Notice ID: 93a5050d6608423b8465ecd80af69dedSolicitation
CONSTRUCTION OF FORT GREELY COMMUNICATIONS CENTER, FORT GREELY, ALASKA (FTG233)
Archived on June 1, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−09:00
- Posted
- November 9, 2020
- Notice type
- Solicitation
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W2SN ENDIST ALASKA
- Place of performance
- Fort Greely, AK, 99731
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W911KB21R0004
- Notice ID
- 93a5050d6608423b8465ecd80af69ded
Description
This is a Full and Open Request for Proposal (RFP) for a Design-Bid-Build Construction of a Communications Center at Fort Greely, Alaska. The procurement will be conducted using single phase source selection tradeoff process described in FAR 15.101-1. The award will be based on the best overall value to the Government considering the non-price factors described in the RFP and price. The Government will evaluate proposals in accordance with the evaluation rating systems outlined in the selection procedures of the RFP. Any resulting contract will be firm fixed price. The anticipated Notice to Proceed date is 15 March 2021 with a construction completion date no later than 30 September 2022. The Fort Greely Communications Center will provide a new communications capability to provide the Warfighter with a redundant capability at the Missile Defense Integration & Operations Center (MDIOC) utilizing communications which are separate and independent of the existing Readiness and Control Building (RCB). This fully designed facility includes High Altitude Electromagnetic Pulse (HEMP), Electromagnetic Interference (EMI), Nuclear Biological and Chemical Contamination Survivability (NBCCS), ballistic protection and seismic Risk Category V features. This project also includes an extensive amount of site work to include the installation of communications duct banks throughout the Missile Defense Complex (MDC) which interface with the Missile Fields and Readiness and Control Building. There will be several power and communication interfaces with existing mission critical facilities within the MDC. Potential offerors are advised that the Request for Proposal is available for download via the Beta SAM website; however due to the large size of the files for the Plans and Specifications, Offerors are required to provide the name, e-mail address, and phone number of their selected point of contact (POC) to the Contract Specialist, Melissa Lynn via e-mail at: melissa.k.lynn@usace.army.mil, phone number: 907 753-2894 in order to have their name added for access to the Plans and Specifications uploaded to the DOD Safe site. The deadline for submission of POC information to request the Plans, Drawings and Specifications is 07 October 2020 by 2:00PM Alaska Time. Offerors who have responded by the deadline with POC information will be provided the RFP specifications and drawings via the DOD Safe Website starting on the release date of the solicitation. All notifications of changes to this solicitation shall be made through the internet only (Beta SAM). It is the offeror’s responsibility to check for any posted changes to this solicitation. Request to attend the Site Visit must be submitted to the RFP POCs in accordance with Section 00 21 00, paragraph 1.8 in the Amendment 01, posted 06 OCT 2020. VIRTUAL PRE-PROPOSAL MEETING, 14 OCTOBER 2020 at 0800 AKST (SLIDES ATTACHED) JOIN MICROSOFT TEAMS MEETING - https://teams.microsoft.com/l/meetup-join/19:meeting_NjIwZWRmNmEtZjA5NS00OTM3LTk1NDUtOWQ4Mjg2NDE2MWUx@thread.v2/0?context={"Tid":"7a53b4fc-e87d-4c46-9972-0570ac271b27","Oid":"9c9adc41-9889-4d37-b4b0-ffd76d8a7083"} +1 913-278-0791 United States, Kansas City (Toll) Conference ID: 579 582 649# POC - MELISSA LYNN (907)753-2894, melissa.k.lynn@usace.army.mil OR JASON WILSON (719)721-1906, jason.f.wilson@usace.army.mil AMENDMENT #03 - POSTED 20 OCTOBER 2020 AMENDMENT #04 - POSTED 27 OCTOBER 2020 AMENDMENT #05 - POSTED 02 NOVEMBER 2020 AMENDMENT #06 - POSTED 03 NOVEMBER 2020 AMENDMENT #07 - POSTED 05 NOVEMBER 2020 AMENDMENT #08 - POSTED 09 NOVEMBER 2020
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W911KB21R0004- Market Research
- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Market ResearchMar 11, 2020
FORT GREELY COMMUNICATIONS CENTER (FTG233)
- Pre-SolicitationSep 2, 2020
CONSTRUCTION OF FORT GREELY COMMUNICATIONS CENTER, FORT GREELY, ALASKA (FTG233)
- 11×SolicitationCurrentSep 28, 2020
CONSTRUCTION OF FORT GREELY COMMUNICATIONS CENTER, FORT GREELY, ALASKA (FTG233)
