109 AW - Repair Building 2A Sewer Line, Restrooms, and Lockers
Archived on May 12, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM EDT
- Posted
- April 21, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- NATIONAL GUARD BUREAU.JFHQ USPFO NY.USPFO NY PROCUREMENT.W7NR USPFO ACTIVITY NYANG 109
- Place of performance
- Schenectady, New York, 12302
- PSC
- Z2AA: REPAIR OR ALTERATION OF OFFICE BUILDINGS
- Last updated
- Nov 1, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W50S8J26Q0001
- Notice ID
- bf0d4ace4aa84161a9ef5d67c47ca612
Description
The purpose of this updated announcement is to post the site visit details including sign-in sheet, minutes and slide show which was provided immediately prior to the site visit. See attachments for complete details.
(i) This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued.
Solicitation number W50S8J-26-Q-0001 is issued as a Request for Quote (RFQ) for construction service to repair the main sewer line and renovate associated facilities in Building 2A at Stratton Air National Guard Base in Scotia, New York. Review the attached "SOW-Spec-Drawings VBDZ252200" for the full details of the project.
The Project Magnitude is between $750,000 and $1,000,000.
This acquisition is 100% set-aside for small business concerns for NAICS 236220 (Commercial and Institutional Building Construction) with a size standard of $45.0M.
This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov and https://www.acq.osd.mil/DPAP/dars/dfarspgi/current/index.html.
(ii) Pricing must be provided for all line-items. The line-item numbers and items, quantities, and units of measure (including options) are as follows.
0001 - Base Scope, Repair Sewer Line and Facilities, 1 Job.
0002 - Option 1, Corridor Repair, 1 Job.
0003 - Option 2, Male Locker Room, 1 Job.
Pricing must be valid for 90 Days after quote submission
Construction Wage Rates are applicable to this project are General Decision Number: NY20260002 – 01/30/2026 for Schenectady County, New York.
Performance and payment bonds are mandatory and must be furnished within 10 calendar days after award.
(iii) The 109th Airlift Wing has a requirement to provide all construction services and materials to repair the main sewer line and renovate associated facilities in Building 2A at Stratton Air National Guard Base in Scotia, New York. The existing sewer line is failing, with significant bowing and cracking that results in frequent clogs and soil contamination, necessitating a replacement. The base scope of work includes the replacement of approximately 142 linear feet of sewer pipe, replacement of 27 plumbing fixtures, asbestos abatement in the women's locker room, and a renovation of the affected restrooms, showers, and lounge areas. There are two options, including the repair and retiling of an approximately 2,784 sf corridor (Option1) and a renovation of the 1,200 sf male locker room, including asbestos abatement (Option 2).
(iv) Performance will occur at Stratton Air National Guard Base located at 1 Air National Guard Road Scotia, NY 12302. The project will begin within 14 days following the Notice to Proceed (NTP) and the project shall be completed within 120 days following the NTP.
(v) Provisions applicable to this solicitation are available on the attached "Provisions and Clauses" document.
(vi) Clauses applicable to this solicitation are available on the attached "Provisions and Clauses" document.
(vii) Quotes shall be provided electronically to 109.aw.fal.msc.contracting@us.af.mil. Quotes must be provided no later than 10:00 AM EDT on 27 April 2026. The point of contact for this solicitation is MSgt Joshua King and can be reached through this email.
(viii) Funds are not presently available for this acquisition. The Government anticipates funds will become available prior to award as this action has been identified on the National Guard priority list. No contract award will be made until appropriated funds are made available.
Award will be made to the offeror who represents the best value to the Government. Reference provision 52.212-2 on the "Provisions and Clauses" document for the evaluation factors.
A site visit will be offered at 10:00 AM EDT on 15 April 2026. To attend, provide the name of the attendee to 109.aw.fal.msc.contracting@us.af.mil no later than 5:00 PM EDT on 13 April 2026.
20 April 26 Amendment (Amendment 01): RFI Log and applicable documents have been posted as an attachment answering all RFIs received. Contractors are required to acknowledge receipt of this amendment with their quote submission.
21 April 26 Amendment (Amendment 02): RFI Log has been updated and posted as an attachment answering all RFIs received. Contractors are required to acknowledge receipt of this amendment with their quote submission.
In the event of a conflict between the original Statement of Work (SOW) and the answers provided in the RFI Log, the answers in RFI Log shall take precedence.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (11)
- Download
RFI Log - Updated 21 April 26.xlsx
13 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
Specs VBDZ252200 Repair Bldg 2A Sewer Line.pdf
16 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
P101.pdf
4.6 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
P201.pdf
4.0 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
251210049-1180A-STRAT_AB.pdf
830 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Repair B2A Sewer Line Restroom and Lockers Slides.pptx
606 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
Site Visit Minutes.pdf
129 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
Site Visit Sign In Sheet.pdf
88 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
Provisions and Clauses.pdf
146 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
SOW-Spec-Drawings VBDZ252200.pdf
1.4 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
WD NY20260002 Mod 1.txt
49 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
109 AW - Repair Building 2A Sewer Line, Restrooms, and Lockers
- 2Version 2Combined Synopsis/SolicitationArchived
109 AW - Repair Building 2A Sewer Line, Restrooms, and Lockers
- 3Version 3Combined Synopsis/SolicitationArchived
109 AW - Repair Building 2A Sewer Line, Restrooms, and Lockers
- 5Version 5Combined Synopsis/SolicitationArchivedCurrent
109 AW - Repair Building 2A Sewer Line, Restrooms, and Lockers
- 7Version 7Award NoticeArchived
Type changed from Combined Synopsis/Solicitation to Award Notice
109 AW - Repair Building 2A Sewer Line, Restrooms, and Lockers; Award Notice
Similar Opportunities
Additional Details
Solicitation Number
W50S8J26Q0001
Archive Date
May 12, 2026
Office Address
SCOTIA, NY, 12302-9572