GovChime
Notice ID: 8e4c47b92cd44bd584a80d0efd4e8bdfSolicitation

Ft Drum Construct Operations Space and Mobile Ground Control Station Shelter

Archived on September 1, 2023. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM UTC−04:00
Posted
August 22, 2023
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
Agency
Department of WarDepartment of the Army

Notice details

Office
W7NR USPFO ACTIVITY NY ARNG
Place of performance
Fort Drum, NY, 13602
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W50S8N23B0001
Notice ID
8e4c47b92cd44bd584a80d0efd4e8bdf

Description

Construction contract for Project #FPBB142001, Construct Operations Space and Mobile Ground Control Station (MGCS) Shelter at Wheeler Sacks Army Airfield, Fort Drum, NY. This action is being solicited for as a 100% total small business set-aside. The North American Industry Classif ication (NAICS) Code is 236210 and the size standard for small business is $45M average annual revenue for the past three years. Project magnitude is between $500,000 and $1,000,000. Persons intending on submitting a bid are highly encouraged to attend the Pre-Bid Conference and Site Visit. Solicitation and information, notices and amendments will be posted at https://sam.gov. Award will be made to the responsible bidder whose bid conforms to the invitation for bids and is most advantageous to the Government considering only price and price related factors. Funds are not presently available for this contract. Currently, the Government anticipates funds will become available prior to but no later than midnight 30 Sep 2023. This action has been identified on the National Guard priority list for award if funds become available and the prices received are within an awardable range. No contract award will be made until appropriated funds are made available.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W50S8N23B0001
  1. Market Research
  2. Pre-Solicitation
  3. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Market ResearchApr 12, 2023