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The U.S. Army Corps of Engineers USACE, Alaska District, is seeking to identify a Design-Build Team or Design-Builder for ACC003 Weapons Generation Complex and Northern Flightline, a major project in support of the Fighter Town Recapitalization FTR Program at Joint Base Elmendorf-Richardson JBER, Alaska. The FTR Program is a multiphase initiative to redevelop a significant portion of JBER with modern, resilient, and expanded infrastructure while maintaining mission continuity for active base and airfield operations throughout all phases of construction and facility turnover. Within this broader program, the ACC003 project will encompass construction of the new Weapons Generation Complex and associated Northern Flightline facilities at JBER, Alaska. The scope includes approximately sixteen new facilities, comprising hangars, operations buildings, and munitions storage magazines. A key constraint is the requirement for the new WGC to be operational before the existing facility can be decommissioned, ensuring zero operational downtime for this mission. The project will be constructed on pre-excavated sites with preconstructed utilities delivered under a separate, preceding agreement. | - | Solicitation | 11/24/2026 |
**06 NOV 2026 Update** See the attached file “EAR048_Industry Questions and GOV Response, 06 NOV 2026” for U.S. Government (USG) responses to industry questions. Please continue to submit questions to the Point of Contact (POC) listed below. The USG will post responses on a weekly basis. **End of 06 NOV 2026 Update ** **30 OCT 2026 Update** See the attached file “EAR048_Industry Questions and GOV Response, 30 OCT 2026” for U.S. Government (USG) responses to industry questions. Please continue to submit questions to the Point of Contact (POC) listed below. The USG will post responses on a weekly basis. **End of 30 OCT 2026 Update ** REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE Notice: This is a Request for Information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should a formal solicitation be issued in the future. NAICS Code: 236220 – Commercial and Institutional Building Construction (Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.) Small Business Size Standard: $45 Million PROJECT OVERVIEW The U.S. Army Corps of Engineers (USACE), Alaska District, has a requirement for the site-wide repair and replacement of fire alarm systems at Eareckson Air Station (Shemya Island, Alaska). The project will replace aging and non-compliant fire alarm systems across multiple facilities to meet current UFC 3-600-01, NFPA 72, and life-safety requirements. Existing systems are outdated or non-functional, creating risk to personnel and mission on this remote installation. The Government is now pursuing a wireless (or hybrid wireless) fire alarm architecture that significantly reduces or eliminates the need for extensive buried fiber optic infrastructure, thereby addressing the primary cost driver while achieving full code compliance. Key project components include: • Demolition of existing fire alarm control panels, initiating devices, notification appliances, conduit, and wiring across affected buildings • Installation of a new wireless/hybrid addressable fire alarm system, including wireless devices, gateways/repeaters for campus-wide RF coverage, limited residual hard-wired elements only where essential, and integration with supervisory/monitoring capabilities • RF coverage analysis, specialty detection in hazardous (Class I) locations associated with fuel systems, cybersecurity compliance, multi-shift training, testing, commissioning, and phased turnover • Phased execution by building or geographic area to accommodate remote-island logistics and minimize operational impact Estimated Acquisition Magnitude: Between $27M and $33M Planned Acquisition Strategy: Anticipated to utilize Progressive Design Build via Other Transaction Authority (OTA) The Alaska District is conducting market intelligence to assess industry capability and interest in supporting this effort utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. § 2808a, Facility Construction or Repair: Transactions Other Than Contracts and Grants. This authority is distinct from the Department of Defense prototype OT authorities commonly associated with 10 U.S.C. § 4021 and 4022. This authority is intended for military construction and repair projects that involve testing and experimentation associated with new and emergent construction technologies to achieve potential benefits such as enhanced