Notice ID: 32b08b4a3aba418d999eb244582993abSolicitation
VGLZ 162323: ADAL Fuel Cell & Corrosion Control, Bldg. 154
Archived on September 30, 2023. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 11:00 AM UTC−04:00
- Posted
- June 20, 2023
- Notice type
- Solicitation
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W7NF USPFO ACTIVITY MIANG 127
- Place of performance
- Selfridge ANGB, 48045
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W50S8523B0004
- Notice ID
- 32b08b4a3aba418d999eb244582993ab
Description
20 June 2023: Bid Opening Abstract and sign in sheet posted 16 June 2023 (as of 3:11 EDT) Addendum 2 incorporated into IFB terms. The contract writing system is error. There are a total of 4 Amendments issued not 5. Please acknowledget the amendment regardless. 16 June 2023: 1. Updated RFI Log dated 16 June 23 is added to this posting. An amendment will transpire soon. 14 June 2023: 1. Updated RFI and representational drawing added to this posting. 8 June 2023: 1. RFI Document is added to this posting. 2. Amendment 3 is issued. Amendment 3 incorporates Addendum 1 into the terms and conditions of this Invitation for Bids. All interested bidders are strongly advised to acknowledge this amdnement as failure to acknowledge will most likely lead to a non responsive determination. Non responsive offers shall not be considered for award. 5 June 2023: Amendment 2. Bid due date is now 20 June 2023. The time bids are due remains the same at 11:00 AM EDT 5 May 2023: Pre bid Site Vist Minutes and Sign in Sheet Posted 29 April 23: Amendment 1. The site visit has changed to Thursday, May 4, 2023 9:00 AM This project will provide a renovation to the facility, with small additions to the office area to provide enhanced support areas/offices. The administration and support areas, including office spaces, break room, toilet and locker rooms, workshops, and utility rooms are reconfigured with full-height, nonload bearing CMU partitions separating the shop spaces and support areas. Full height wall tile shall be applied to the toilet/locker/shower rooms. Remaining walls will have paint or epoxy finishes. Flooring will include carpetedoffices, rubber tiles in the break area, tile floors in the toilet and locker rooms, and epoxy in the corridors and shop spaces. Existing storefront openings, entries, and windows are to be replaced. The additions will match the existing building and consist of insulated metal panel above a concrete masonry and brick wall base. The hangar bay work will be completed in two phases. The first phase will renovate the east bay while maintaining operability of the west bay, with the second phase renovating the west bay after the east bay is operational. The hangar floor will require a new epoxy floor system. New door fabric and electrical service and controls upgrades for the hangar doors are included to allow for door operation by emergency generator as well as fire department operation by key on the outside of the building. New fall protection systems will be provided over the aircraft locations in each bay. The exterior work for this project will include the demolition of the existing concrete containment area, Jet Fuel JP-8 equipment, landscape, asphalt and concrete pavement, and Utilities, including sanitary sewer, water main, storm sewer, and electrical equipment. This project will include the construction of two additions totaling 1,325-sf and the reconfiguration ofthe existing 17,650-sf Fuel Cell/Corrosion Control Facility. Proposed site improvements includemodifications to the existing parking lot to support the east addition. Utility improvement to include relocated sanitary sewer lines, relocated storm sewer mains, and a new fire protectionwater main line. A new oil-water separator will replace the existing system located near the northeast corner of the existing system.A new 54 ft. tall/300,000-gallon prefabricated steel water storage tank and a pumping station willbe built to supply water for fire suppression to future renovated and constructed Hangars 3, 4,and 5 and Building 154. The new pumping station will provide a new 10 inch water distributionloop to the new water-based fire suppression systems and fire sprinkler systems in each of theHangars H154, H3, H4 and H5. A stub connection will be provided in at each hangar for future connection to the fire pump-loop system improvements. These utility improvements will require removal and replacement of asphaltic and concrete pavement, along with curb and gutter replacement.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W50S8523B0004- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 9×SolicitationCurrentApr 14, 2023
VGLZ 162323: ADAL Fuel Cell & Corrosion Control, Bldg. 154
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
