Notice ID: 65b49201082848b5a628b0e84c14844dCombined Synopsis/Solicitation
Decontamination Vehicle
Archived on January 15, 2020. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 11:59 PM UTC−05:00
- Posted
- November 20, 2019
- Notice type
- Combined Synopsis/Solicitation
- NAICS
- 336211: Motor Vehicle Body Manufacturing
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W3ZL OFC PM SANG MOD PROG
- Place of performance
- Brandon Hart Site Manager, VATB Northrop Grumman Technology Services 795 Cromwell Park Drive, Suites C-G, Glen Burnie, MD 21061 USA Brandon.hart@ngc.com, Glen Burnie, MD, 21061
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- W90BRJ20R0003
- Notice ID
- 65b49201082848b5a628b0e84c14844d
Description
The US Army, Contracting Division, Office of the Program Saudi Arabian National Guard (OPM-SANG), Location: Saudi Arabia is issuing this combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. This solicitation, W90BRJ-20-R-0003, is being issued as a Request for Proposal (RFP) for five (5) Decontamination Vehicles. The North American Industry Classification System (NAICS) code for this RFP is section 336211 - Motor Vehicle Body Manufacturing. This procurement is being solicited under the Federal Acquisition Regulations FAR Part 12, Commercial Items and FAR Part 13 Simplified Acquisition Procedures. This requirement will be conducted as full and open and will be evaluated using a Lowest Price Technically Acceptable selection method. The solicitation, effective 7 November 2019, and its attachments are now available for downloading. The proposal due date is 7 December 2019. Any questions relating to this RFP must be submitted IAW RFP W90BRJ-20-R-0003, Addendum 52.212-1 Instructions to Offers. It is our intent to issue a Contract as a result of this solicitation. Questions and Clarifications: Any questions, comments or clarifications concerning any aspect of the solicitation shall be submitted in writing via e-mail to jimmy.v.nguyen2.civ@mail.mil not later than 19 November 2019. Questions or clarifications submitted shall identify the solicitation number, topic, and reference the applicable section of the solicitation, e.g., page number, section number, paragraph. Proposal must be emailed to Jimmy Nguyen (jimmy.v.nguyen2.civ@mail.mil), and Mathew Holtschlag (mathew.d.holtschlag.civ@mail.mil) no later than 7 December 2019 @12:00AM Local Riyadh, Saudi Arabia time.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W90BRJ20R0003- Combined Synopsis
- 2×Combined SynopsisCurrentNov 7, 2019
Decontamination Vehicle
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
See attached solicitation and other documents to purchase 27 NTV. This is LCS funded. | - | Combined Synopsis | 12/19/2025 |
The Department of War (DoW), Portfolio Management Executive for Chemical, Biological, Radiological and Nuclear Defense (PME CBRND), Joint Project Manager for CBRN Special Operations Forces (JPM CBRN SOF) is seeking information, design concepts, and mature technology capabilities for a Tactical Aircraft Interior Decontamination Dispersal System. The goal of this initiative is to identify or evaluate a mature, rapidly deployable, and highly reliable hardware applicator system capable of delivering fine-aerosol, dry-fog, or gaseous decontaminants uniformly throughout military aircraft interiors without damaging sensitive electronics. Key Technical Parameters & Scope: Dispersal Mechanics: Must disperse a fine aerosol/dry fog with a Volume Median Diameter (VMD) of less than 10 microns (Threshold) or a gas-phase molecular dispersion less than 0.001 microns (Objective) to maximize surface coverage without wetting, pooling, or dripping. Tactical Mobility & Footprint: Must fit securely within a Polaris MRZR cargo bed with a stowed envelope not exceeding 42" H x 18" D x 18" W (Threshold), with a target envelope under 30" H x 14" D x 16" W (Objective) to allow upright walk-through clearance in CH-47 and CV-22 cabins. System Weight: Empty chassis weight must be ≤ 150 lbs (Threshold) for a 4-man lift, with a target empty weight of ≤ 100 lbs (Objective) for a 2-man lift. Fully loaded weight with maximum consumables must not exceed 500 lbs. Power Flexibility: Operable from standard single-phase 110-120 VAC (50/60 Hz), commercial/tactical generators ≤ 6 kW, or vehicle auxiliary 28 VDC (Threshold), with a target capability to interface directly with utility and flight-line power IAW MIL-STD-704 (Objective). Employment Versatility: Must support two primary delivery modes: Internal cabin placement on medium/heavy aircraft (CH-47, CV-22, C-130) and external ducting/pumping into constrained cockpits (AH/MH-6 Little Bird). Material Compatibility: All wetted paths, seals, pumps, and nozzles must demonstrate broad chemical compatibility with existing and emerging USG-standard decontaminants, including aqueous hydrogen peroxide ($H_2O_2$), modified amine/ammonia solutions, Dahlgren Decon, and JGPD. System Modularity: Complete operational system must consist of 5 or fewer major items (Threshold), with a target of a single, all-in-one consolidated chassis (Objective) containing integrated internal stowage for all cords, hoses, and nozzles. Technology Maturity: The core dispersal technology must be at a demonstrated Technology Readiness Level (TRL) 6 or higher in a relevant operating environment to support near-term military evaluation and procurement. | - | Market Research | 11/24/2026 |
