GovChime
Notice ID: 1bf10e971df4404ba91ae657beae64afSources SoughtArchived

Turnkey Eaton UPS Replacement & Installation

Archived on September 23, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM CDT
Posted
September 3, 2026
Notice type
Sources Sought
Set-aside
No Set aside used
NAICS
335999: All Other Miscellaneous Electrical Equipment and Component Manufacturing
Agency
Department of WarDepartment of the Army

Notice details

Office
NATIONAL GUARD BUREAU.JFHQ USPFO ND.USPFO ND PROCUREMENT.W7NT USPFO ACTIVITY NDANG 119
Place of performance
Fargo, North Dakota, 58102
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W50S88-26-Q-0120
Notice ID
1bf10e971df4404ba91ae657beae64af

Description

The 119th Wing (NDANG) in Fargo, ND is conducting market research under FAR Part 10 and FAR Part 12 to identify capable commercial sources (both Small and Large businesses) for a complete turnkey UPS replacement.

The purpose of this notice is to determine overall market capability and to identify potential Small Business sources (including 8(a), HUBZone, SDVOSB, and WOSB) for acquisition planning purposes. This is not a Request for Quote (RFQ) or Request for Proposal (RFP). No reimbursement will be made for any costs associated with providing information. All interested parties are encouraged to respond.

The contractor shall provide all equipment, labor, and licensed electrical services to:

  1. Deliver and install a new scalable UPS system in Building 542.
  2. Complete startup and connected-load testing.
  3. Disconnect, remove, and haul away/recycle the existing Eaton 9155 UPS and two external battery cabinets off-site.

Brand Name or Equal Equipment:

  • (1 EA) Eaton 9PXM UPS Frame (9PXM08AAXXX)
  • (2 EA) Eaton 4 kVA Split-Phase Power Module (9PXMSPPM)
  • (6 EA) Eaton Battery Pack (9PXMBAT)
  • (1 EA) Eaton 3U Hardwired Bypass Module (BPM125HW)
  • (1 EA) Gigabit Network Card (NETWORK-M3)
  • (1 EA) 3-Yr Onsite 7x24 Next Day Warranty (WFLN73XX-11000UC)
  • (1 JB) Turnkey Delivery, Installation, Startup, and Disposal

Key Technical & Site Specs:

  • Power: 208V Single-Phase / Split-Phase (existing 100A breaker is compatible as-is).
  • Footprint: Max 40" L x 24" W (single rack/tower, hot-swappable batteries, min 20 min runtime @ 1.7 kW load).
  • Site Access: Ground-level entrance, parking within 10 ft of door, 2 exterior steps, under 20 ft total carry distance.

Please email a reply (email body or attachment) with the following 4 items:

  1. Company & Size Info: Company Name, CAGE Code, UEI, POC, and Business Size (Small or Large Business) under NAICS 238210/335999 (including any socioeconomic categories: 8(a), HUBZone, SDVOSB, WOSB).
  2. Electrical Capability: Confirm you have licensed electrical support (ND license or reciprocal state) available to perform the on-site work in Fargo, ND.
  3. Delivery Lead Time: Estimated equipment lead time in calendar days After Receipt of Order (ARO).
  4. Product Offered: Eaton brand or "or equal" (attach standard spec sheet if proposing "or equal" if possible).

Response Deadline

  • Due Date: 8 Sep 2026 at 1:00 PM CST
  • Submit via Email To: Rachel Syverson at rachel.syverson@us.af.mil and Brian Erdmann at brian.erdmann@us.af.mil

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Brian L. Erdmann

Documents

No documents available.

Lifecycle

  1. 3
    Version 3Sources SoughtArchivedCurrent

    Turnkey Eaton UPS Replacement & Installation

    Notice 1bf10e971df4404ba91ae657beae64af on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W50S88-26-Q-0120

Archive Date

Sep 23, 2026

Office Address

FARGO, ND, 58102-1051