Notice ID: 33905d4f9cf7436caab74ac4e6dc962dAward NoticeAwarded
Lyndex Head, Right Angle
Awarded on March 30, 2023. Full description on SAM.gov.
Awarded tounder W519TC23P2218 (source: SAM.gov award notice)• $31.7K
Overview
- Posted
- May 8, 2023
- Notice type
- Award Notice
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
- Agency
- Department of War
Notice details
- Last updated
- Sep 9, 2025
- Award date
- Mar 30, 2023
- Award amount (SAM.gov award notice)
- $31.7K
Identifiers
- Solicitation number
- W519TC23Q2172
- Notice ID
- 33905d4f9cf7436caab74ac4e6dc962d
- Award number (PIID)
- W519TC23P2218
Description
AWARD NOTICE
Award Overview
Award Number
W519TC23P2218
Award Amount (SAM.gov award notice)
$31.7K
Award Date
Mar 30, 2023
Awardee
Awardee UEI
M42LHNRYFK21
Original Solicitation
Notice ID: 33905d4f9cf7436caab74ac4e6dc962d
Posted Date: May 8, 2023
Original Response Deadline: Not specified
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W519TC23Q2172- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- Pre-SolicitationMar 1, 2023
Lyndex Head, Right Angle
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Procurement and delivery of a unit purchase for mobile security barriers with a trailer to store and transport the barriers. | 56% | Combined Synopsis | 08/21/2026 |
Amendment to change NAICS from 237990 to 332999.THIS SOLICITATION IS REQUESTING REPAIR PARTS FOR A CATD6NLGP DOZER SN#CAT00D6NPMG502058. ALL QOUTES MUST INCLUDE FREIGHT FEES TO FORT DRUM, NY 13602ITEM1:LINK AS-TRAC, PN#6503506, QTY:2EAITEM2: SEGMENT-SPRO, PN#618077, QTY:10EAITEM3: BOLT, PN#6V0937, QTY:50EAITEM4:NUT, PN#7H3607, QTY:50EAITEM5:WASHER, PN#2S5658, QTY:50EAITEM6:BOLT, PN#1061642, QTY:4EAITEM7:BOLT, PN#1070719, QTY:4EAITEM8:BOLT, PN#6V1792, QTY:360EAITEM9:NUT, PN#1S1860, QTY:360EA | 56% | Combined Synopsis | 04/30/2026 |
The amendment 0003 is issued to extend the closing date from 26 OCT 2026 to 4 NOV 2026, 1300 Hrs (KST).// The amendment 0002 is issued to extend the closing date from 15 OCT 2026 to 29 OCT 2026, 1300 Hrs (KST). //The amendment 0001 is issued to extend the closing date from 1 OCT 2026 to 15 OCT 2026, 1300 Hrs (KST). //This pre solicitation is conducted under the logistic cost sharing (LCS) program. The Government anticipates issuing a solicitation for the purchase, installation, and integration of DoD Anti-Ram Listed Active Vehicle Barrier (AVB) systems and associated Access Control Point (ACP) control systems at the Morin and Main Gates, Osan Air Base, Republic of Korea (ROK). Under this commercial acquisition, the Contractor shall be responsible for the demolition, removal, and disposal of existing AVBs; executing all necessary foundation, civil, and electrical site work; and performing the complete installation, point-to-point wiring, and power integration of the newly furnished equipment. Additionally, the Contractor must execute complex Programmable Logic Controller (PLC) reprogramming and system integration across multiple gatehouses, overwatch booths, vehicle inspection centers, traffic lights, and communication enclosures to achieve a fully synchronized, fail-safe ACP operation capable of maintaining full security functionality under both normal and power-loss conditions. The Performance Work Statement (PWS) containing all specific technical, execution, and commissioning requirements is attached for upcoming solicitation. | 52% | Solicitation | 11/04/2026 |
This pre solicitation is conducted under the logistic cost sharing (LCS) program. The Government anticipates issuing a solicitation for the purchase, installation, and integration of DoD Anti-Ram Listed Active Vehicle Barrier (AVB) systems and associated Access Control Point (ACP) control systems at the Morin and Main Gates, Osan Air Base, Republic of Korea (ROK). Under this commercial acquisition, the Contractor shall be responsible for the demolition, removal, and disposal of existing AVBs; executing all necessary foundation, civil, and electrical site work; and performing the complete installation, point-to-point wiring, and power integration of the newly furnished equipment. Additionally, the Contractor must execute complex Programmable Logic Controller (PLC) reprogramming and system integration across multiple gatehouses, overwatch booths, vehicle inspection centers, traffic lights, and communication enclosures to achieve a fully synchronized, fail-safe ACP operation capable of maintaining full security functionality under both normal and power-loss conditions. The Performance Work Statement (PWS) containing all specific technical, execution, and commissioning requirements is attached for upcoming solicitation. | 52% | Pre-Solicitation | 08/31/2026 |
47% | Combined Synopsis | 11/27/2026 |
Additional Details
Solicitation Number
W519TC23Q2172
Archive Date
Jun 30, 2023
Office Address
ROCK ISLAND, IL, 61299-0000