As of today, Thursday, 11 November 2026, this Call for Solutions is Amended under No. 0002 to incorporate the questsion and comments submitted to APG and the government's responses. Additionally attached is a red-lined document showing all changes to the Call for Solutions as well as a clean version of the CfS incorporating all changes. No extension to the due date for solution submissions within this CfS are offered at this time. Capability Program Executive Command and Control Information Network (CPE C2IN) Commercial Solution Opening (CSO) Call for Solutions (CfS) for Product Manager Wideband Enterprise Satellite Systems (PdM WESS) Commercial Digital Intermediate Frequency Subsystem (DIFS) under the Army Open Solicitation (AOS) Commercial Solutions Opening (CSO) Project Office/Customer Product Manager Wideband Enterprise Satellite Systems (PdM WESS) Contracting Activity Army Contracting Command – Aberdeen Proving Ground (ACC-APG) CSO Number Army Open Solicitation (AOS) - W9128Z-25-S-A002 Call for Solution Title Commercial Digital Intermediate Frequency Subsystem (DIFS) under the Army Open Solicitation (AOS) Commercial Solutions Opening (CSO) Contracting Points of Contact Contracting Officer: Licinda Peters Email: licinda.m.peters.civ@army.mil Contract Specialist: Keith Magaw Email: keith.a.magaw.civ@army.mil Questions Due Date/Time 05 November 2026 at noon Eastern Standard Time (EST) Solution Brief Due Date/Time 10 December 2026 at noon Eastern Standard Time (EST) Submit Solution Brief Via Sam.gov and AOS Controlled by U.S. Army Controlled by: PdM WESS CUI Category: Operations Security (OPSEC) Limited Dissemination Control: FEDCON POC: licinda.m.peters.civ@army.mil SECTION 1 - INTRODUCTION BACKGROUND Product Manager Wideband Enterprise Satellite Systems (PdM WESS) is seeking solutions for a Commercial-Off-The-Shelf (COTS) Digital Intermediate Frequency (IF) system to satisfy the requirements for Increment 1 of this modernization effort. The current legacy analog infrastructure limits scalability, resilience, and interoperability. Under this Call for Solutions, the selected vendor will deliver, integrate, install, and acceptance-test a flexible, open-standard, modular Digital IF solution across up to twenty (20) worldwide satellite communications (SATCOM) teleport sites. Increment 1 will establish a fully operational baseline designed to support subsequent capability upgrades and integrations in future fiscal years. SECTION 2 – REQUIREMENT DESCRIPTION PROBLEM STATEMENT Area of Interest: Modular Digital Intermediate Frequency Solutions for Next-Generation SATCOM Teleports Background & Operational Context Current Department of War (DoW) satellite communications (SATCOM) ground infrastructure relies heavily on legacy L-Band Intermediate Frequency (IF) distribution systems. These analog-hardware-bound architectures limit flexibility, inhibit rapid tech insertion, and create single points of failure across global teleport infrastructures. To counter emerging near-peer threats in dynamic operational environments, the warfighter requires highly resilient, agile, and rapidly scalable SATCOM. The Problem The legacy L-Band architecture fails to offer the ability to dynamically route or transport Radio Frequency (RF) signals over DoW Internet Protocol (IP) networks. This lack of flexibility inhibits the resilience of geostationary earth orbit (GEO) SATCOM operations. To transition to a modern, flexible, software-defined ground segment, the DoW requires an open-standard Digital IF architecture. However, before committing to a full-scale global deployment, the DoW must validate the operation, interoperability, security, and performance of these modular commercial solutions in a rigorous representative environment. Technical Objective & Scope The DoW seeks a commercial solution for an Increment 1 Digital IF capability set built on a flexible, open standard (e.g., Digital Intermediate Frequency Interoperability compliant), modular architecture. The selected solution will undergo standard site acceptance testing and operational verification to confirm compliance with contract performance requirements and site compatibility. Upon successful acceptance, this operational configuration will serve as the standardized baseline for deployment and installation across up to twenty (20) worldwide SATCOM teleport sites. Mission Impact Successful validation and deployment of this flexible open-standard Digital IF architecture will directly enhance warfighter lethality and survivability by delivering a highly resilient, agile, and survivable GEO-SATCOM capability which rapidly adapts to contested/congested environments. SCOPE AND TECHNICAL OBJECTIVES The scope of this effort is to acquire, integrate, test, and field a commercially available or commercial-derivative Digital IF suite, and to operationalize it within existing DoW Teleports. The subsystem shall demonstrate the core capability to digitize analog L-band satellite signals, transport them over a high-speed digital network, and convert them back to analog signals, while handling native digital IF traffic from modems. The subsystem shall leverage mature commercial solutions with an emphasis on automation, reliability, and adherence to open standards, for example, the IEEE-ISTO Std 4900-2021 (DIFI) standard. The offeror shall propose a commercial solution that achieves the following high-level technical objectives, aligned with the core characteristics of the DoW modernization framework: Objective 1: Interoperable Digital IF Conversion (Modular & Open): The DIFS shall convert legacy analog L-band aggregate signals (950 MHz - 2.050 GHz) into standards-compliant Digital IF packet streams and vice versa. This includes both transmit (analog-to-digital) and receive (digital-to-analog) paths, conforming to the DIFI standard to prevent vendor lock-in. Objective 2: Advanced Digital Signal Processing (Adaptable): The commercial subsystem shall combine multiple, disparate Digital IF streams into a single aggregate (combined) stream for uplink and channelize a single aggregate (combined) downlink stream into multiple, individual Digital IF streams for processing. Objective 3: High-Performance Digital Transport (Scalable): The subsystem shall utilize a non-blocking, high-speed digital switch fabric to route Digital IF streams between all subsystem components and external interfaces (e.g., Digital Modems, Global Agile Integrated Transport (GAIT) connections, Wide Area Network (WAN) transport etc. The fabric shall support standard network scaling, redundancy, and high-throughput operations (up to 100 Gigabit Ethernet). The switch fabric shall provide a means for rapid reconfiguration of packet forwarding by the Automated Management and Control Function without the use of Layer 3 routing protocols. The switch fabric shall use deterministic multicast routing based on the incoming port without requiring strict multicast tables. Objective 4: Automated Management and Control (Empowered): The subsystem shall feature a software-based management suite. This software shall automate the establishment, termination, and monitoring of communication paths based on satellite access parameters, manage automatic protection switching for redundant components, and support automated rerouting of critical traffic to alternate facilities. Objective 5: Integrated Test and Diagnostics: The DIFS shall incorporate built-in test capabilities to generate, capture, and analyze Digital IF streams to allow for rapid troubleshooting, performance verification (e.g., Error Vector Magnitude (EVM) & spectral purity), and subsystem health monitoring with minimal operational burden and with on-site test equipment. Objective 6: Resilient and Maintainable Design (Resilient): The commercial solution shall be designed for high availability Ai ≥ 0.9998) a long service life (15 years), and rapid maintainability (MTTR ≤ 30 minutes), using standard line-replaceable items (LRIs). Objective 7: Secure and Compliant Architecture (Secure): The subsystem design shall be capable of achieving a Risk Management Framework (RMF) authorization for a security categorization of (Confidentiality, Moderate), (Integrity, Moderate), (Availability, Moderate). Objective 8: Achieve Military Compliance and Certification Readiness: The delivered commercial units and data packages shall be verified to meet the requirements of a strategic military environment. The subsystem performance shall adhere to applicable military standards, including SATCOM interoperability (MIL-STD-188-164C), electromagnetic interference (MIL-STD-461G), and environmental engineering (MIL-STD-810H). All testing, data, and documentation produced shall support Wideband Global SATCOM (WGS) terminal certification. Objective 9: Global Integration and Installation Support (Fieldable): The commercial solution provider shall provide the engineering services, site-specific technical expertise, and field support necessary to install, integrate, and configure the DIFS baseline across up to twenty (20) or more globally dispersed DoW Teleports, ensuring seamless interoperability with host facility infrastructure and legacy analog/digital interfaces. The Government will consider commercial solution approaches and vendors that fall along a spectrum of technological maturity, from capabilities that may require some further development to those that are fully commercialized and currently fielded. Deliverables The primary deliverable is a Full-Scale Engineering Development (FSED) DIFS (First Article) that successfully meets the objectives in Section 3.0, followed by optional production units. Associated deliverables include: Technical Data Package (TDP): A comprehensive TDP including interface specifications, commercial subsystem design documents, and standard test procedures. Electronic Technical Manual (ETM): A manual sufficient for trained technicians to operate, maintain, and troubleshoot the subsystem. New Equipment Training (NET): Training materials and courseware required to train operators and maintainers on the subsystem. Test Reports: First Article Testing (FAT) reports suitable for use as evidence for WGS certification. Logistics Demonstration: A verification demonstration of maintainability requirements (e.g., MTTR) performed by the offeror using the provided ETM, tools, and recommended spare parts. Integration Support: Technical support for system integration and government-led field verification. Risk Management Framework: Artifacts suitable for verification that the security architecture and included security controls are adequate for the security categorization. Programmatic Objectives & Commercial Acquisition Strategy This acquisition is conducted under the Army Open Solutions (AOS) to identify and procure mature, commercially available technologies using Other Procurement, Army (OPA) funds. The Government's objective is to verify a c, followed by the immediate execution of priced contract options for the procurement, installation, and sustainment of