***Amendment 0006 posted as of 10/20. ***Amendment 0005 posted as of 10/15. ***Amendment 0004 posted as of 9/22. ***Amendment 0003 posted as of 9/17. ***Amendment 0002 posted as of 9/10. ***Amendment 0001 posted as of 9/8. This RFP is for the MATOC Contractors identified only in W912P523D0001 through W912P523D0007. AIS INFRASTRUCTURE, LLC. CMS CORPORATION GEIGER BROTHERS, INC. HOWARD W. PENCE, INC. KIEWIT INFRASTRUCTURE CO. SHIMMICK CONSTRUCTION COMPANY, INC. WSP USA ENVIRONMENT & INFRASTRUCTURE INC. Dear MATOC Contractors: Reference is made to your Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOC), Numbers W912P523D0001 through W912P523D0007 to provide Design/Build Construction Services within the Great Lakes and Ohio River Division Mission Boundaries. We request you submit a price proposal for the Soo Lock Fire Alarm Modernization in Sault Sainte Marie, MI as detailed in the scope of work, drawings, and specifications posted at the System for Award Management (www.SAM.gov). All vendors must be registered in the SAM database at SAM.gov. The Request for Proposal (RFP) can be found by logging into the website as a vendor and searching for the solicitation number (W912QR-62373550). The basis for award of this task order will be based on the Lowest Evaluated Price. Factors that will be reviewed are offeror’s past performance, as found within the Contractor Performance Assessment System (CPARS), in addition to price (base plus all options). Price is considered more important than past performance. The Government will be pulling your CPARS reports and will review quality and timeliness provided on prior jobs similar in scope and magnitude in accordance with the attached scope of work. Your proposal should include a price breakdown and/or labor category table demonstrating the use of the binding rates included in your MATOC contract. The submitted price breakdown should include sufficient detail to allow the Government to verify that your proposed price incorporates the binding rates from your base contract. Any level of effort shown in the submitted information will not be used for evaluation purposes and will be used only to ensure that the proposal is in compliance with the binding rates from the base contract. Proposals that fail to submit a price breakdown or fail to use the binding rates from your MATOC will not be considered. The Government intends to evaluate proposals and award a contract without negotiations with offerors. Proposals submitted in response to this RFP shall be good for no less than 90 calendar days. NOTE: The target ceiling for award is $4,000,000.00. The Government cannot guarantee that funding will be made available above this amount. Proposals are due no later than 11:00 AM ET on 10 September 2026. Submit your proposal electronically through the Procurement Integrated Enterprise Environment (PIEE) solicitation module. Proposals not received by the stated date/time will not be considered. Please acknowledge receipt of this RFP by signing below in the space provided and returning to Megan Murphy via email at Megan.R.Murphy@usace.army.mil. Payment and Performance Bonds will be required for this project. Performance and Payment Bonds are required within 10 days after the date of award. The Notice to Proceed will be issued after receipt and approval of the bonds. All questions regarding this Request for Proposal (RFP) must be submitted via ProjNet. The website to access this system is www.projnet.org and the bidder inquiry key for this specific project is: (CYF3NK-7ZP2UW). Please see ProjNet instructions included in this RFP. If you have contractual questions, please contact Megan Murphy via email at Megan.R.Murphy@usace.army.mil. If an Offeror believes that the requirements in the RFP contain an error, omission, or are otherwise unsound; the offeror shall immediately notify the Contract Specialist in writing with supporting rationale. All Offerors is reminded that the Government reserves the right to award this RFP based on the initial proposals, as received, without discussion. 1. Purpose of this Notice: This notice is to inform the list of interested firms of an active solicitation and to outline the mandatory prerequisites required to obtain the restricted solicitation package, including drawings and specifications. 2. Procedure to Obtain Restricted Solicitation Documents: Contractors requesting access to the portions of the solicitation must have an active System for Award Management (SAM) Registration in order to receive access to the documents. Step 1: Ensure your firm has an active SAM Registration. Step 2: Request access to the restricted attachments by email to the following point of contacts with your company's information: To: Megan Murphy and Pat Duggins Email: Megan.R.Murphy@usace.army.mil and Patrick.J.Duggins@usace.army.mil Subject: Verification for W912QR-62373550 Body of Email: Include your company's CAGE Code and Unique Entity Identifier (UEI). Step 3: Upon Government confirmation of your SAM registration access will be granted within PIEE. | - | Solicitation | 10/30/2026 |
The purpose of this amendment is to provide the updated attachment TE-8 Sample-3 MO076 SOW, and to instruct contractors to include any assumptions used in the preparation of their estimates for each sample project within their joint scopings of their proposals. The due date will be extended to 3 April 2026. | - | Solicitation | 04/03/2026 |
