Notice ID: ab55f8cb41984a608e3dd28e516bb0fdSolicitation
129 RQW - Gas Line Repair for Santos Road
Archived on September 28, 2022. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:20 PM UTC−07:00
- Posted
- August 30, 2022
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237120: Oil and Gas Pipeline and Related Structures Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W7MX USPFO ACTIVITY CAANG 129
- Place of performance
- Moffett Field, CA, 94035
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- W50S8X22QA010
- Notice ID
- ab55f8cb41984a608e3dd28e516bb0fd
Description
129 MSG/MSC intends to utilize this Request for Quote (RFQ), under solicitation number W50S8X22QA010, to award without discussion, a Firm Fixed Price (FFP) type contract to Gas Line Repair for Santos Road , at Moffett Air National Guard Base (Moffett ANGB), Santa Clara County, CA. Award will be made to the lowest price responsible quoter. The Government intends to select one contractor; however, the Government reserves the right to award no contract at all. Since award will be based on initial responses, quoters are highly encouraged to quote their most advantageous pricing in their initial response. This requirement is being solicited 100% Total Small Business Set-Aside. The NAICS code for this acquisition is 237120 and the Small Business size standard is $39,500,000.00. All prospective quoters must have a Commercial and Government Entity (CAGE) code and be registered with System for Award Management (SAM) at http://www.sam.gov. The Period of Performance for this requirement is 60 Calendar Days after Notice to Proceed (NTP). Refer to solicitation for additional information. The contractor is responsible to furnish and install all labor and materials to complete the items listed in the Statement of Work. Vendors shall respond to this RFQ via email by 13 September 2022 at 1400 hours (2:00 pm) Pacific Time. All quotes should be sent to the Contracting Officer, Dana Johnson at dana.johnson.16@us.af.mil before the due date and time specified. Any quotation received after the exact time specified for receipt of quotes is considered late . All quoters must list DUNS number, CAGE code, and Federal TIN with Company name, POC, and phone number. To obtain or renew a Unique Entity ID or CAGE code, please visit https://www.sam.gov. Lack of registration in the SAM database will make a quoter ineligible for award. Vendor must also be registered in Wide Area Work Flow to receive payment through electronic funds transfer. If you are not currently registered, please visit the following website https://piee.eb.mil/ to complete your registration. All questions regarding the RFQ package must be submitted, in writing, to the above e-mail address by 7 September 2022 at 1700 (5:00 pm) Pacific Time. Telephone calls will not be accepted. Any questions received after this date and time may not be answered. Notice to quoters: The Government reserves the right to cancel this RFQ, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse a quoter for any costs. Submitted quotations shall be valid for 30 days after the closing date of the RFQ. When returning the solicitation (standard form 1442), please complete the following: 1. Company Information (Name & Address) and CAGE Code in Block 14. 2. Blocks 30a., 30b., and 30c. 3. Pricing beginning on Page 4 (unit price and total amounts for Item 0001) 4. Complete information in all applicable "fill-in" provisions and clauses or provide the SAM annual electronic versions, as specified in the solicitation instructions. 5. Acknowledge all amendments by returning the signed SF30 with your SF1442 or populate the information on block 19 located on page 2 of the solicitation. Please Note (All info below is in Solicitation): Please contact the below to schedule a site visit: Name: SMSgt Dana Johnson (facilitator) Address: 680 MACON RD, MOFFETT FIELD, CA 94035 Telephone: 650-603-9276
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W50S8X22QA010- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- SolicitationCurrentAug 30, 2022
129 RQW - Gas Line Repair for Santos Road
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
This acquisition includes repairs and maintenance of three vertical above ground tanks located at Fort Hood, Texas. | 68% | Pre-Solicitation | 10/01/2026 |
This project includes repairs and maintenance of two vertical aboveground storage tanks located at Hurlburt Field, FL. | 68% | Market Research | 07/16/2026 |
********************************************************************************** This amendment is to update the response date to 10:00 AM (AST) Thursday, 8 October 2026. ********************************************************************************** SOURCES SOUGHT - REQUEST FOR INFORMATION FREEDOM CONNECTION NATURAL GAS PIPELINE THIS NOTICE IS FOR MARKET RESEARCH PURPOSES ONLY. THIS IS NOT A REQUEST FOR PROPOSAL (RFP) OR INVITATION FOR BID. This announcement seeks information from industry which will be used for preliminary planning purposes. This is not a solicitation for proposals, and no contract will be awarded from this synopsis. No solicitation, specifications or drawings are available at this time. 1.0 Introduction and Purpose The U.S. Army Corps of Engineers (USACE), Latin America and Caribbean District (SAA) is conducting market research for the construction of the Freedom Connection Natural Gas Pipeline in Puerto Rico. The results of this market research will help determine the final procurement strategy. USACE-SAA is issuing this follow up Request for Information due to changes in the design, scope of work and acquisition strategy. This request is to gain knowledge of interest, capabilities, and qualifications of Small Business concerns, certified HUBZone, 8(a), Woman-Owned Small Businesses, Economically Disadvantaged Woman-Owned Small Business, Service-Disabled Veteran Owned Business or Veteran-Owned Small Business. The responses or submissions will be used for informational and planning purposes only and do not constitute a commitment by the Government. The Government will not pay for any information submitted, and respondents will not be notified of the results. Submission or responses to this request for information is not a prerequisite for any potential future offerings. 