Notice ID: cacf42c191134b44b394446b03f0039dSources Sought
Sources Sought Pool Services Aberdeen Proving Ground
Archived on November 18, 2023. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM UTC−04:00
- Posted
- October 4, 2023
- Notice type
- Sources Sought
- Set-aside
- 8(a) Sole Source (FAR 19.8)
- NAICS
- 561210: Facilities Support Services
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W6QK ACC-APG DIR
- Place of performance
- Aberdeen Proving Ground, MD, 21005
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- W56ZTN23R0017
- Notice ID
- cacf42c191134b44b394446b03f0039d
Description
The contractor shall prepare for opening, season operation, minor repairs and closing at the Shore Park Pool in the Aberdeen Area (AA) of Aberdeen Proving Ground (APG). This requirement is slated for the period of one (1) base year and four (4) option years. The pool shall have coverage for maintenance and operation as stated in the Draft PWS (attached). The pool times and dates are based upon the Family and Morale, Welfare and Recreation (FMWR) requirements. The pool is anticipated to be open to the public from 12:30 AM through 7:00 PM, Monday through Sunday. Other scheduled activities require the pool to open earlier and stay open later. A schedule will be provided with updates of all activities throughout the Period of Performance (PoP).
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W56ZTN23R0017- Market Research
Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)
- Market ResearchCurrentOct 4, 2023
Sources Sought Pool Services Aberdeen Proving Ground
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
See attached. Limited Sources FAR GSAR 538.7104-3(b)(1)(ii) (and FAR 8.401(b) This justification is for the Consumer Product Safety Commission (CPSC), Office of Procurement Services. CPSC awarded 61320627F0007 to EMCOR Government Services, on a sole-source basis for specialized office renovations. CPSC requires specialized office renovations in the U.S. Government Accountability Office (GAO) building. The total estimated value of the award is $436,996.41 which includes the necessary renovations to prepare offices for employees. Only one source is capable of providing the supplies or services required, following procedures would result in unacceptable delays. EMCOR is the GSA contractor that provides renovations to the GAO building. They are contracted to complete renovations. The contracting officer has determined that the order represents the best value consistent with 538.7104-3(b)(1)(ii). The price is deemed fair and reasonable based on Federal Supply Schedule Contract: 47QSHA19D0044 In accordance with FAR 8.404(d), the General Services Administration (GSA) has already determined the prices of supplies and fixed-price services under Federal Supply Schedule contracts to be fair and reasonable. This justification will be posted to SAM.gov within 14 days of award. The requirement cannot be modified to enhance competition, because the proposed contractor is the only one who can provide the renovations. The contracting officer certifies that the justification is accurate and complete to the best of the contracting officer’s knowledge and belief. Technical personnel who provided supporting data, which forms the basis for this justification have certified that the information is complete and accurate. The contracting officer has determined that the circumstances at FAR 538.7104-3(b)(1)(ii) apply to this acquisition. | - | Sole Source / J&A | Open |
Presolicitation Notice Presolicitation Notice Page 5 of 5 Presolicitation Notice *=Required Field Presolicitation Notice Page 1 of 5 The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Building 1 Community Living Center (CLC) of the Loch Raven Campus. Primary Deliverables and Project Requirements Covid Ward 2nd floor B wing Upgrade exhaust fans Air Handling Unit (AHU-B) located in attic Replace and upgrade EF-1A and EF-1B for higher CFM outputs Install heat tracing for chillers Wiring and junction box located in room G-15. Chiller located outside CLC in the pit behind the service road. Assess current heat tracing for chill water line. Complete and terminate existing heat tracing wiring to an emergency electrical panel in G-17 in coordination with the VA. Panel selection is TBD. Install a 20-amp GFPE circuit breaker for the heat tracing to the panel selected by the VA. Kitchen basement Replace cooling coil(s) AHU-E located in attic. Replace fan motor AHU-E located in attic. AHU has one fan. New motor must be rated for and capable of sustaining a fan speed of 60Hz. Replace Variable Frequency Drive (VFD) VFD located in the attic and attached to the AHU Replace VFD in kind with Manufacturer (ABB) Controls Integration & Coordination VA has an existing contract with Johnson Controls International (JCI). The contractor shall