Notice ID: 7c2bdb2507614e329c34b3de9debc7b6Solicitation
Mobile Storage Solution
Archived on February 15, 2022. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 12:00 PM UTC−05:00
- Posted
- January 24, 2022
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 337215: Showcase, Partition, Shelving, and Locker Manufacturing
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W7NR USPFO ACTIVITY NYANG 109
- Place of performance
- Schenectady, NY, 12302
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- W50S8J22Q0002
- Notice ID
- 7c2bdb2507614e329c34b3de9debc7b6
Description
The purpose of Amendment 0003 is to update the overall Storage System dimensions. The SON is updated from "Shelving system must fit into an area no larger than 19.5 ft W x 9ft D x 92" H" TO "no larger than 20' 10" W x 9ft D x 8ft H". Due date for offers is not extended. See attached amendment for complete details. The purpose of Amendment 0001 and 0002 is to incorporate questions and answers provided during the site visit, to post pictures of the site, and to extend the offer due date. See attached amendments for complete details. The 139th AES at the 109th AW/ Stratton ANGB is in need of a mobile storage solution. Due to limitations of available space, the Spacesaver High Density System would provide the most optimal utilization of real estate, maximizing storage potential and filing solutions for future inventory, but similar and like products will be considered. Please see the attached Solicitation for details. Contractors should carefully reveiew the SON on page 3 and FAR 52.212-2 on page 14 for evaluation and award criteria. A site visit will be held on January 13, 2022 at 10AM EST at the Aeromedical Evaluation Squadron, Building 34, 1 Air National Guard Rd, Scotia, NY. Contractors are advised that face masks are required to be worn at all times when on base and social distancing will be strictly enforced. Finally, if you have been in close contact with a person who has been confirmed to have COVID-19 or if you are experiencing any signs or symptoms including Fever, Cough or Shortness of Breath, please stay at home. All attendees should email their first and las name to Christina.shorkey.1@us.af.mil to RSVP. This information must be provided NLT 4PM on Wednesday January 12, 2022 to secure a spot. All quotes shall be submitted electronically to 109.AW.FAL.MSC.Contracting@us.af.mil Any questions regarding this RFQ should be directed to Christina.shorkey.1@us.af.mil and nicholas.bastiani.1@us.af.mil
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W50S8J22Q0002- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 3×SolicitationCurrentJan 7, 2022
Mobile Storage Solution
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Amended to include set aside code. Metal Wardrobe Lockers, 18 in x 21 in x 78 in, Louvered, 1 Tier, 1 Unit Wide, Padlock Hasp, Steel, Fully Assembled, Medium Gray Color. Vendor must be able to off-load all materials with no assistance by Government. No loading dock at delivery location. | - | Combined Synopsis | 09/17/2026 |
LOCKERS | - | Combined Synopsis | 07/30/2026 |
Reason for amendment is to update CLIN OO1:- The two Blue-Gray 25 powered mobile systems shall have COMPATIBILITY with the existing powered mobile system. - Manufacturer of the existing powered mobile system is provided in the CLIN. - Alternative systems will be considered by the technical team.- Due to the sensitive nature of arms and security at the existing space, photos of the space will not be provided. Refer to the specific dimensions detailed in this synopsis for the layout. | - | Combined Synopsis | 04/20/2026 |
Amended to include set aside code. The electronic key storage system should provide a comprehensive solution for effectively controlling keys, assets, and personnel. It will utilize a computerized locking steel drawer and i Button/RFID key tag technology, eliminating the need for manual scanning or logging during transactions. The system will create a verifiable audit trail upon key removal, ensuring liability protection for DOTS and peace of mind for the directorate. During checkout, the selected key will light up so the customer can quickly locate it. The moment a key or asset is removed from the drawer, a verifiable audit trail is automatically created, protecting the DOTS customer and directorate from liability, and giving the directorate peace of mind. DOTS requires contractor support to establish a maintenance contract which will give the directorate the ability to properly manage, maintain and account for capable of storing 35 multi-key rings containing approximately 30 keys per ring and 150 vehicle key rings with credit card holders, one (1)or two (2) keys per ring. Software Support The contractor shall provide software support365 days a year, including updates and enhancements to the Electronic Key Storage System located in Building 9106. The software will only support the operation of the Key Storage System and will NOT be connected to the network via hardwire or Wi-Fi. Hardware Support The contractor shall provide hardware support and replacement for any non-operational hardware. This includes the repair or replacement of the Electronic Key Storage System and its components, including shipping costs. The contractor will ensure the work site is cleaned post-installation or repair. Included shall be shipping costs or replacement of equipment. The contractor will provide replacements for non-operational or problematic equipment. Nonoperational or problematic equipment is defined as the KeyTrak System not performing as it was designed to. All components will be covered by the contractor and should be replaced if not working properly: one (1) PC server, one (1)monitor, one (1) keyboard, one (1) fingerprint reader, one (1) mouse, one (1) printer.Warranty and Maintenance Warranty and maintenance services are vital for mission success and the organization?s ability to serve customers effectively. The contractor shall ensure that the Electronic Key Storage System is always functioning properly without physical security issues . This contract includes a service requirement for the duration of the base year plus four (4) option years if awarded. Maintenance/Repair of Electronic Key Storage System Annual maintenance support will be provided throughout the contract duration. The contractor must respond to issues within four (4) business days if the system is inoperable. Telephone support will be the first line of assistance. If are placement is determined to be needed, the contractor will coordinate the replacement and provide shipping of the component at no charge. | - | Combined Synopsis | 02/11/2026 |
Reason for amendment 0003 is to modify delivery dates and on-site storage in CLIN 26 and to add restricted base area access requirements in CLIN 27.Reason for amendment 0002 is to add installation diagram. Reason for amendment 0001 is to add delivery access information. Retail displays | - | Combined Synopsis | 11/12/2026 |
Additional Details
Solicitation Number
W50S8J22Q0002
Archive Date
Feb 15, 2022
Office Address
SCOTIA, NY, 12302-9572