production-ready subsystems at up to twenty (20) or more DoW Teleports and strategic gateway sites worldwide. Program Schedule and Milestones The offeror shall propose a streamlined schedule based on commercial product availability and rapid verification milestones: Commercial Solution Technical Demonstration Physical Configuration Audit (PCA) / Baseline Review First Article Delivery First Article Testing (FAT) & Verification Logistics & Performance Demonstration Site Acceptance Testing (SAT) and Teleport Integration SECTION 3 – SUBMISSION AND SELECTION Selection of awardee is planned to be conducted using a three (3) step approach: Step 1 – Request for Solution Briefs, Step 2 – Pitch Session and/or Vendor Technical Demonstration (PS/VTD) and Step 3 – Proposal Submission. A multi-disciplined working group of technical experts will evaluate the solution Briefs on their own technical merit and not against other solutions. Solution Briefs, and Pitches and/or Demos will be evaluated based on adherence to the following submission and evaluation criteria. STEP: 1 – REQUEST FOR SOLUTION BRIEFS Parties with innovative solutions interested in being considered for this Digital IF solution shall submit a Solution Brief for review, prior to submission of a formal proposal. Solution Briefs that do not meet the requirements in this Call will not be considered. At the Government’s discretion, fully mature solutions, partial solutions, or solutions that are not commercially ready may either be awarded an Other Transaction (OT) to further mature the solution or retained in a library for three (3) months to be considered for contract or OT award at a later time. Not all fully matured solutions will be awarded a contract, nor will all partially mature or solutions that are not commercially available be given an OT award. The commercial solutions described in the solution Brief must clearly articulate relevancy to the technical objectives described in this Call, with a specific focus on delivering commercial capabilities to achieve objectives. No information submitted by an interested party in response to this Call will be returned. Submission of Solution Briefs shall adhere to the following general guidelines: Minimum of five (5) pages with a maximum of ten (10) pages or slides, not including the Coversheet, title page, or table of contents Times New Roman - not smaller than 12-point font type, although smaller font types may be used for figures, tables, and charts All Solution Briefs must be written in English Multiple Solution Briefs may be submitted for multiple solutions from the same Vendor A vendor’s standardized digital capability profile document will not be evaluated; Solution Briefs /White Papers must be submitted The Solution Brief shall address the following requirements/information: Capability Description: A detailed description of the product(s) or service(s) offered. Explain how the solution addresses the Objectives. Include technical specifications, performance data, and evidence of the solution's maturity or Technology Readiness Level (TRL). Company Experience and Past Performance: Provide a summary of the company’s experience in developing, producing, and sustaining DIFS-related capabilities for Department of Defense or other relevant customers. Production and Sustainment Approach: Describe the company's ability to scale production to meet potential demand, a proposed timeline required to scale to production, the number of units currently available for shipment, the current production rate, the number of units available for delivery per month if scaled, and its approach to providing training, field service support, long-term sustainment, and supply chain risk management. Pricing Structure: Provide a notional pricing structure for the proposed capabilities. This should include pricing for single units and an explanation of available discounts for range-based quantity purchases (e.g., 1-10 units, 11-50 units, 51+ units). Pricing for yearly sustainment and service agreements should also be addressed. Global Integration and Installation Approach: Describe the company’s experience and approach for managing, deploying, and physically installing the proposed subsystem across up to 20 globally dispersed teleport sites. This must include plans for site surveys, site-specific engineering, local integration support, and coordination of on-site acceptance testing. OTHER RELEVANT INFORMATION Use of a diagram(s) or figure(s) to depict the essence of the proposed solution is strongly encouraged. A Solution Brief submitted in response to a government solicitation (like a Call for Solutions or Commercial Solutions Opening) acts as a high-level pitch, but it is also a pre-contractual framework. A solution is meaningless without a timeline. Telling the government what you can build must be accompanied by how long it will take. If the solicitation specifies a 1.5-month maximum, including your proposed Period of Performance (PoP) proves to the evaluators that your technical approach is realistic and can actually be completed within strict constraints. Time directly dictates cost. A 45-day PoP implies a highly concentrated burst of work. Including the PoP explains your pricing; a $100,000 solution, for example, delivered over 1.5 months implies a very different team structure and urgency than the same cost spread over a year. For Solution Briefs, Pitches and/or Demos, and Proposals containing data that is not to be disclosed to the public