GovChime
Notice ID: bb16a935a29d4403bf728bfb1d9f5c82Solicitation

W911KB 23R0029- FTW469 REPAIR BARRACKS B3718

Archived on November 16, 2023. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−08:00
Posted
November 16, 2023
Notice type
Solicitation
Set-aside
8(a) Set-Aside (FAR 19.8)
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W2SN ENDIST ALASKA
Place of performance
Fort Wainwright, AK, 99703
Last updated
Dec 6, 2025

Identifiers

Solicitation number
W911KB23R0029
Notice ID
bb16a935a29d4403bf728bfb1d9f5c82

Description

This project will repair an existing barracks on Fort Wainwright which is a facility that is in noncompliance with present Army standards. The facility should be compatible with applicable DoD, Army, and base design standards. This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01. Building 3718 is a three-story barracks approximately 24,000 GSF and will include 28 housing units for a total of 56 residents. Each suite will have a private sleeping room for each soldier and a shared kitchen and bathroom. The kitchens include a cooktop, microwave, and full-size fridge. These kitchens will not come with an oven. This project will repair or replace all the major building systems and architectural features including interior finishes, mechanical HVAC systems, electrical systems, lighting and building controls, plumbing, fire protection systems, and provide a new building envelope to improve energy conservation. It is expected that the seismic retrofit will require demolition down to the structure and replacement of all systems and finishes. This project will also repair the existing roof with an EPDM flat, hot roof which will also require new parapets to be added. The new roof will be rated up to R-90 for improved insulation performance. Additionally, both exterior stair towers will be repaired with new towers to meet building code requirements for egress.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W911KB23R0029
  1. Market Research
  2. Pre-Solicitation
  3. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Market ResearchJan 18, 2023

