GovChime
Notice ID: 4f2e071ec5bd4fc388e71865b6037e0cPresolicitation

NOTICE OF INTENT TO SOLE SOURCE - Radar Absorbent Material � RAM Indefinite Delivery/Indefinite Quantity (IDIQ)

Archived on August 2, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:59 AM UTC−04:00
Posted
July 2, 2024
Notice type
Presolicitation
Agency
Department of WarDepartment of the Army

Notice details

Office
W6QK ACC-APG ADELPHI
Place of performance
White Sands Missile Range, NM, 88002
Last updated
Dec 4, 2025

Identifiers

Solicitation number
W911QX24Q0200
Notice ID
4f2e071ec5bd4fc388e71865b6037e0c

Description

Description: The United States Government intends to solicit and negotiate with only one source under the authority of FAR 13.501(a), Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirement based on compatibility with existing equipment, making no other manufacturer capable of meeting the technical specifications. The Government intends to solicit and negotiate with ETS-Lindgren Inc., 1301 Arrow Point Drive Cedar Park, TX 78613. for new and installed Radar Absorbent Materials (RAM) and removal and dispose of existing floor absorbers. This notice of intent is not a request for competitive proposals. However, any responsible source who believes it is capable of meeting the requirement may submit a capability statement, proposal, or quotation, which shall be considered by the agency, only if received by the closing date and time of this notice. A determination not to compete the proposed requirement based upon the responses to this notice is solely within the discretion of the Government. Responses to this notice are due on or before 15 days after posting by 11:59 eastern standard time by email at nicole.g.hernandez2.civ@army.mil. Point of Contact for this notice is nicole.g.hernandez2.civ@army.mil

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W911QX24Q0200
  1. Pre-Solicitation

Formal solicitation typically follows within 30–60 days. (estimate)

  1. Pre-SolicitationCurrentJul 2, 2024

    NOTICE OF INTENT TO SOLE SOURCE - Radar Absorbent Material � RAM Indefinite Delivery/Indefinite Quantity (IDIQ)

    Notice 4f2e071ec5bd4fc388e71865b6037e0c on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Sensigent MSEM 160
66%
Combined Synopsis11/25/2026
Digital Oscilloscope
66%
Combined Synopsis11/20/2026
Rugged Spectrometers
66%
Combined Synopsis11/17/2026
MINICAMS PARTS / Submission Requirements and Technical Compliance - Submission Method: Only bids submitted through the official solicitation portal will be accepted. Emailed submissions will not be considered.Brand Name or Equal: This solicitation is brand name or equal. If quoting an equal product, the bidder must demonstrate that the product meets or exceeds all salient physical, functional, or performance characteristics listed in the description.Mandatory Documentation: A completed Buy American form is required. Bids submitted without a completed form may be deemed non-responsive and rejected.Shipping and Invoicing: Prices must include all shipping, packaging, and inspection charges. A single shipment and invoice are required. Multiple shipments require prior written approval from the WDTC S2P2 Point of Contact (POC).
66%
Combined Synopsis11/16/2026
Nitrogen Content Analysis Equipment: Amendment 0001: 1. Which nitrogen analysis instrument does the laboratory operate today? - Nitrogen determination divides into Kjeldahl and Dumas combustion methods, and the two are not interchangeable with an existing accredited method.The nitrogen analysis is performed using a ferrous sulphate potentiometric titration method. The needed equipment was specified in the solicitation.2. Which method is required here, and is there a required make and model, or will an equal meeting stated salient characteristics be considered? If salient characteristics have been documented, please confirm where they are posted.- Method 4.5.1.2 of MIL-N-00494B and 4.5.1 of MIL-DTL-244C Amendment 1; both publicly available documents. 3. Sample matrix and required throughput.N/A see method4. Scope: is an autosampler, digestion unit, scrubber or fume handling included? Are consumables and reference standards included?No5. Are installation, operational qualification and operator training within contractor scope?This was detailed in the solicitation. 6. Required warranty term and whether a service or calibration plan is in scope.This was detailed in the solicitation. 7. Required delivery date.This was detailed in the solicitation. Amendment 0002: added Brand Name Solicitation
66%
Combined Synopsis10/29/2026

Additional Details

Solicitation Number

W911QX24Q0200

Archive Date

Aug 2, 2024

Office Address

ADELPHI, MD, 20783-1197