mission resilience, improved installation support, or cost and schedule reduction. The anticipated delivery method is Progressive Design-Build. Design and Pre-Construction Services - The OT Awardee shall assist the Government collaboratively in advancing the wireless/hybrid fire alarm design, performing RF coverage analysis and site investigations, supporting the UFC waiver process, validating and refining project requirements, and developing progressively more detailed open-book cost and schedule information. Design is expected to advance from approximately 0–15% at award to an agreed interim milestone (target approximately 65%) sufficient for reliable Guaranteed Maximum Price (GMP) development. Final Design and Construction - Upon reaching an agreed-upon level of design, the Awardee will propose a Guaranteed Maximum Price (GMP) or Firm-Fixed-Price for final design and construction. If the price is accepted and required funding/approvals (including UFC waiver status) are in place, the Government will authorize Phase 2 execution via modification. Construction is expected to be authorized in staggered packages by building or geographic area to allow early turnover of priority facilities. If a fair and reasonable price cannot be agreed upon, or if other conditions prevent proceeding, the Government retains an “off-ramp” to complete the project via alternative methods while retaining rights to the design developed during Phase 1. SUBMISSION INSTRUCTIONS: Please submit your responses to the attached Market Research Intelligence Questionnaire no later than 16 November 2026 at 14:00 Alaska Time (AKT) using one of the following methods: Preferred Method: Complete the questionnaire via the Microsoft Forms link: https://forms.osi.apps.mil/r/DgMYxp3wcZ Alternative Method: Email your completed questionnaire to both of the following individuals: MAJ Quentin Sica at Quentin.Sica@usace.army.mil Theresa Afrank at Theresa.M.Afrank@usace.army.mil Any questions regarding this RFI should be directed to MAJ Quentin Sica or Theresa Afrank using the email addresses above. Disclaimer: This RFI is for market intelligence purposes only. The Government reserves the right to use information received for any purpose and does not commit to issuing a solicitation or awarding an agreement as a result of this notice. | - | Special Notice | 11/16/2026 |
REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE Notice: This is a Request for Information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should a formal solicitation be issued in the future. NAICS Codes: EIE483 and EIE484 - 236220 – Commercial and Institutional Building Construction (Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.) Small Business Size Standard: $45 Million The U.S. Army Corps of Engineers (USACE), Alaska District, has requirements for two separate Military Construction (MILCON) projects at Eielson Air Force Base, Alaska: EIE483 – Joint Mobility Center Expansion: Design and construct a new Deployment Processing Facility sited relative to the airfield and supporting facilities to be occupied by 354th Logistics Readiness Squadron personnel. The facility will contain areas for the Personnel Deployment Function, Cargo Deployment Function, and Deployment Control Center, plus building support spaces. The Personnel Deployment Function area will contain a non-sterile holding area for processing passengers, a manifesting office for weighing passengers with their gear, a sterile holding area for passengers who have been manifested and are awaiting mission briefing, and a second sterile holding area for mission briefings. The current schedule identifies design starting in FY27 and construction starting in FY29, with a period of performance from FY27 through FY31. EIE484 – 225-Bed Permanent Party Dormitory: Construct a 3-story permanent party dormitory to house 225 unaccompanied enlisted airmen. Construction will include slab-on-grade and steel frame with concrete masonry unit block veneer and insulated metal panel over metal studs at exterior walls. Supporting facilities include 200 parking spaces, extension of steam, water, and sewer utilities, power distribution, and land scaping to service the new facility. Main facility spaces include 225 dormitory units, activity space, communal kitchens, dorm management office, public restroom, laundry, theater/meeting space, elevator, and mechanical/utility space. The current schedule identifies design starting in FY27 and construction start in FY28, with a period of performance from FY27 through FY31. Estimated