@us.af.mil.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W50S7S21R0001- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationJun 5, 2021
Repair Apron Joint Sealant Scott AFB IL
- 11×SolicitationCurrentJun 22, 2021
Repair Apron Joint Sealant Scott AFB IL
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W50S7S21R0001
Archive Date
Aug 14, 2021
Office Address
SCOTT AFB, IL, 62225-5503