Notice ID: 235ef56a6661af33a7455b5be449fd9aSolicitation
A--Engineering and Manufacturing Development (EMD) Phase in Support of the Common Infrared Countermeasure (CIRCM) Program
Archived on December 17, 2014. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 6:00 AM UTC+01:00
- Posted
- November 7, 2014
- Notice type
- Solicitation
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W6QK ACC-RSA
- Place of performance
- Department of the Army, Project Manager, Aircraft Survivability Equipment (PM ASE) 6726 Odyssey Drive Huntsville AL 35806 US
- PSC
- A: RESEARCH AND DEVELOPMENT
- Last updated
- Dec 5, 2025
Identifiers
- Solicitation number
- W58RGZ14R0001
- Notice ID
- 235ef56a6661af33a7455b5be449fd9a
Description
Correction - This action was originally publicized on 04 Nov 2013 and amended on 23 Dec 2013 in Fed Biz Ops. The US Army released the DRAFT Request for Proposal (RFP) for the Common Infrared Countermeasure (CIRCM) Engineering and Manufacturing Development (EMD) effort on 06 Feb2014 and Amendment 0001 on 19 Jun 2014 via Army Single Face of Industry (ASFI). The purpose of this modification is to change the CIRCM EMD contract type, change period of performance including Contract Options 1-14, change the delivery schedule for the CIRCM A-Kits and B-Kits, and change the POC for Security Classification Guidance. All other information publicized in the original synopsis is unchanged. The CIRCM EMD effort was originally synopsized as a hybrid Firm Fixed Price/ Cost-Plus Fixed Fee (with Technical Performance Incentives) contract. The Government intends to release a Final RFP for the CIRCM EMD effort to award a hybrid Cost Plus Fixed Fee (with Technical Performance Incentives)/ Fixed Price Incentive (Firm Target)/ Firm Fixed Price contract. If some or all of the Contract Options 1-14 are exercised, the period of performance may be extended to a total of eighty (80) months. During the EMD phase the contractor must deliver eight (8) CIRCM A-Kits and twenty-one (21) CIRCM B-Kits. The first five (5) CIRCM A-Kits must be delivered no later than seven (7) months after contract award and the last three (3) must be delivered no later than seventeen (17) months after contract award. The first seven (7) CIRCM B-Kits must be delivered no later than six (6) months after contract award; the following five (5) must be delivered no later than seven (7) months after contract award; and the last nine (9) CIRCM B-Kits must be delivered no later than fourteen (14) months after contract award. Security Classification Guidance should be directed to PM ASE, Mr. Crayton Sterns at (256) 842-7850, crayton.l.sterns.civ@mail.mil. Contracting POCs are: Ms. Eddie Whitfield (256) 955-6299, eddie.m.whitfield.civ@mail.mil Ms. Heather Stiles (256) 842-8084, heather.t.stiles.civ@mail.mil Technical POCs are: Mr. Jason Matheney at (256) 842-4251, jason.l.matheney.civ@mail.mil Mr. Clint Spratley at (256) 842-3344, clinton.e.spratley.civ@mail.mil
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
heather.stiles2, 2568428084 ACC-RSA - (Aviation)
Documents
No documents available.
Lifecycle
Solicitation:
W58RGZ14R0001- Market Research
- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 3×Market ResearchAug 22, 2013
A--Common Infrared Countermeasure (CIRCM), Engineering and Manufacturing Development (EMD)
- 7×Pre-SolicitationNov 4, 2013
A--Engineering and Manufacturing Development (EMD) Phase in Support of the Common Infrared Countermeasure (CIRCM) Program
- SolicitationCurrentNov 7, 2014
A--Engineering and Manufacturing Development (EMD) Phase in Support of the Common Infrared Countermeasure (CIRCM) Program
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W58RGZ14R0001
Archive Date
Dec 17, 2014