for any purpose or used by the Government except for evaluation purposes, the vendor shall label any information they want protected as confidential. SOLUTION BRIEF DUE DATE/TIME Questions are due 05 November 2026 at noon Eastern Standard Time (EST) via email to Mr. Eric Belle, Project Management Specialist at eric.k.belle.civ@army.mil, Mr. Keith Magaw, Contract Specialist at keith.a.magaw.civ@army.mil, and Licinda M Peters, Contracting Officer at licinda.m.peters.civ@army.mil. Respondents who submit questions in response to the CfS, are requested to use “ACC-APG Digital IF CfS_ Questions Template_Attch 0001.” The completed question template should be attached to the email as an Excel document. This Call will remain open for no more than forty-five (45) days from the original posting. The due date for solution-Briefs submitted in response to this Call is no later than 10 December 2026. Solution Briefs received after the due date and time will not be considered for selection. SUBMISSION METHOD (UNCLASSFIED ONLY) In addition to soliciting SAM.Gov, the Digital IF effort utilizes AOS for the posting of Calls. Please submit your solution responses for the above requested information in PDF or Microsoft Word format no later than (NLT) Noon EST on 10 December 2026 to Mr. Eric Belle, Project Management Specialist at eric.k.belle.civ@army.mil, Mr. Keith Magaw, Contract Specialist at keith.a.magaw.civ@army.mil, and Licinda M Peters, Contracting Officer at licinda.m.peters.civ@army.mil. SOLUTION BRIEF EVALUATION CRITERIA (listed in priority order) Technical Understanding – Does the proposed solution demonstrate that the Vendor understands the Technical Objectives in section 2.2 and the Requirements/Information in section 3.1 of the Call for Solution? Does the Vendor clearly articulate how its technical solution meets the Technical Objectives and Requirements? Does the technical solution meet requirements in this Call? Capability Description & Technical Alignment – Does the proposed solution align with the Objectives? Interoperable Digital IF Conversion (Modular & Open). Does the proposed solution convert legacy analog L-band aggregate signals (950 MHz - 2.050 GHz) into standards-compliant Digital IF packet streams and vice versa? Does it work during both transmit (analog-to-digital) and receive (digital-to-analog)? Does the proposed conform to the DIFI standard? Does the proposed solution prevent vendor lock in? Advanced Digital Signal Processing (Adaptable). Does the proposed solution combine multiple, disparate Digital IF streams into a single aggregate stream for uplink? Does the proposed solution channelize a single aggregate downlink stream into multiple, individual Digital IF streams for processing? High-Performance Digital Transport (Scalable). Does the proposed solution utilize a non-blocking, high-speed digital switch fabric to route Digital IF streams between all subsystem components and external interfaces (e.g., Digital Modems, GAIT connections, WAN Transport etc.)? Does the proposed solution ensure that the DIF backbone switching fabric supports standard network scaling, redundancy, and high-throughput operations (up to 100 Gigabit Ethernet)? Does the proposed solution employ a DIFI backbone switch fabric that provides a means for rapid reconfiguration of packet forwarding by the Automated Management and Control function without the use of Layer 3 routing protocols? Does the proposed solution employ a DIFI backbone switch fabric that uses deterministic multicast routing based on the incoming port without requiring strict multicast tables? Automated Management and Control (Empowered). Does the proposed solution feature a software-based management suite? Does the proposed solution automate the establishment, termination, and monitoring of communication paths based on satellite access parameters? Does the proposed solution manage automatic protection switching for redundant components? Does the proposed solution support automated rerouting of critical traffic to alternate facilities? Integrated Test and Diagnostics. Does the proposed solution incorporate built-in test capabilities to generate, capture, and analyze Digital IF streams? Does the proposed solution allow for rapid troubleshooting, performance verification (e.g., EVM, spectral purity), and subsystem health monitoring without extensive external test equipment? Resilient and Maintainable Design (Resilient). Is the proposed solution designed for high availability Ai ≥ 0.9998)? Is it designed for a long service life (15 years)? Does it enable rapid maintainability (MTTR ≤ 30 minutes), using standard LRIs? Secure and Compliant Architecture (Secure): Is the proposed solution capable of achieving and maintaining the latest Risk Management Framework (RMF) authorization for a security categorization of (Confidentiality, Moderate), (Integrity, Moderate), (Availability, Moderate)? Will other proprietary knowledge, configuration or licenses inhibit the government from selecting a different contractor for future support if desired for the whole life cycle of the system? Are there foreseeable end-of-life/support/availability dates for any of the hardware, software or licenses within the system? Achieve Military Compliance and Certification Readiness. Does the proposed solution enable commercial units and data packages to be verified to meet the requirements of a strategic military environment? Does the subsystem performance adhere to applicable military standards, including