    FTW469 Repair Barracks B3718

    Notice 3a0ad98dc9a2492e892a86d694e2c336 on SAM.gov

  2. Pre-SolicitationJun 22, 2023

    FTW469 Repair Barracks B3718

    Notice 6ccb137720bd41ba9efbaba7390aac9f on SAM.gov

  3. 7×
    SolicitationCurrentJul 19, 2023

    W911KB 23R0029- FTW469 REPAIR BARRACKS B3718

    Notice bb16a935a29d4403bf728bfb1d9f5c82 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
SUBJECT: Sources Sought (RFI) – Fort Wolters H Barracks, Mineral Wells, Texas DISCLAIMER. THIS IS A REQUEST FOR INFORMATION (RFI) / SOURCES SOUGHT NOTICE ONLY. This notice is issued solely for market intelligence, information, and planning purposes. It does not constitute a Request for Proposals (RFP), a Request for Qualifications (RFQ), or a commitment by the Government to write, issue, or award an agreement. The Government will not pay for any information or administrative costs incurred in response to this notice. All response costs will be borne solely by the interested party. PURPOSE. The U.S. Army Corps of Engineers (USACE), Fort Worth District, is conducting active public market intelligence to gauge industry interest, capacity, and capability from commercial construction firms, design-builders, and Non-Traditional Defense Contractors (NDCs). The intent is to gather critical feedback regarding advanced commercial construction methodologies, project delivery risks, and acquisition preferences to support our upcoming project delivery selection. ACQUISITION STRATEGY & NON-FAR MODEL. Statutory Authority: This project will potentially be executed as a Progressive Design-Build (PDB) or Design-Build to Budget (DBtB) project utilizing Other Transaction Authority (OTA) pursuant to 10 U.S.C. § 2808a. Non-FAR Environment: Prospective partners are advised that the Federal Acquisition Regulation (FAR) does NOT apply to this procurement. The negotiated, bilateral Other Transaction Agreement will serve as the sole governing contract. Standard FAR clauses are inapplicable, though federal statutory constraints (such as federal fiscal law, criminal statutes, and general civil laws) remain fully applicable. Phased Agreement Mechanics: PBD Procurement Process: Phase 1, Design & Pre-Construction Services, a design-builder will be selected through a qualifications-based selection (QBS) process. The government will then negotiate a fee for Phase 1 services. There is no requirement to submit price proposals or design concepts during the initial selection. Phase 2, Final Design & Construction, is executed via a bilateral modification to the OT Agreement upon successful negotiation of a Guaranteed Maximum Price (GMP) at approximately 65% design maturity. The Agreement contains an "off-ramp" clause allowing the Government to retain the design and procure construction separately if GMP negotiations fail. DBtB Procurement Process: Solicitation and evaluation during Phase 1 focuses on the qualifications, past performance, and integrated Design-Build experience of each offeror. The Government is evaluating the team and not necessarily how the offeror will design the structure. The Phase 1 evaluation results in the selection of three of the most highly qualified, competitive teams to proceed to Phase 2. Phase 2, the Government will issue the final RFP exclusively to the down-selected teams. This RFP includes the validated, performance-based requirements, establishes the firm Construction Cost Limit (CCL), and clearly defines the basic scope. Note: See link to provide industry feedback https://forms.osi.apps.mil/r/ZQ8Rm8MaN7
74%
Market Research11/04/2026
The U.S. Army Corps of Engineers (USACE), CHARLESTON District, is requesting market intelligence information to identify qualified industry partners capable of supporting a potential Repair and Replace, Design Build to Budget, Other Transaction (OT) Agreement under 10 U.S.C. 2808a for the stated Fort Jackson Barracks Replacement, Columbia, SC. See attachments.
73%
Market Research11/20/2026
This is a SOURCES SOUGHT notice; a market survey for information only, to be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS NOTICE. No reimbursement will be made for any costs associated with providing information or industry response to this notice or any follow up information requests. Not responding to this notice does not preclude participation in any future procurement. If a solicitation is released, it will be synopsized in the System for Award Management (SAM). It is the responsibility of potential offerors to monitor SAM for additional information pertaining to this requirement. The acquisition strategy will be determined based on responses received from this notice and/or other market research methods. The planned acquisition strategy will be posted in SAM upon completion of market research analysis. The purpose of this notice is to gain knowledge of interest, capabilities and qualifications of industry, to include the Small Business Community: Small Disadvantage Business (SDB), the 8(a) Program, Historically Underutilized Business Zones (HUB-Zone), Service-Disabled Veteran Owned Small Business (SDVOSB), Veteran Owned Small Business (VOSB), or Women-Owned Small Business (WOSB). All are highly encouraged to respond. The U.S. Army Corps of Engineers (USACE), Fort Worth District, intends to solicit and award a contract to construct a UEPH Barracks at Fort Hood. The anticipated acquisition will be competitive, Firm-Fixed-Price (FFP), Design-Bid-Build (DBB), definitive contract. The procurement will be conducted in accordance with RFO 15.103-1, using the Best Value, Tradeoff Process approach. The Government is seeking experienced construction firms to construct UEPH barracks at Fort Hood, Texas. The project will provide permanent party housing for 250 Soldiers in closer proximity to existing unit headquarters and motor pools. The facility will be designed in accordance with current Army standard barracks design criteria. Primary facilities include living and sleeping quarters, bathrooms, storage areas, service areas, a dayroom, a self-contained heating, ventilation, and air conditioning (HVAC) system, building information systems, antiterrorism measures, fire protection and alarm systems, Physical Access Control Systems (PACS), Closed-Circuit Television (CCTV), Energy Monitoring and Control Systems (EMCS) connections, and special foundations. The estimated air-conditioning capacity is 260 tons. Supporting facilities include site development, utilities and connections, exterior lighting, paving, waterway road and pedestrian crossings, parking, sidewalks, curbs and gutters, storm drainage, information