2.0 Background The U.S. Department of Energy (DOE) is funding the Freedom Connection Project. The objective is to enhance the resilience of Puerto Rico’s northern power grid by improving fuel infrastructure. This project involves constructing an approximately 4.2-mile, 20-inch diameter natural gas pipeline to supply the Palo Seco Power Plant from the existing San Juan liquid natural gas (LNG) terminal. SAA anticipates soliciting and awarding one (1) design-bid-build solicitation in accordance with Federal Acquisition Regulation (FAR) Parts 15 and 36. The North American Industry Classification System (NAICS) Code is 237120 - Oil and Gas Pipeline and Related Structures Construction. The small business size standard for this NAICS code is US $45 million. The estimated magnitude of construction is between $25,000,000 and $100,000,000. Anticipated award date is in the second quarter of Fiscal Year 2027. Performance Period is 365 calendar days from NTP. 3.0 Scope of Work The scope of work includes all integrated procurement, labor, equipment, and services required to construct and commission the new pipeline based on a forthcoming final engineering design. Core responsibilities include: • Materials Procurement: Procure all necessary items, including long-lead items such as 20” steel pipe, valves, fittings, and instrumentation, ensuring compliance with the final design and industry standards. • Site Work: Prepare access roads and rights-of-way, and perform site clearing, grading, and stabilization. • Pipeline Installation: Execute all installation activities, including: Trenchless methods (e.g., Horizontal Directional Drilling - HDD). Open trench cut-and-cover installation. Pre-fabrication of materials. Pipeline welding, non-destructive testing (NDT), and inspection. Application of protective external coatings. Above-grade pipeline installation, potentially requiring more than 50 feet deep concrete piles. • Facilities Construction: Build all standalone facilities, including mainline block-valve stations and pig launcher/receiver stations, including electrical and instrumentation. • Delegated Design: Manage and execute any potentially delegated design elements (e.g., temporary works, trench shoring, specialized HDD drill profiles, or structural supports), including coordination with and sealing by licensed Professional Engineers. • Testing and Commissioning: Perform hydrostatic pressure testing, leak detection, and all pre-startup commissioning protocols. • Restoration and Handover: Restore all disturbed areas and formally transfer the completed pipeline and facilities to the owner/operator. 4.0 Requested Information for Capability Statement Interested firms must submit a capability statement (limited to 10 pages) that addresses the following. Responses should be tailored to demonstrate the firm's ability to successfully manage and execute this integrated procurement and construction project. Corporate Information & Experience 1. Company Profile: Provide your firm's name, address, point of contact (POC), CAGE Code, and Unique Entity Identifier (UEI). 2. Business Category: Specify your firm's socioeconomic status (e.g., Small Business, Service-Disabled Veteran-Owned Small Business (SDVOSB), HUBZone, 8(a), Woman-Owned Small Business). 3. Bonding Capacity: Include documentation from your bonding company showing current single and aggregate performance and payment bond limits. 4. Project Experience: Interested construction firms may provide no more than three (3) example projects where the interested firm served as the prime contractor. Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference. References may be used to verify project size, scope, dollar value, percentages and quality of performance. Example projects must be of similar size and scope. Projects similar in scope to this project include: Natural gas pipeline project of similar magnitude and complexity where your firm was responsible for both materials’ procurement and construction. Civil projects involving trenchless technologies like HDD, and work in dense urban or environmentally sensitive areas. Each project must comprise of detailed scope of the work, performance timeline, dollar value, customer name. Construction of pipelines of more than 1 mile in length including trenchless pipeline installation, including horizontal directional drilling, jack and bore, and other trenchless technologies. 5.0 Submission Instructions • Deadline: Responses must be submitted via email no later than 10:00 AM (AST), Tuesday, 24 September 2026. • Email To: Angel.J.Martinez@usace.army.mil and Meranda.R.Booth@usace.army.mil. • Format: No hardcopy or facsimile submissions will be accepted. The capability statement shall be limited to ten (10) pages. Any commercial brochures or currently existing marketing material may also be submitted. | 67% | Special Notice | 10/08/2026 |
Project is located in Mather, CA. Includes all work to install a sampling gauge hatch on a manway, install a clock type mechanical gauge on a manway, recoat the exterior of the tank, replace the collision barriers, add a catwalk that extends across the entirety of the tank, and replace the audible and visual alarms. o Fix the remote containment basin drainage issue. o Replace the asphalt on the NE side of the fueling facility. o Repair the refueler parking concrete. o Replace the dispenser fuel monitor with a non-coalescing filter and install a water draw off system with a hand pump. o Replace the asphalt near the loading/unloading facility with a concrete path. o Replace POL building of the same size and at the same location. o Complete supplying, installation, and testing ATG system on Fuel Storage Tank, AVGAS. o Relocate the generator that is inside the compartmentalized area. | 67% | Solicitation | 12/04/2026 |
Amendment 0002 is to provide a complete list of questions and answers from Bidder Inquiry in ProjNet. This is a total small business set-aside. All Work Complete for Tank 2186 Repair (R) including replace tank roof, repair issue piping, repair receipt piping, repair low suction piping, remove mechanical tape gauge, remove and replace spiral stairs, repair stilling well, re-install tank ATG system, repair shell manholes, replace tank chime sealant, repair containment area, repair tank grounding, repair weld spacing, and provide tank data plate. All Work Complete for Tank 2186 Maintenance (M) including replace tank and piping coatings, provide tank strapping charts, and perform final API 653 inspection. | 67% | Solicitation | 10/20/2026 |
Additional Details
Solicitation Number
W50S8X22QA010
Archive Date
Sep 28, 2022
Office Address