GovChime
Notice ID: 72cbe35db545423f9c63e408ec60ba0fSolicitation

Pit Tempering Furnace Solicitation

Archived on April 1, 2023. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:00 PM UTC−04:00
Posted
March 2, 2023
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
333994: Industrial Process Furnace and Oven Manufacturing
Agency
Department of WarDepartment of the Army

Notice details

Office
W6QK ACC WVA
Place of performance
Watervliet, NY, 12189
Last updated
Dec 4, 2025

Identifiers

Solicitation number
W911PT23Q0036
Notice ID
72cbe35db545423f9c63e408ec60ba0f

Description

1--PIT TEMPERING FURNACE DUE DATE 17 MAR 2023 QUESTIONS ASKED/ANSWERS 1.Is there a minimum part size requirement? Per 5.3.2.8 Required Accessories, we are to provide a loading/unloading basket which can handle parts up to 33 dia. x 36 tall. We will need to supply a mesh liner for the basket if the smallest parts are capable of falling through the support grid. Minimum part size is not a requirement at this time. 2.Are there approximate measurements of the existing furnace envelope? Does this include a pit or is the existing furnace above ground? Per 5.3.1 Furnace Envelope, the furnace must fit within the space of an existing furnace. As per section 3.20.2, requesting an approximate floor plan of the offer including dimensions of the base of the furnace. I will compare them to the existing unit dimensions. This is installed in a pit on a raised structural steel platform, so it is critical that the unit meet height as well as foot print requirements. The foot print is composite shape so I would need to see the layout. 3.Is there an existing compressed air supply and if so, what is its capacity? Per 5.3.2.2 Cover, the cover shall be provided with a manually actuated hydraulic cylinder for lifting the cover. We typically use pneumatic cylinders to reduce the complications and costs of hydraulics. There are not utilities for a pneumatically operated cover on the existing unit. The current unit is a manually operated, self-contained unit with a simple hydraulic cylinder similar to an automotive jack. If the cover mechanism requires compressed air for operation, it would probably not meet the specification.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W911PT23Q0036
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 2×
    SolicitationCurrentFeb 17, 2023

    Pit Tempering Furnace Solicitation

    Notice 72cbe35db545423f9c63e408ec60ba0f on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W911PT23Q0036

Archive Date

Apr 1, 2023

Office Address

WATERVLIET, NY, 12189-4000