systems, landscaping, and signage. The project will include Post-Construction Award Services (PCAS) and comprehensive interior design services related to the building and furnishings. The facility will incorporate accessibility features for individuals with disabilities, cybersecurity measures, sustainability and energy-efficiency measures, and antiterrorism features in accordance with applicable Department of Defense (DoD) minimum antiterrorism standards for buildings. The facility will be designed for a minimum service life of 40 years in accordance with DoD Unified Facilities Criteria (UFC) 1-200-02, including applicable requirements for energy efficiency, building envelope performance, and integrated building systems. The target price range for this project is between $99,000.00 and $121,000,000. The estimated Period of Performance is 1,000 calendar days. The North American Industry Classification System code (NAICS) for this procurement is 236220 – Commercial and Institutional Building Construction, which has a small business size standard of $45.0M. The Product Service Code is Y1FC – Construction of Troop Housing Facilities Respondents are reminded that all construction performance must follow the USACE Safety and Health Requirements Manual (EM 385-1-1), and must also comply with all Federal, State and local laws, ordinances, codes and/or regulations. Anticipated solicitation may be issued within 2nd Quarter of Fiscal Year 2027 with an estimated award of 4th Quarter of Fiscal Year 2027. Small Businesses are reminded that RFO clause 52.219-14 – Limitations on Subcontracting will be applicable to this contract; and to pay specific attention to paragraphs (e)(3) and (g). (e)(3) For General Construction, it (the contractor) will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded. (g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants. (1) In a joint venture comprised of a small business protégé and its mentor approved by the Small Business Administration, the small business protégé shall perform at least 40 percent of the work performed by the joint venture. Work performed by the small business protégé in the joint venture must be more than administrative functions. (2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture. Work performed by the 8(a) participants in the joint venture must be more than administrative functions The Supplier Performance Risk System (SPRS) is the Department of Defense, single, authorized application to retrieve supplier performance information. SPRS is a web-enabled enterprise application that gathers, processes, and displays data about the performance of suppliers and must be completed prior to an award in accordance with DFARS 204.76, DFARS 252.204-7020, DFARS 252.204-7024 and DoDI 5000.79. Review NIST SP 800-171 for further information. Contractors are required to achieve, at the time of award, a level 1 Cybersecurity Maturity Model Certification (CMMC). Contractors are required to maintain a current (ie., not more than 3 years old) CMMC at the specified level throughout the life of the contract. See Provision 252.204-7025 and DFARS Clause 252.204-7021. Responses from firms interested in this notice shall not exceed 10 pages and shall include the following information: 1. Firm’s name, UEI #, CAGE Code, address, point of contact, phone number, and e-mail address. 2. Firm’s interest in bidding on the solicitation when it is issued. 3. Firm’s experience to perform the magnitude and complexity outlined in the Scope of Work above by providing: Brief description of the project, customer name, and dollar value of the project – provide UP TO 3 examples. 4. Firm’s Business Size – LB, SB, 8(a), HUBZone, SDVOSB, or WOSB. 5. Will the firm submit a response as a Joint Venture or other arrangement? If YES, specific type: Joint Venture, Mentor-Protégé, Teaming Arrangement, or Other 6. Firm’s Bonding Capacity (construction bonding level per contract and aggregate construction bonding level, both expressed in dollars) [via letter from bonding company]. 7. Experience working on Army facilities? This announcement and all information will be issued via the Government Point of Entry, Procurement Integrated Enterprise Environment and Offerors must be active in SAM to be eligible for award of Government contracts. Award will not be issued to non-compliant offerors until SAM Registration is complete, otherwise offerors will not be eligible for award. Interested Firms shall respond to this notice no later than November 11, 2026, at 2:00pm, Central Standard Time. Email your response to Christine Noriega, Contract specialist at christine.noriega@usace.army.mil and Matthew S. Dickson. Contracting officer at matthew.s.dickson@usace.army.mil
72%
Market Research11/11/2026
****Update Jan 12, 2025***** Amendments 0005 incorporates answers to the questions from ProjNet and updates the Construction Wage Rates.****Update Nov 25, 2025**** Amendment 0004 removes the requirement for PLA and extends the due date to Jan 23, 2026****Update Nov 3, 2025**** Amendment 0003 extends the due date to Dec 4, 2025 while potential changes to the Div 00 specifications are developed****Update Oct 28, 2025**** Amendment 0002 provides answers to PROJNET questions and related specs and drawings.****Update Oct23, 2025**** PROJNET questions answered and proposal due date extended to Nov6 2025 @11:00CsT******The US Army has a requirement to construct a standard design Advanced Individual Training (AIT) Battalion Complex to support 600 Soldiers. Primary facilities include standard design AIT Barracks/Company Operations Facility(ies)(B/COF) for two companies, two (2) lawn equipment buildings, and 2 physical training stations. Construction includes building tornado/storm protection measures; information systems; fire detection and sprinkler suppression systems; integrated energy monitoring and control system (EMCS) connected to base monitoring systems; intrusion detection system (IDS) and alarm systems; and antiterrorism/force protection (AT/FP) measures. Pay close attention to the Site Visit and Bidder Inquiry information located in the Solicitation. All drawings are located online in the PROJENT file by using the Plan Room Key
72%
AwardedOpen
PN 100948 and 94937 Barracks, Fort Hood, Texas. This is a SOURCES SOUGHT notice; a market survey for information only for additional Project Labor Agreement (PLA) replies. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS NOTICE.
72%
Market Research02/10/2026

Additional Details

Solicitation Number

W911KB23R0029

Archive Date

Nov 16, 2023

Office Address

ANCHORAGE, AK, 99506-0898