180th FW Lift Station Repair
Archived on June 23, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 4:00 PM EDT
- Posted
- June 4, 2026
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237110: Water and Sewer Line and Related Structures Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- NATIONAL GUARD BUREAU.JFHQ USPFO OH.USPFO OH PROCUREMENT.W7NU USPFO ACTIVITY OHANG 180
- Place of performance
- Swanton, Ohio, 43558
- PSC
- Z2ND: REPAIR OR ALTERATION OF SEWAGE AND WASTE FACILITIES
- Last updated
- Oct 30, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W50S8S26QA009
- Notice ID
- cc2c46187f754b4d9e9205416d871cf8
Description
DESCRIPTION:
The contractor shall provide all management, tools, equipment, materials, labor, and supervision necessary to replace one submersible pump and one soft starter at the 180th Fighter Wing main lift station (ID: #3) located in Swanton, Ohio. All work shall be performed in strict accordance with the Performance Work Statement (PWS).
SCOPE OF WORK:
The required services include, but are not limited to, the following:
-
Removal & Disposal: Safe removal and environmentally compliant disposal of the existing failed submersible pump and soft starter components.
-
Brand Name Installation:
-
Procurement and installation of one (1) new Gorman-Rupp SF Series submersible pump (Model SFV4D).
-
Procurement and installation of one (1) new Allen-Bradley soft starter (fully compatible, like-for-like replacement for the existing SMC Flex model).
-
-
Integration & Testing: Execution of all necessary NEC-compliant electrical wiring, system start-up, and operational testing to verify proper pump cycling, alternation, and overall system integration.
-
Deliverables: Provision of required submittals, including technical cut sheets, as-built drawings, and comprehensive Operation and Maintenance (O&M) manuals.
PERIOD OF PERFORMANCE:
All work must be completed within 90 calendar days after the date of contract award.
CONTRACTOR RESPONSIBILITES:
In accordance with the PWS and federal labor laws, the contractor is responsible for:
-
Labor Wages: Strictly adhering to the attached Department of Labor Wage Determination. All contractor and subcontractor personnel must be paid the applicable prevailing wages for this area and labor category.
-
Deliverables: Providing all necessary submittals, including technical cut sheets and O&M manuals.
-
Testing: Conducting full operational testing and start-up to verify system restoration.
-
Documentation: Ensuring as-built drawings are provided upon project completion.
*See Attchments
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (5)
- Download
SAM_Questions and Answers.pdf
48 KBAdded in Solicitation version 3Posted - Download
Brand Name Requirement_Redacted.pdf
413 KBAdded in Solicitation version 1Posted - Download
Solicitation - W50S8S26QA009 Professional Appearance.pdf
3.1 MBAdded in Solicitation version 1Posted - Download
Lift_Station_Repair_PWS.pdf
210 KBAdded in Solicitation version 1Posted - Download
Lift_Station_Repair_Wage-Determination.pdf
84 KBAdded in Solicitation version 1Posted
Lifecycle
- 1Version 1SolicitationArchived
180th FW Lift Station Repair
- 3Version 3SolicitationArchivedCurrent
180th FW Lift Station Repair
Similar Opportunities
Additional Details
Solicitation Number
W50S8S26QA009
Archive Date
Jun 23, 2026
Office Address
SWANTON, OH, 43558-9645