Notice ID: 97990710b9694d469535c89f743af480Combined Synopsis/Solicitation
60 Ton Daikin Air Cooled Chiller Unit - Pine Bluff Arsenal
Archived on December 31, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 9:00 AM UTC−06:00
- Posted
- November 26, 2024
- Notice type
- Combined Synopsis/Solicitation
- NAICS
- 238220: Plumbing, Heating, and Air-Conditioning Contractors
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W6QK ACC-RI
- Place of performance
- White Hall, AR, 71602
- Last updated
- Jan 23, 2026
Identifiers
- Solicitation number
- W519TC25Q2019
- Notice ID
- 97990710b9694d469535c89f743af480
Description
The U.S. Army Contracting Command Rock Island (ACC-RI) is contemplating award of a Firm-Fixed-Price (FFP) purchase order contract for a 60 TON DAIKIN AIR-COOLED CHILLER UNIT to be provided to Pine Bluff Arsenal (PBA). PBA will install the units. The contractor shall complete unit start-up after PBA has completed installation. The requirements shall be completed in accordance with the Purchase Description, the Technical Data Sheet, and the specifications contained in this solicitation. This is a combined synopsis and solicitation for commercial items prepared in accordance (IAW) with the format in Federal Acquisition Regulation (FAR) Part 12 Acquisition of Commercial Items, and Part 13 Simplified Acquisition Procedures, as supplemented with additional information included in this notice. This solicitation document, and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2025-01, effective 12NOV2024, and Defense Federal Acquisition Regulation Supplement (DFARS) effective 10OCT2024. The complete text of any of the provisions and clauses may be accessed in full text at www.acquisition.gov. The corresponding NAICS code is 238220; the small business size standard is $19,000,000.00; and the Product Service Code (PSC) is E1NB. Delivery: The requested items shall be delivered, and start-up completed within 120 days after award to the following: Pine Bluff Arsenal 10020 Kabrich Circle Bldg. 53-990 Pine Bluff, AR 71602-9500 The following attachments are associated with this solicitation: Attachment 001: Price Matrix Attachment 002: Technical Data Sheet (Purchase Description Attachment A) *FULL SOLICITATION IS INCLUDED IN THE ATTACHMENTS SECTION OF THIS POSTING
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
Select documents to download
Showing 4 of 4 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Combined Synopsis/Solicitation | DEPT OF THE ARMY | Nov 26, 2024 | - | |||
| Combined Synopsis/Solicitation | DEPT OF THE ARMY | Nov 26, 2024 | - | |||
| Combined Synopsis/Solicitation | DEPT OF THE ARMY | Nov 26, 2024 | - | |||
| Combined Synopsis/Solicitation | DEPT OF THE ARMY | Nov 26, 2024 | - |
Lifecycle
Solicitation:
W519TC25Q2019- Combined Synopsis
- Combined SynopsisCurrentNov 26, 2024
60 Ton Daikin Air Cooled Chiller Unit - Pine Bluff Arsenal
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Description This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format in Revolutionary FAR Overhaul (RFO) (FAR) subpart 12.2, Solicitation, Evaluation, and Award as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued. This solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2026-01 (eff. 03/13/2026) FAR Deviation JAN 2026 (eff. 01/22/2026) VAAR DEVIATION FEB 2026 (eff. 03/17/2026) VAAM Alert 26-02 (eff. 10/28/2025) Acquisition Policy Flash 26-26 eff. 03/17/2026) 4. This solicitation is for Building 41 Isolation Valve Installation and the solicitation number is 36C25627Q0081. This solicitation is a 100% SDVOSB set-aside, and the Government anticipates awarding a firm-fixed price contract from this solicitation. The associated North American Industrial Classification System (NAICS) code for this procurement is 238220, with a small business size standard of $19M. The FSC/PSC is N048 Installation Of Equipment- Valves. The Central Arkansas Veterans Healthcare System is seeking to purchase the service for isolation Valves installed for steam and condensate lines IAW with attached statement of work. All interested companies shall provide quotations for the following: Supplies/Services: See Section B.2, Cost/Price Schedule Place of Performance/Place of Delivery Address: Eugene J. Towbin Healthcare Center Central Arkansas Veterans Healthcare System 2200 Fort Roots Drive B69 & B170 North Entrance North Little Rock, AR 72114 Site Visit is scheduled for November 03, 2026 at 9:30am. POC for site visit is Justin Harper at Justin.Harper2@va.gov. See attached statement of work for location. All questions are due by November 4, 2026 3PM CST. All quoters shall submit the following: Quotes should be emailed to joseph.warren@va.gov and received no later than 12:00 PM CST, November 09, 2026. Email subject line shall include, RFQ 36C25627Q0081 B41 Isolation Valve Installation . Quotes shall be submitted IAW Provision 52.212-1 Instruction to Offerors. Point of Contact Joseph Warren Contracting Officer joseph.warren@va.gov | - | Combined Synopsis | 11/09/2026 |
Admentment 01(27 October 2026): The purpose of this amendment is to: 1. Post the RFI Questions and Answers. 2. Post updated PWS with corrections from questions and answers. 3. Post Site Visit Sign in Roster. 4. Remove Clauses 52.225-1 and 52.225-3. All other terms and conditions remain unchanged. The Contractor shall provide all qualified personnel, transportation, tools, equipment, materials, and services required to install hard-wired refrigerant leak detection systems in 186 dormitory bedrooms within Buildings 750, 751, and 768 at Little Rock Air Force Base (LRAFB), Arkansas. The contractor shall accomplish all services below to meet the requirements in accordance with the attached Performance Work Statement (PWS). Site Visit: A site visit will be held on Friday, 23 October 2026 at 9:00 AM local time. Please meet at the Little Rock AFB Visitors Control Center no later than 8:45 AM to gain base access. RFIs: Questions are due via email to the POCs listed in SAM.gov Monday, 26 October 2026 at 1000 CST. | - | Solicitation | 11/02/2026 |
The purpose of this amendment is to: 1. Attach the updated PWS that includes the drawings and a picture. | - | Combined Synopsis | 10/30/2026 |
Operations Mechanical BPA | - | Solicitation | 12/11/2026 |
Portable Air Conditioners | - | Combined Synopsis | 11/17/2026 |
Additional Details
Solicitation Number
W519TC25Q2019
Archive Date
Dec 31, 2024
Office Address
ROCK ISLAND, IL, 61299-0000