The purpose of this synopsis is to gain knowledge of potential sources for this project including interested Small Business sources. This notice is for planning purposes only. All interested parties should respond. Stewart Air National Guard Base, Newburgh, NY may issue a solicitation and award of a contract for Bldg. 200 Energy Repairs/Upgrades, subject to availability of funds. The magnitude of this project is between $500,000 and $750,000. The project includes, but is not necessarily limited to: Removal and disposal of existing building components, installing motor-operated coiling overhead doors, window systems with insulated glass, insulated roof caps, and low-intensity gas-fired radiant heaters. All interested concerns will provide this office, in writing, a notice stating their positive intent to submit a proposal as a prime contractor no later than 19 March 2026. This notification, which shall not exceed five typewritten pages, must include (1) positive statement of intent to bid as a prime contractor, and (2) a completed and signed Source Sought Information Request Form and (3) A listing of projects completed during the past three years, both for government and private industry. The type of project, dollar value, Contract number, location, and Point of Contact are to be included. Indicate if you were prime or subcontractor, and if subcontractor, provide the name and point of contact for the prime contractor. (4) A brief outline of resources, subcontractors, and key personnel that would be used to accomplish the contract.In the event adequate Small Business contractors are not available for adequate competition for this project, it may be advertised as unrestricted. Information shall be provided via email to: joseph.kugler.1@us.af.mil. Include the following in the subject line- Sources Sought W50S8D26SS0001. No facsimile responses will be honored. | - | Market Research | 03/19/2026 |
The project’s general scope of work is to furnish all tools, equipment, material, permits, labor, supervision, and all other necessary resources to accomplish the following work: This project replaces a portion of the existing campus water loop piping and existing campus water loop isolation valves. The project also includes installing a water booster pump that will be powered by a new equipment branch of emergency power in Building 22. For the new equipment branch of emergency power to be added, new wiring will feed from Building 19 (generator building) utilizing an existing underground conduit to Building 22 to feed a new emergency power distribution panel which will replace the existing emergency power distribution panel that does not meet code requirements. Installation of a new automatic transfer switch and panelboard along with wiring and conduits will be required to create the new equipment branch of emergency power. The project will also disturb many portions of the existing asphalt roadways and parking lots as well as concrete sidewalks and curbing due to excavation work. The contractor shall patch or replace asphalt and concrete as shown on the drawings and repair any areas of the landscaping and lawn that get disturbed during the project. The existing campus water loop piping is located below many of the existing campus roadways and sidewalks, and it is anticipated that most of the new piping will be as well. Therefore, this project shall be completed in phases to allow campus access for employees and Veterans and maintain water service until a tie-in to an existing building service pipe is to take place. If a shutdown of water service for any building is required during the duration of the project, it must be coordinated with the COR. Period of performance is 300 calendar days from receipt of the Notice to Proceed. | - | Pre-Solicitation | Open |
4 November 2026- UPDATE The Industry Day will be conducted on 8 December 2026 from 0900-1100. Doors Open at 0830. Selfridge Air National Guard Base Dining Facility (Building 164) 44875 N. Jefferson Avenue Harrison Township, MI 48045 All attendees must register to attend the Industry Day. Each company is limited to three participants. Email the name and email address of up to three participants to the following people for additional information to obtain base access. Responses should be emailed to: Michael Dixon - michael.d.dixon82.civ@army.mil, David Best - david.m.best.civ@army.mil, and Amanda Bogue - amanda.m.bogue.civ@army.mil. The 127th Wing requires an adequately sized, properly configured, environmentally safe, and energy-efficient aircraft maintenance hangar complex and maintenance shops, in support of 21 Primary Aircraft Authorization (PAA) F-15 EX aircraft. Functional areas include bay space for maintenance and fuel cell / corrosion control, general maintenance shops, administrative, training, equipment and material storage, and clean/dirty transition space as well as utility and infrastructure upgrades necessary to support construction of the complex. (see attachment for additional information and instructions for responding to this notice) This attachment includes information for planned Industry Day. | - | Special Notice | 12/01/2026 |
Additional Details
Solicitation Number
W50S8523B0004
Archive Date
Sep 30, 2023
Office Address
SELFRIDGE ANGB, MI, 48045-5213