GovChime
Notice ID: f38cf6d433514ecc8879a766aadb67acSolicitation

Boiler Maintenace Service at Osan, AB

Archived on June 27, 2023. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM UTC+09:00
Posted
May 17, 2023
Notice type
Solicitation
Agency
Department of WarDepartment of the Army

Notice details

Office
0411 AQ HQ CONTRACT AUG
Place of performance
Osan, AFB
Last updated
Dec 4, 2025

Identifiers

Solicitation number
W90VN623R0022
Notice ID
f38cf6d433514ecc8879a766aadb67ac

Description

CLEANING AND MAINTENANCE SERVICES ON BOILERS AND WARM AIR FURNCES, AND INDUSTRIAL WATER TREATMENT ON HEATING AND CHILLED WATER SYSTEMS 1. GENERAL: This is a non-personal services contract perform cleaning and maintenance services on boilers, warm air furnaces and industrial water treatment on hydronic heating and chilled water systems as defined in this Performance Work Statement (PWS) at Osan Air Base (AB). 1.1. Scope: The Contractor shall provide all personnel, management, supervision, system testing equipment, tools, supplies, and transportation to provide cleaning and maintenance services on boilers, warm air furnaces and industrial water treatment on hydronic heating and chilled water systems as defined in this PWS. 1.2. Quality Control: The Contractor shall be responsible for performing inspections and submit the inspection report to COR within five (5) calendar days from completion of inspection to ensure that the services conform to the requirements specified herein. However, the Government reserves the right to perform random inspections and tests, which are deemed to assure that the services conform to the prescribed requirements in this PWS. 1.3. Quality Control Plan (QCP): The contractor shall develop and maintain an effective quality control plan to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractors quality control plan is the means by which he assures himself that his work complies with the requirement of the contract. The Contractor is required to submit a Quality Control Plan within 10 calendar days after the contract award date (CDRL 1). An updated copy of the Contractors plan shall be provided to the Contracting Officer and COR as changes occur. The contractor shall use the format below to measure each line item in the Performance Requirements Summary (PRS) table. For any changes to the original QC plan the contractor shall receive the contracting officers acceptance in writing of any proposed change to his QC system.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W90VN623R0022
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 3×
    SolicitationCurrentMay 7, 2023

    Boiler Maintenace Service at Osan, AB

    Notice f38cf6d433514ecc8879a766aadb67ac on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W90VN623R0022

Archive Date

Jun 27, 2023

Place of Performance Country

KOR

Office Address

APO, AP, 96271-5289