Acquisition Magnitudes: EIE483 – Joint Mobility Center Expansion: Approximately $249.2 million. EIE484 – 225-Bed Permanent Party Dormitory: Approximately $305 million. Planned Acquisition Strategy: The Government anticipates utilizing an Other Transaction (OT) Agreement for each project. The final delivery method has not been determined and may be Progressive Design-Build (PDB) or Construction Manager at Risk (CMAR), as informed by market intelligence and Government requirements. The Alaska District is conducting market intelligence to assess industry capability and interest in supporting these efforts utilizing an OT Agreement under the authority of 10 U.S.C. § 2808a. This authority permits the Secretary concerned, subject to applicable statutory requirements, to enter into transactions other than contracts, cooperative agreements, or grants for facility repair and construction projects, including planning, design, engineering, prototyping, piloting, and execution. This authority is distinct from the Department of Defense prototype OT authorities commonly associated with 10 U.S.C. § 4021 and 4022. The Government will use market-intelligence responses to inform the appropriate delivery method, acquisition approach, and project-specific terms for each requirement. The anticipated delivery approach is expected to include the following phases, subject to the final acquisition strategy and project-specific solicitation terms: Phase 1: Design and Pre-Construction Services. The OT Awardee shall collaborate with the Government and, as applicable, the Designer of Record (DOR) or project design team to support scope validation, constructability, cost estimating, schedule development, risk management, design coordination, and development of a proposed construction price. Phase 2: Final Design and Construction. Upon reaching an agreed-upon level of design and completion of pre-construction activities, the Awardee may submit a proposed Guaranteed Maximum Price (GMP) or other agreed-upon construction price, as identified in the applicable solicitation. If the Government accepts the proposed price, the Government may authorize construction execution. If the parties cannot reach agreement on price or other required terms, the Government retains an off-ramp to complete the requirement through an alternative acquisition or delivery method. SUBMISSION INSTRUCTIONS: Please see the attached Market Intelligence Questionnaire pdf and email your response to Mark Corn (Mark.R.Corn@usace.army.mil), Kim Tripp (Kimberly.D.Tripp@usace.army.mil), Theresa Afrank (Theresa.M.Afrank@usace.army.mil), and Jennifer Gosh (Jennifer.Gosh@usace.army.mil) by 29 October 2026 at 14:00 Alaska Time. Any questions regarding the requirement or issues please reach out to Mark Corn and Kim Tripp. | - | Market Research | 10/29/2026 |
This project encompasses construction of a new Flight Simulator facility at Joint Base Elmendorf-Richardson, Alaska. The project includes spaces for 12 simulator devices, academic classroom instruction, briefing rooms, equipment support, and staff offices. The facility will include controlled space(s) that meet Intelligence Community Directive (ICD) 705 criteria and standards. The project is also authorized to have a back-up/standby generator. A key constraint is that the new facility’s telecommunication infrastructure must tie into the Joint Integrated Test and Training Center (JITTC). Therefore, the project will be sited directly adjacent to the JITTC. There is also potential for other MILCON projects ongoing in the general area. | - | Special Notice | 09/28/2026 |
PROJECT TITLE: AK ANG BASE SUPPLY COMPLEX, JBER, ALASKAPROJECT LOCATION: JOINT BASE ELMENDORF RICHARDSON (JBER)ALASKA AIR NATIONAL GUARD SUPPLY COMPLEX, A 52,000 SF HIGH-BAY SUPPLY COMPLEX AND ASSOCIATED 5,600 SF MANAGEMENT SUPPORT ADMINISTRATIVEFACILITY THAT SUPPORTS TRAINING, ADMINISTRATIVE, AND LOGISTICAL REQUIREMENTS FOR THE AKARNG. *********************************************************************** THIS IS TO IDENTIFY THE CONTRACTORS SELECTED TO MOVE TO PHASE 2 FOR THIS ACQUISITION. THE THREE CONTRACTORS ARE AS FOLLOWS: Bethel Contracting, LLC Bristol Design Building Services, LLC GHEMM Solutions, LLC AM-0002 to release Phase 2 of this Solicitation is available ONLY to the Offerors selected to participate in Phase 2. *********************************************************************** | - | Solicitation | 04/10/2026 |
Additional Details
Solicitation Number
W911KB21R0004
Archive Date
Jun 1, 2021
Office Address
ANCHORAGE, AK, 99506-0898