coordinate with the COR and Facility Maintenance to satisfy necessities for the facility s existing Building Automation System (BAS) controls corresponding to all new work. Contractor will replace/reinstall or provide new hardware or connections for BAS monitoring when required to complete BAS programming or integration. This can include control wiring, modulators, switches, routing, existing equipment etc. These requirements are determined on a case-by-case basis. Testing Adjusting & Balancing (TAB) TAB shall occur after HVAC modifications are made. It must be performed by a certified vendor/contractor per TABB and/or other ANAB accredited programs for standard industry HVAC system performance compliance Contractor shall provide notice to and request attendance of the COR and/or other COR-approved VA representation prior to TAB. A report on the TAB results must be delivered to the COR. TAB report will be reviewed and approved by the VA prior to contractual closeout and final payment Warranty, Operations & Manuals (O&Ms) and Shop Drawings Contractor and/or subcontractor shall provide a warranty letter including point of contact, to the VA. Warranty is based on workmanship, material and equipment. Duration of warranty starts after acceptance and use of new equipment & components O&Ms for all new equipment and other components requiring preventative maintenance shall be provided to the VA. All O&M documents must be received by the VA prior to contractual closeout and final payment Contractor shall provide training to the VA. Shop Drawings All layout changes and new equipment shall be updated in as-builts, shop drawings, manufacturer diagrams, details, where applicable. Due to the nature of the contract, this requirement will be determined based on off application by the COR at completion of work. If no applicable documents are required, then the COR will opt for omission. Assumptions Contractor to provide a cost/unit for each of the deliverable items above and use the total amounts provided for their proposal. Contractor to track the quantities used on their pay applications with any amounts left over being returned to the government after final payment. All deliverables must be received by the VA prior to final payment. Line items will be tracked in every pay application. Financial progress for a line item will be cross-referenced with the corresponding item s physical progress and/or completion status. Misrepresentation of a line item s financial progress may result in rejection from the COR and require the contractor to resubmit the pay application with revision(s). Pay applications must be submitted with a total amount not to exceed the Purchase Order (PO) balance. A contract modification from the Contracting Officer (CO) is required for payment application submissions exceeding the PO balance. Additional work outside of the contract and contractual supplement documents (provided drawings, as-builts, details, existing product information, etc) require authorization and written execution from the CO. Any additional work (quantified via labor, material or equipment) performed/provided by the contractor without guidance from the VA or direction from the CO shall not be included in payment applications. The contractor is committed to working at their own expense and risk under this condition. Supplemental contractual and scope of work include existing as-builts, details and compliance for VA guidelines, federal & state guidelines, applicable codes, etc. VA can provide the contractor with additional available drawings and other documentation. These are considered items pertaining to the original contract s scope of work Standard Inclusions & General Compliance Contractor is responsible for cleaning the work area of trash regardless of if it is their trash or not. This includes areas that other entities may have access to like the attic and mechanical spaces. Contractor is responsible for stewardship of work area and compliance with VA medical facility guidelines. Contractor will adhere to VA-granted permitting requirements and industry standard safety practices including but not limited to: Infection Control Risk Assessment (ICRA) Pre-Construction Risk Assessment (PCRA) Hot or burn work Confined space entry work (if applicable) Lock out tag out (LOTO) procedures PPE Parking at the Loch Raven campus is limited and contractors are subject to facility guidelines for locations of contractor vehicles. Guidance for contractor parking is enforced by the COR, Facility Maintenance Supervisor, Campus Manager, and Deputy Medical Director. Parking outside the campus boundary is not in the VA s jurisdiction The contractor shall coordinate with the facility prior to work that impacts patient care such as shutting down A/C, heating, power or other utilities. Utility and HVAC shutdowns require at least a 14-day written request to the facility per the VA s internal Standard Operating Procedure. Period of performance is 90 calendar days. | - | Solicitation | 11/30/2026 |