    Fort Drum Projects

    Notice 3638d52dc34247fd916108ca9dfd27c0 on SAM.gov

  2. Pre-SolicitationMay 10, 2023

    Ft Drum - Operations Space and Mobile Ground Control Station Shelter

    Notice 9131d09c1a4f45a6b5117eab6b66a9d7 on SAM.gov

  3. 9×
    SolicitationCurrentMay 31, 2023

    Ft Drum Construct Operations Space and Mobile Ground Control Station Shelter

    Notice 8e4c47b92cd44bd584a80d0efd4e8bdf on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
SOLICITATION NOTICE - DESIGN-BUILD TO BUDGET (DB2B) Airborne Equipment Parachute Repair Shop, Yuma Proving Ground, Yuma, Arizona. The U.S. Army Corps of Engineers (USACE), Los Angeles District, has a requirement for the Design-Build to Budget (DB2B) of the Airborne Equipment Parachute Repair Facility at Yuma Proving Ground, Arizona.This acquisition is a 100 percent Total Small Business Set-Aside conducted in accordance with RFO FAR Part 19 and RFO FAR 36.101-2. The Government is utilizing a Two-Phase Design-Build strategy under a single solicitation. Phase 1 involves a qualification pre-selection process to shortlist up to three (3) of the most highly qualified offerors. Only those selected will be invited to Phase 2 via solicitation amendment. Award will be a competitive Firm-Fixed-Price contract made to the Highest Technically Rated Offeror within the fixed budget ceiling.NAICS: 236220 (Commercial and Institutional Building Construction), size standard $45,000,000.00. PSC: Y1EZ - Construction Of Other Industrial Buildings. Period of Performance: 760 calendar days from receipt of Notice to Proceed.SUBMISSION AND REGISTRATION REQUIREMENTS:Submission Portal: All proposals for solicitation W912PL26RA046 must be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Portal. In order to submit a proposal, contractors must first be registered with the Proposal Manager role in PIEE. Hard copy, email, or facsimile submissions will NOT be accepted.System for Award Management (SAM): All offerors, including any Joint Venture (JV) entities, must have an active and valid registration in the SAM database at the time of proposal submission to be eligible for award. Proposals from contractors without an active SAM registration will not be considered. Registration is free of charge.Amendments: All solicitation documents, amendments, and communications will be posted to both the SAM database and the PIEE Solicitation Portal. It is the responsibility of the offeror to monitor these websites for updates. The Government is not responsible for any inability to access the websites.All Offers and Bidders are also advised that this procurement may be delayed, canceled, or revised at any time during the solicitation, evaluation, and final award process.
60%
Solicitation10/29/2026
Pre-Solication notice change 0001: The purpose of this change is to notify prospective offerors of a revision to the anticipated project scope of work: The anticipated facility size is revised from approximately 13,000SF down to approximately 10,315 SF. PRESOLICITATION NOTICE (SYNOPSIS): DESIGN-BUILD TO BUDGET (DB2B) Airborne Equipment Parachute Repair Shop, Yuma Proving Ground, Yuma, Arizona The U.S. Army Corps of Engineers (USACE), Los Angeles District, intends to issue a Request for Proposal (RFP) for the design and construction of the Airborne Equipment Parachute Repair Shop (Airdrop Rigging Facility) located at Yuma Proving Ground (YPG) in Yuma, Arizona. This procurement is a 100% Total Small Business Set-Aside. Proposed Solicitation Number: W912PL26RA046 Product Service Code (PSC): Y1EZ – Construction of Other Industrial Buildings NAICS Code: 236220 – Commercial and Institutional Building Construction Small Business Size Standard: $45.0 Million Set-Aside Status: 100% Total Small Business Set-Aside Contract Type: Firm-Fixed-Price (FFP) Procurement Method: Two-Phase Design-Build Selection Procedures (in accordance with RFO FAR Subpart 36) Acquisition Strategy: Design-Build to Budget (DB2B) Best Value Tradeoff Process SCOPE OF WORK: The anticipated scope of work is for a complete design-build solution for a new, approximately 10,315 square foot climate-controlled Airdrop Rigging Facility. The facility must constructed in close proximity to the existing airdrop rigging, parachute repair facilities and aircraft loading site, to allow for environmentally controlled storage and inspection of rigged materials prior to airdrop. The scope of work includes, but is not limited to: Complete Design & Compliance: Develop a complete design that complies with DoD antiterrorism/force protection requirements (UFC 4-010-01) and ensures a minimum facility life of 40 years in accordance with DoD's Unified Facilities Criteria (including energy efficiencies, building envelope, and integrated building systems performance). Site Work & Utilities: Perform all site work to prepare the building site and account for storm drainage, including moderate site grading, demolition and relocation of an existing fire access lane, connection to nearby utilities, and the construction of a new septic system for sanitary sewer. This section also incorporates the full design, procurement, structural/electrical provisions, and installation of a overhead 50-ton crane. Facility Features: Construct the facility to include a partially raised loading dock, motorized roll-up doors, and specialized storage rooms with adequate spacing for tools, materials, and the joint inspection of materials within the building envelope. Aircraft Cargo Conveyance: Integrate a military aircraft cargo conveyance roller system (compatible with C-130 and C-17 cargo configurations) installed inside multiple high-bay rigging lanes, with the final quantity, layout, and configuration of lanes optimized by the Contractor to maximize throughput and rigging capacity within the fixed budget ceiling. Climate Control HVAC: Install all necessary facility climate-control systems, including self-contained cooling and heating HVAC systems (estimated at 170 tons of capacity) to maintain strict temperature and humidity parameters. Communications & Security: Provide complete communications infrastructure, conduits with pull strings placed under new roadways for future communication installations, and a closed-circuit television (CCTV) system. Commissioning & TAB: Provide full system testing, adjusting, and balancing (TAB) and total building commissioning. Warranty & Maintenance: Deliver a comprehensive warranty and a plan for long-term maintenance support. ACQUISITION STRATEGY This project is being executed as a Design-Build to Budget (DB2B) Two-Phase procurement utilizing the Best Value Tradeoff source selection process under RFO FAR Subpart 36.3 Two-Phase Design-Build Selection Procedures Budget Ceiling: The contract budget ceiling is $8,200,000.00. Offerors compete on value (quality, technical functionality, and durability via proposed "Betterments ") for that set price. Any proposal that exceeds the $8,200,000.00 price cap will be rated Unacceptable and will be ineligible for award or stipend. Selection Process: This will be a negotiated procurement using the Best Value Trade-Off source selection process. Phase I involves a pre-selection process in which the Government will shortlist up to 3 of the most highly qualified offerors. Only those selected during Phase I will be invited to participate in Phase II, which will be initiated through an amendment to the original solicitation. Both Phase I and Phase II will be evaluated in accordance with the evaluation criteria set forth in the solicitation. REGULATORY COMPLIANCE & LIMITATIONS ON SUBCONTRACTING Construction Magnitude: In accordance with RFO FAR 36.204, the estimated magnitude of construction for this project is Between $5,000,000.00 and $10,000,000.00. Limitations on Subcontracting: In accordance with RFO FAR 52.219-14 (Limitations on Subcontracting), the prime contractor must perform at least 15% of the cost of the contract, excluding the cost of materials, with its own employees for this general construction procurement. SAM.GOV and PIEE REGISTRATION Offerors must have and maintain active registrations in the following systems to be eligible for award: System for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at http://www.sam.gov/ to be eligible for a Government contract award. Joint Ventures (JV): If the Offeror is a Joint Venture, the JV entity shall have a valid SAM registration in the SAM database representing the JV as one distinct business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror. PIEE Portal: All proposal volumes must be submitted electronically through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) at https://piee.eb.mil/. It is the responsibility of the Offeror to register and confirm receipt of proposals in PIEE-SOL. SOLICITATION WEBSITE & DISTRIBUTION The official solicitation, when posted on or about 25 September 2026, will be available free of charge by electronic posting only and may be found at the Contracting Opportunities website on http://www.sam.gov/. Paper copies of the solicitation will not be issued. Telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed using Adobe Acrobat Reader. Amendments, if/when issued, will be posted to the above-referenced website for electronic downloading. This will be the only method of distributing amendments prior to closing; therefore, it is the Offeror's responsibility to check the website periodically for any amendments to the solicitation.
60%
Pre-Solicitation09/11/2026
FX74 Strategic Airlift Hangar, Naval Station Rota, Spain. Please see Solicitation Amendment 0006 SF30, AMENDMENT 0006 PDF, Attachment M - Lorax Plan Tree List, Attachment N - NAVSTA Rota Landscaping Guidelines and AMENDMENT 0006 Specifications.
60%
Solicitation04/16/2026
The U.S. Army Contracting Command - Rock Island, Rock Island, Illinois, has awarded 11 Indefinite-Delivery, Indefinite-Quantity Multiple-Award Task Order Contracts (MATOCs) resulting from Solicitation W519TC26RA020 (including Amendments 0001 through 0007). Under this five-year (1,826 calendar days) base ordering period MATOC, the awarded contractors will compete for task orders to execute design, build, facility modernization, and commissioning projects in support of the seven (7) Government-Owned, Contractor-Operated Army Ammunition Plants: Holston Army Ammunition Plant (Kingsport, TN); Iowa Army Ammunition Plant (Middletown, IA); Lake City Army Ammunition Plant (Independence, MO); Milan Army Ammunition Plant (Milan, TN); Quad City Cartridge Case Facility (Rock Island, IL); Radford Army Ammunition Plant (Radford, VA); and Scranton Army Ammunition Plant (Scranton, PA). Summary of all 11 MATOC pool awardees from the above-referenced solicitation: Note: Each contract award under this MATOC pool is publicized via a separate SAM.gov Award Notice; the complete list of awarded contractors is provided below in the attachment section of this Award Notice. Actual places of performance under this Multiple Award Task Order Contract (MATOC) will be designated on a task-order-by-task-order basis as requirements arise.
57%
AwardedOpen
The U.S. Army Contracting Command - Rock Island, Rock Island, Illinois, has awarded 11 Indefinite-Delivery, Indefinite-Quantity Multiple-Award Task Order Contracts (MATOCs) resulting from Solicitation W519TC26RA020 (including Amendments 0001 through 0007). Under this five-year (1,826 calendar days) base ordering period MATOC, the awarded contractors will compete for task orders to execute design, build, facility modernization, and commissioning projects in support of the seven (7) Government-Owned, Contractor-Operated Army Ammunition Plants: Holston Army Ammunition Plant (Kingsport, TN); Iowa Army Ammunition Plant (Middletown, IA); Lake City Army Ammunition Plant (Independence, MO); Milan Army Ammunition Plant (Milan, TN); Quad City Cartridge Case Facility (Rock Island, IL); Radford Army Ammunition Plant (Radford, VA); and Scranton Army Ammunition Plant (Scranton, PA). Summary of all 11 MATOC pool awardees from the above-referenced solicitation: Note: Each contract award under this MATOC pool is publicized via a separate SAM.gov Award Notice; the complete list of awarded contractors is provided below in the attachment section of this Award Notice. Actual places of performance under this Multiple Award Task Order Contract (MATOC) will be designated on a task-order-by-task-order basis as requirements arise.
57%
AwardedOpen

Additional Details

Solicitation Number

W50S8N23B0001

Archive Date

Sep 1, 2023

Office Address

LATHAM, NY, 12110-2224