Notice ID: 93f6eba741e9413c8b6fe815c6c57461Combined Synopsis/SolicitationArchived
210th Engineering IT List of Materials
Archived on October 9, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM EDT
- Posted
- September 16, 2025
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 541519: Other Computer Related Services
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- NATIONAL GUARD BUREAU.W7NE USPFO ACTIVITY MAANG 102
- Place of performance
- Minnesota, 55111
- Last updated
- Nov 8, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W50S8025Q0032
- Notice ID
- 93f6eba741e9413c8b6fe815c6c57461
Description
https://marketplace.unisonglobal.com/fbweb/fbobuyDetails.do?token=%3D%3DQuNg6sF2CAgAFgsWU531xdQAAAAAHeAAgAgTFCGg%2FFzzqQbJAAyVXBA0Or
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Links (1)
- Solicitation and Buy Attachmentsmarketplace.unisonglobal.comPosted
Lifecycle
- 3Version 3Combined Synopsis/SolicitationArchivedCurrent
210th Engineering IT List of Materials
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
NIPR / SIPR drops Blanket Purchase Agreement - LOCAL AREA NETWORK (LAN)/DEPLOYABLE LOCAL AREA NETWORK (DLAN) ENGINEERING AND INSTALLATION SUPPORT TO NETWORK ENTERPRISE CENTER (NEC)The contractor shall provide personnel, management, and any other items and services engineering design, cable plant installation, telecom room remediation, fiber/copper installation and repair, SIPRNET/NIPRNET cabling to perform installation of task. The NIPR and SIPR network planning and engineering process encompasses comprehensive site surveys, requirements analysis, and secure architecture design to ensure strict compliance with DISA STIGs and DoD enterprise standards. The expected outputs of this phase include detailed Engineering Installation Plans (EIPs), complete Bill of Materials (BOM), updated Network Topology Diagrams, and draft System Security Plans (SSPs). To ensure mission alignment and security compliance, formal Government review and approval will occur at critical milestones specifically during the Initial Design Review (IDR) and Final Design Review (FDR) culminating in a formal Authority to Proceed (ATP) before any physical installation or network integration activities commence. This is a Sources Sought notice interested parties should provide a capabilities statement along with CAGE code and Small Business status. Notice for proposals for the Blanket Purchase Agreement will be posted later. | - | Market Research | 10/29/2026 |
This is a hybrid non-personal services and supply contract to provide the United States Army Aviation Center of Excellence (AVCOE) with Secure Video- Teleconferencing (SVTC) Lifecycle replacement and Technical Services in Building 101 at Fort Rucker, Alabama. The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the technology refresh as defined in the Statement of Objectives (SOO), except for those items specified as Government- furnished property (GFP) and services. | - | Market Research | 08/12/2026 |
The U.S. Army Corps of Engineers - St. Paul District is seeking a contractor to perform groundwater monitoring services in support of the Grand Encampment Dredge Material Placement Site Unload project along the Zumbro River near Kellogg, MN in Wabasha County. This solicitation is 100% set-aside for small business under NAICS 541380 with a size standard of $19 million. The contractor will collect water samples from three monitoring wells and up to four government-selected residential wells before, during and after the active unloading of the site in Spring 2027. During the active unload phase samples will also be collected from the river upstream of the site and from standing water within the active dredged-material placement/infiltration pit. Water samples will be analyzed by an environmental analytical testing laboratory accredited under the Minnesota Environmental Laboratory Accreditation Program (MNELAP) for all specified methods and parameters. Pre-Placement (Phase 1) samples will be collected and tested approximately 90, 60 and 30 days prior to the start of the active hydraulic transfer of stockpiled dredge materials to the upland placement site. Samples will be collected and tested during Active Placement (Phase 2) approximately 3, 17, and 31 days after the transfer begins, with options for additional sample collection and testing at approximately 45, 59 and 73 days after start of transfer. Post-Placement (Phase 3) samples will be collected and tested approximately 30, 60 and 90 days after the completion of the materials transfer. The contractor will prepare a final sampling and analysis report, submitted within 50 days of testing completion. All questions should be submitted in writing via the PIEE module Q and A section. Offers should be submitted via the PIEE Module. Click the first link in the Attachments/Links section. | - | Solicitation | 11/18/2026 |
Phase I Environmental Site Assessment at Lower Grey Cloud Islands | - | Solicitation | 11/11/2026 |
FY27 ASL Interpretation Services for USACE MVP | - | Solicitation | 11/13/2026 |
Additional Details
Solicitation Number
W50S8025Q0032
Archive Date
Oct 9, 2025
Office Address
OTIS ANGB, MA, 02542-1319