The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Building 1 Community Living Center (CLC) of the Loch Raven Campus. Primary Deliverables and Project Requirements Covid Ward 2nd floor B wing Upgrade exhaust fans Air Handling Unit (AHU-B) located in attic Replace and upgrade EF-1A and EF-1B for higher CFM outputs Install heat tracing for chillers Wiring and junction box located in room G-15. Chiller located outside CLC in the pit behind the service road. Assess current heat tracing for chill water line. Complete and terminate existing heat tracing wiring to an emergency electrical panel in G-17 in coordination with the VA. Panel selection is TBD. Install a 20-amp GFPE circuit breaker for the heat tracing to the panel selected by the VA. Kitchen basement Replace cooling coil(s) AHU-E located in attic. Replace fan motor AHU-E located in attic. AHU has one fan. New motor must be rated for and capable of sustaining a fan speed of 60Hz. Replace Variable Frequency Drive (VFD) VFD located in the attic and attached to the AHU Replace VFD in kind with Manufacturer (ABB) Controls Integration & Coordination VA has an existing contract with Johnson Controls International (JCI). The contractor shall coordinate with the COR and Facility Maintenance to satisfy necessities for the facility s existing Building Automation System (BAS) controls corresponding to all new work. Contractor will replace/reinstall or provide new hardware or connections for BAS monitoring when required to complete BAS programming or integration. This can include control wiring, modulators, switches, routing, existing equipment etc. These requirements are determined on a case-by-case basis. Testing Adjusting & Balancing (TAB) TAB shall occur after HVAC modifications are made. It must be performed by a certified vendor/contractor per TABB and/or other ANAB accredited programs for standard industry HVAC system performance compliance Contractor shall provide notice to and request attendance of the COR and/or other COR-approved VA representation prior to TAB. A report on the TAB results must be delivered to the COR. TAB report will be reviewed and approved by the VA prior to contractual closeout and final payment Warranty, Operations & Manuals (O&Ms) and Shop Drawings Contractor and/or subcontractor shall provide a warranty letter including point of contact, to the VA. Warranty is based on workmanship, material and equipment. Duration of warranty starts after acceptance and use of new equipment & components O&Ms for all new equipment and other components requiring preventative maintenance shall be provided to the VA. All O&M documents must be received by the VA prior to contractual closeout and final payment Contractor shall provide training to the VA. Shop Drawings All layout changes and new equipment shall be updated in as-builts, shop drawings, manufacturer diagrams, details, where applicable. Due to the nature of the contract, this requirement will be determined based on off application by the COR at completion of work. If no applicable documents are required, then the COR will opt for omission. Assumptions Contractor to provide a cost/unit for each of the deliverable items above and use the total amounts provided for their proposal. Contractor to track the quantities used on their pay applications with any amounts left over being returned to the government after final payment. All deliverables must be received by the VA prior to final payment. Line items will be tracked in every pay application. Financial progress for a line item will be cross-referenced with the corresponding item s physical progress and/or completion status. Misrepresentation of a line item s financial progress may result in rejection from the COR and require the contractor to resubmit the pay application with revision(s). Pay applications must be submitted with a total amount not to exceed the Purchase Order (PO) balance. A contract modification from the Contracting Officer (CO) is required for payment application submissions exceeding the PO balance. Additional work outside of the contract and contractual supplement documents (provided drawings, as-builts, details, existing product information, etc) require authorization and written execution from the CO. Any additional work (quantified via labor, material or equipment) performed/provided by the contractor without guidance from the VA or direction from the CO shall not be included in payment applications. The contractor is committed to working at their own expense and risk under this condition. Supplemental contractual and scope of work include existing as-builts, details and compliance for VA guidelines, federal & state guidelines, applicable codes, etc. VA can provide the contractor with additional available drawings and other documentation. These are considered items pertaining to the original contract s scope of work Standard Inclusions & General Compliance Contractor is responsible for cleaning the work area of trash regardless of if it is their trash or not. This includes areas that other entities may have access to like the attic and mechanical spaces. Contractor is responsible for stewardship of work area and compliance with VA medical facility guidelines. Contractor will adhere to VA-granted permitting requirements and industry standard safety practices including but not limited to: Infection Control Risk Assessment (ICRA) Pre-Construction Risk Assessment (PCRA) Hot or burn work Confined space entry work (if applicable) Lock out tag out (LOTO) procedures PPE Parking at the Loch Raven campus is limited and contractors are subject to facility guidelines for locations of contractor vehicles. Guidance for contractor parking is enforced by the COR, Facility Maintenance Supervisor, Campus Manager, and Deputy Medical Director. Parking outside the campus boundary is not in the VA s jurisdiction The contractor shall coordinate with the facility prior to work that impacts patient care such as shutting down A/C, heating, power or other utilities. Utility and HVAC shutdowns require at least a 14-day written request to the facility per the VA s internal Standard Operating Procedure. Period of performance is 90 calendar days. | - | Pre-Solicitation | 12/14/2026 |
Amendment 4: The purpose of this amendment is to issue a corrected version of Attachment J-2, Price Proposal Template, and document the resolution of formula and referencing errors identified by offerors following the release of Amendment 0003. Amendment 3: The purpose of this amendment is to: 1) Revise Sections L and M of the RFP. 2) Revise a sub-bullet in Amendment 2 to clarify the deadline for scheduling oral presentations. 3) Provide Government responses to questions regarding the RFP (attached separately). 4) Provide a revised Attachment J-1: Performance Work Statement (PWS) (attached separately). The list of changes to Attachment J-1 PWS is documented in the amendment. 5) Provide a revised Attachment J-2: Price Proposal Template (attached separately). 6) Provide a revised Attachment J-9: Managed Personal Property and Capital Equipment List (attached separately). 7) Provide a revised Attachment J-10: Past Performance Questionnaire (attached separately). Amendment 2: The purpose of this amendment is to update the Oral Presentation schedule, time slots, and slot selection process, extend the deadline for Technical Library access requests, and extend the proposal submission due date. Amendment 1: The purpose of this amendment is to formally transition the previously posted draft Combined Synopsis/Solicitation into an approved, final, and binding solicitation, remove the draft RFP disclaimer, update submission instructions for Attachment J-10, reiterate key schedule milestones, and confirm that all published deadlines remain unchanged. This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation number 1332KP26R0041 is issued as a Request for Proposal (RFP) for Fairbanks Command and Data Acquisition Station (FCDAS) for Operations and Maintenance Services. This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. The following information is incorporated in the attached RFP: A list of line-item number(s) and items, quantities, and units of measure (including options) Description of requirements for the items to be acquired Date(s) and place(s) of delivery and acceptance and f.o.b. point (see part 47). A list of solicitation provisions that apply to the acquisition (see 12.205(a)). A list of contract clauses that apply to the acquisition (see 12.205(b)). The date, time, and place for receipt of offer and point of contact. Other additional information required by 5.101(c). Please refer to Section L.11 Technical Library Access Instructions of the Attached RFP for technical data required to respond will not be furnished as part of the solicitation All responsible sources may submit a quotation, bid, or proposal, as appropriate, which will be considered by the agency. Offerors must meet hold an active Facility Clearance with Defense Counterintelligence and Security Agency (DCSA) in order to be eligible for award. | - | Combined Synopsis | 11/19/2026 |
JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION (OTFAOC) for Building Operations Support (BOS) Services for the Defense Information Systems Agency (DISA) Headquarters (HQ) facilities located at Ft Meade, Maryland. | - | Sole Source / J&A | Open |
Additional Details
Solicitation Number
W56ZTN23R0017
Archive Date
Nov 18, 2023
Office Address
ABERDEEN PROVING GROU, MD, 21005-3013