SATCOM interoperability (MIL-STD-188-164C), electromagnetic interference (MIL-STD-461G), and environmental engineering (MIL-STD-810H)? Does the testing, data, and documentation produced support Wideband Global SATCOM (WGS) terminal certification? Global Integration and Installation. Does the proposed solution demonstrate a viable, low-risk approach to physical installation and system integration at up to 20 globally dispersed Teleport sites? Does the vendor possess the logistical, engineering, and field support capabilities required to achieve site acceptance and support operational readiness? Potential for Future Success – Does the proposed solution demonstrate that the Vendor has potential for success and a roadmap for sustaining and producing systems? Technical Readiness and Performance Potential: Does the proposed solution demonstrate the potential to meet specified performance metrics and address the Army needs? Is the underlying technology sound, scalable, and defensible? Are there plans for rigorous testing and validation? Product Viability and Market Fit: Does the proposed solution demonstrate a clear understanding of the Army operational requirements, a compelling value proposition, and evidence of military utility? Operational Readiness: Does the proposed solution outline a clear and realistic roadmap for achieving operational readiness, including any planned or completed testing, pilot programs, previous fieldings, and previous or current work with other Government Entities with its proposed technology? Integration Potential and Adaptability: Does the proposed solution demonstrate the potential to integrate smoothly with existing systems? Is the architecture flexible and adaptable to future needs? Team Expertise and Capability: Does the team possess the necessary skills and experience to execute the business plan and achieve projected milestones? Are roles clearly defined, and responsibilities assigned appropriately? Production Capacity: Does the solution address the availability of current units and a plan to scale production to meet potential Government demand. Sustainment and Training: Does the solution have a viable plan and long-term sustainment strategy, including field service support (FSRs) and training pipelines. Impact of Data Rights Asserted – Do any proposed data rights assertions limit or restrict the viability of the solution? Alternatively, does the Vendor mitigate performance and continuity risk through other means (e.g. escrow, Modular Open Systems Approach)? Does the Vendor discuss the Government’s Right to Repair? Does the Vendor include/offer warranties? Rough Order of Magnitude (unit pricing) – Is the ROM price provided realistic for the work to be performed and reflect a clear understanding of the requirements? Does the proposed solution address the risks associated with the cost of scaled procurement (quantity discounts) and long-term sustainment/licensing costs. Notice to offerors: The use of Artificial Intelligence (AI) tools may be used during evaluations. Any AI tools utilized by the Government will be employed in a manner consistent with applicable regulations that govern the protection of proprietary and source selection sensitive information. No proposal data will be transmitted to or processed by external, non-Government systems without appropriate safeguards and authorizations in place. Based on the results of the Step 1 evaluation, a Vendor will either receive a non-selection letter from the Contracting Officer providing a short summary of why the solution-brief was not selected, a notice of inclusion into the library, or an invitation to continue to the next step. Since CPE C2IN only requests minimal information from a Vendor at this initial stage (and not a full proposal), we generally will not provide significant feedback beyond the letter. STEP 2: PITCH SESSION/VENDOR TECHNICAL DEMONSTRATION (PS/VTD) The pitch session will allow selected companies from Step 1 to provide detailed information on their proposed solution. In-person pitch sessions will be held in an unclassified setting at Fort Belvoir, Virginia. If selected for an in-person pitch session (limited to 90 minutes with an additional 30-minute question and answer segment), each vendor will also conduct a VTD on the same day as the pitch session (limited to 1 hour to showcase subsystem capabilities. Vendors selected for a VTD will be given detailed testing information and requirements closer to the date of testing. The purpose of the VTD is to validate the information provided during the in-person vendor pitch session and give Army stakeholders an opportunity to witness the vendor subsystems’ capability performance within a controlled laboratory environment. The Government may bypass Step 2 and move a Vendor(s) into Step 3, based on the information provided in the Step 1 Brief. 