Spring Pack, per Drawing # 11583595, Revision New, for 155MM M284 Cannon, for the Watervliet Arsenal
Archived on February 28, 2026. Original response deadline: . Full description on SAM.gov.
Description
298 EACH - FIRST ARTICLE APPROVAL REQUIRED - Spring Pack, per Drawing # 11583595, Revision New, for 155MM M284 Cannon. To include contract data prepared and delivered in accordance with CONTRACT DATA REQUIREMENTS LIST (DD FORM 1423) which is attached hereto as EXHIBIT A; along with general data drawings attachment A. INSPECTION REQUIRED.
298 EACH - FIRST ARTICLE APPROVAL WAIVED - Spring Pack, per Drawing # 11583595, Revision New, for 155MM M284 Cannon. To include contract data prepared and delivered in accordance with CONTRACT DATA REQUIREMENTS LIST (DD FORM 1423) which is attached hereto as EXHIBIT A; along with general data drawings attachment A. INSPECTION REQUIRED.
19 EACH - FIRST ARTICLE APPROVAL REQUIRED - Spring Pack, per Drawing # 11583595, Revision New, for 155MM M284 Cannon. To include contract data prepared and delivered in accordance with CONTRACT DATA REQUIREMENTS LIST (DD FORM 1423) which is attached hereto as EXHIBIT A; along with general data drawings attachment A. INSPECTION REQUIRED.
19 EACH - FIRST ARTICLE APPROVAL WAIVED - Spring Pack, per Drawing # 11583595, Revision New, for 155MM M284 Cannon. To include contract data prepared and delivered in accordance with CONTRACT DATA REQUIREMENTS LIST (DD FORM 1423) which is attached hereto as EXHIBIT A; along with general data drawings attachment A. INSPECTION REQUIRED.
317 EACH - ***OPTION IN ACCORDANCE WITH FAR 52.217-7*** Spring Pack, per Drawing # 11583595, Revision New, for 155MM M284 Cannon. To include contract data prepared and delivered in accordance with CONTRACT DATA REQUIREMENTS LIST (DD FORM 1423) which is attached hereto as EXHIBIT A; along with general data drawings attachment A. INSPECTION REQUIRED,
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Documents
Showing 1 of 1 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Solicitation | DEPT OF THE ARMY | Jan 14, 2026 | 5.21 MB |
Lifecycle
W911PT26RA002- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationDec 9, 2025
Spring Pack, per Drawing # 11583595, Revision New, for 155mm M284 Cannon, for the Watervliet Arsenal
- SolicitationCurrentJan 14, 2026
Spring Pack, per Drawing # 11583595, Revision New, for 155MM M284 Cannon, for the Watervliet Arsenal
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
Additional Details
Solicitation Number
W911PT26RA002
Archive Date
Feb 28, 2026
Office Address
WATERVLIET, NY, 12189-4050