GovChime
Notice ID: cc2c46187f754b4d9e9205416d871cf8SolicitationArchived

180th FW Lift Station Repair

Archived on June 23, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:00 PM EDT
Posted
June 4, 2026
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237110: Water and Sewer Line and Related Structures Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
NATIONAL GUARD BUREAU.JFHQ USPFO OH.USPFO OH PROCUREMENT.W7NU USPFO ACTIVITY OHANG 180
Place of performance
Swanton, Ohio, 43558
PSC
Z2ND: REPAIR OR ALTERATION OF SEWAGE AND WASTE FACILITIES
Last updated
Oct 30, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W50S8S26QA009
Notice ID
cc2c46187f754b4d9e9205416d871cf8

Description

DESCRIPTION:

The contractor shall provide all management, tools, equipment, materials, labor, and supervision necessary to replace one submersible pump and one soft starter at the 180th Fighter Wing main lift station (ID: #3) located in Swanton, Ohio. All work shall be performed in strict accordance with the Performance Work Statement (PWS).

SCOPE OF WORK:
The required services include, but are not limited to, the following:

  • Removal & Disposal: Safe removal and environmentally compliant disposal of the existing failed submersible pump and soft starter components.

  • Brand Name Installation:

    • Procurement and installation of one (1) new Gorman-Rupp SF Series submersible pump (Model SFV4D).

    • Procurement and installation of one (1) new Allen-Bradley soft starter (fully compatible, like-for-like replacement for the existing SMC Flex model).

  • Integration & Testing: Execution of all necessary NEC-compliant electrical wiring, system start-up, and operational testing to verify proper pump cycling, alternation, and overall system integration.

  • Deliverables: Provision of required submittals, including technical cut sheets, as-built drawings, and comprehensive Operation and Maintenance (O&M) manuals.

PERIOD OF PERFORMANCE:
All work must be completed within 90 calendar days after the date of contract award.

CONTRACTOR RESPONSIBILITES:

In accordance with the PWS and federal labor laws, the contractor is responsible for:

  • Labor Wages: Strictly adhering to the attached Department of Labor Wage Determination. All contractor and subcontractor personnel must be paid the applicable prevailing wages for this area and labor category.

  • Deliverables: Providing all necessary submittals, including technical cut sheets and O&M manuals.

  • Testing: Conducting full operational testing and start-up to verify system restoration.

  • Documentation: Ensuring as-built drawings are provided upon project completion.

*See Attchments

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (5)

  • SAM_Questions and Answers.pdf

    48 KBAdded in Solicitation version 3Posted
    Download
  • Brand Name Requirement_Redacted.pdf

    413 KBAdded in Solicitation version 1Posted
    Download
  • Solicitation - W50S8S26QA009 Professional Appearance.pdf

    3.1 MBAdded in Solicitation version 1Posted
    Download
  • Lift_Station_Repair_PWS.pdf

    210 KBAdded in Solicitation version 1Posted
    Download
  • Lift_Station_Repair_Wage-Determination.pdf

    84 KBAdded in Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1SolicitationArchived

    180th FW Lift Station Repair

    Notice 5aa5e66aa5264bd28f17e73c8941f15e on SAM.gov

  2. 3
    Version 3SolicitationArchivedCurrent

    180th FW Lift Station Repair

    Notice cc2c46187f754b4d9e9205416d871cf8 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

W50S8S26QA009

Archive Date

Jun 23, 2026

Office Address

SWANTON, OH, 43558-9645