3.4 STEP 3: PROPOSAL The Government will engage in collaborative discussions regarding the statement of work (SOW) with a Vendor who is invited to Step 3. During this process, the Government team and the Vendor team can discuss requirements, exchange ideas, share drafts of the proposal and SOW, and collaborate until a mutually beneficial SOW is agreed upon. Upon completion of discussions/collaboration, the Government may issue a Request for Proposal (“RFP”) to the Vendor selected. The RFP will have specific guidelines. Chiefly, Vendors must submit a technical volume, an updated SOW (if required), and a detailed price breakdown as it relates to the SOW. USE OF NON-GOVERNMENT ADVISORS Vendors are advised that data included in solution-briefs and technical/cost proposals submitted to the Government in response to this CSO Call may be released to support contractors or Federally Funded Research and Development Center (FFRDC) personnel for review and analysis. Any such personnel will serve in an advisory capacity only to the Government evaluators and will provide the CPE C2IN with independent review and analysis of technical matters and on accomplishment of objectives, tasks, and deliverables as proposed or required. All Government and non-government participants in the review process are required to execute government nondisclosure agreements and personal/organizational statements of financial interest, as appropriate. By submission, Vendors agree that their material may be reviewed by support contractors. SECTION 4 – AWARDS ANTICIPATED TYPE OF AWARDS The Government intends to award one FAR Part 12 commercial contract as a result of this Call for Solutions. The Government may also award an Other Transaction Authority (OTA(s)) as a result of a Vendor(s) submission(s). ANTICIPATED TIMELINE OF AWARD The selection of a Vendor for an award will be based on the relevance of their proposed solutions to meet the Government’s requirements, the maturity of their offerings, and their demonstrated ability to produce and sustain their capabilities. New and updated white papers will be accepted for the entire period the CSO Call is open. The estimated award timeline is first quarter of 2027. | - | Solicitation | 12/10/2026 |
Project Title: Tactical Communication Systems Procurement, Services & Sustainment (TCS-PSS) Reference Number: CSO-ARMY-TCS-PSS-2027 Primary NAICS: 334220 – Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing 1. Opportunity Overview The Department of the Army, representing the Capability Program Executive Command and Control Information Network (CPE C2IN), the Project Manager Command and Control Transport (PM C2T), and the Product Manager Tactical Communication Systems (PdM TCS), has issued a Call for Solutions (CfS) under Defense Federal Acquisition Regulation Supplement (DFARS) Part 212.70 to establish a 10-year enterprise acquisition framework for innovative tactical communication capabilities. This initiative seeks to secure a mix of single-award Indefinite Delivery, Indefinite Quantity (IDIQ) contracts and/or Other Transactions (OTs) to streamline the procurement, testing, fielding, and lifecycle sustainment of both legacy systems and emerging transport hardware and software. Focused on supporting Next Generation Command and Control (NGC2), the effort aims to deliver highly secure—National Security Agency (NSA) High Assurance certified or Sensitive but Unclassified - Encrypted (SBU-E) qualified—resilient, and interoperable communication systems. To counter future cryptographic threats, the framework is seeking capable vendors to provide a plan for incorporating Post-Quantum Cryptography (PQC) compliant algorithms and achieving National Institute of Standards and Technology (NIST) validation by 31 December 2030, ensuring robust data protection and mission command resilience in contested joint and coalition environments. 2. Critical Milestones & How to Respond Questions & Comments Due: 04 November 2026 at 16:00 EST White Papers Due: 14 December 2026 at 17:00 EST 3. Points of Contact Contracting Officer: Jennifer Anderson, jennifer.d.anderson57.civ@army.mil Contract Specialist: Aaliyah Coles, aaliyah.m.coles.civ@army.mil Please refer to the attached Call for Solutions (CSO-ARMY-TCS-PSS-2027) document for full submission instructions, evaluation criteria, and detailed technical characteristics. 12 November 2026: Amendment 4 – 1. Vendor Questions and Government Responses 2: The Government’s responses to the final round of vendor questions are attached to this amendment. In addition to the initial round of questions, vendors are strongly encouraged to review these responses in their entirety to aid in the development of their White Papers. The Question submittal deadline has passed, and no additional questions will be accepted at this time. 2. Call for Solutions Numbering: The Call for Solutions numbering headers have been corrected as some sections were previously misnumbered, please review to ensure consistency between this document and your White Papers. 3. Industry Day Announcement: ACC-APG will host a virtual Industry Day on Monday, 23 November 2026, from 1400 to 1500 EST via Microsoft Teams. During the event, ACC-APG and PdM TCS will provide prospective vendors with a brief overview of the Commercial Solutions Opening (CSO), the Army Open Solicitation (AOS), and the TCS-PSS effort. A Microsoft Teams meeting link will be provided no later than 20 November 2026 ONLY to vendors who have been verified and approved for access to the CUI documents in SAM. Participation shall be limited to a maximum of three (3) representatives per vendor. 4. Clarifications: Sections 1, 6, 7.1 (C. 8.), and 8.1 have been revised for clarity and administrative purposes in response to vendor questions. These revisions do not constitute material changes to the white paper requirements. Attachments: Attachment 1: TCS PSS_CfS Q&A_Round 2 All other terms, conditions, and submission guidelines remain unchanged. 29 October 2026: Amendment 3 – Vendor Questions and Government Responses: The Government’s responses to the initial round of vendor questions are attached to this amendment. Vendors are strongly encouraged to review these responses in their entirety before submitting additional questions, as the responses may address matters relevant to White Paper preparation. As stated in the prior amendment, additional questions must be submitted no later than November 4, 2026, in accordance with the Call for Solutions instructions. White Paper Submission Deadline: The White Paper submission deadline is extended to 14 December 2026. All White Papers must be submitted in accordance with the instructions and submission requirements established in the Call for Solutions. Security Criteria for SBU-E Tactical Radio Devices: An additional controlled document is available to verified vendors. This document includes security criteria for SBU-E tactical radio devices broken out into screening that must be satisfied and differentiating for trade off analysis. Access to this document is limited to vendors whose eligibility and access have been verified through the Government’s established process. Vendors shall handle the document in accordance with all applicable access, safeguarding, and distribution requirements. Attachments Attachment 1: Initial Vendor Questions and Government Responses Attachment 2: Security Criteria for Sensitive But Unclassified-Encrypted (SBU-E) Enclave Tactical Radio Devices — Available to Verified Vendors Only Amendment 2 (26 October 2026) – The submission schedule for the TCS-PSS Call for Solutions has been revised. The deadline for submitting questions is now extended to 04 November 2026, and the submission deadline for White Papers has been extended to 03 December 2026. To reiterate, to request access to Controlled Unclassified Information (CUI) documents, vendors must complete the following steps: SAM.gov Request: Submit an access request directly through the SAM.gov posting. (Note: ONLY SUBMIT ONE DOCUMENT APPROVAL REQUEST THROUGH SAM.GOV PER VENDOR). Email Verification Package: Send an email to jennifer.d.anderson57.civ@army.mil,; aaliyah.m.coles.civ@army.mil; and douglas.g.thier.civ@army.mil containing: Approved DD Form 2345 CAGE Code Joint Certification Program (JCP) Number Signed Non-Disclosure Agreements (NDAs) for all individuals requiring access to CUI document 3. Reminder, all vendor questions regarding this CfS must be submitted via the designated Microsoft Forms link. Important: No vendor emails containing questions regarding the CfS will be answered or responded to. The Government will consolidate and provide formal answers to all submitted questions following the final receipt of questions. All other terms, conditions, and submission guidelines remain unchanged. Amendment 1 (19 October 2026; 1600 EST) - The purpose of this amendment is to establish the mandatory security and verification protocols for vendors requesting access to the CUI and Export-Controlled attachments associated with this Call for Solutions. Certain attachments referenced in this Call for Solutions are marked as Controlled Unclassified Information (CUI) with Limited Dissemination Controls and/or Export Controls. The dissemination of Export-Controlled information is restricted by the Arms Export Control Act or the Export Administration Act of 1979. Export-controlled items shall not be disseminated outside the U.S. Government or to U.S. Government contractors without first verifying the recipient’s eligibility and authority to receive export-controlled information by verifying they have a current, valid DD Form 2345. Interested vendors must provide their CAGE Code, a copy of the DD2345, and their Joint Certification Program (JCP) number to Contracting Officer Jennifer Anderson (jennifer.d.anderson57.civ@army.mil), Contract Specialist Aaliyah Coles (aaliyah.m.coles.civ@army.mil) and Contract Specialist Douglas Thier (douglas.g.thier.civ@army.mil). Once the CAGE Code and JCP data has been verified the Controlled documents will be sent to interested parties. Additionally, vendors will be required to submit a Non-disclosure Agreement (NDA), for all personnel requiring access to these documents. A copy of this NDA can be obtained by emailing the Contracting Officer Jennifer Anderson (jennifer.d.anderson57.civ@army.mil), Contract Specialist Aaliyah Coles (aaliyah.m.coles.civ@army.mil) and Contract Specialist Douglas Thier (douglas.g.thier.civ@army.mil). For more information regarding the JCP approval process and the DD Form 2345 click or copy and paste the link below into a web browser: https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/SpecificDD2345Instructions.aspx | - | Solicitation | 12/14/2026 |
Proposed procurement for NSN 2590013229359 LEG,SEMITRAILER RETRAC: Line 0001 Qty 8 UI EA Deliver To: By: 0130 DAYS ADO This Solicitation may result in an Automated IDC (Indefinite Delivery Contract). The term of the contract/order will be one year or until the aggregate total of orders placed against the contract/order reach 350000.00. The estimated number of orders per year is 1. The Guaranteed Minimum quantity will be 1. Items will be shipped to various CONUS and OCONUS (via consolidation and containerization point) DLA Depots. Approved source is 99411 LG1950-01. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Specifications, plans, or drawings are not available. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically. | - | Combined Synopsis | 11/27/2026 |
Additional Details
Solicitation Number
W90BRJ20R0003
Archive Date
Jan 15, 2020
Office Address
APO, AE, 09803