Magnaflux A-2030 Magnetic Wet Bench
Archived on February 5, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM CST
- Posted
- January 14, 2026
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 334519: Other Measuring and Controlling Device Manufacturing
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- AMC.ACC.ACC-CTRS.ACC-DTA.W6QK ACC RRAD
- Place of performance
- Texarkana, Texas, 75505
- Last updated
- Nov 4, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W911RQ26A005
- Notice ID
- 37dfc933ef8b49fb966d49475fb248e5
Description
Purchase Description (PD)
Magnaflux A-2030 Magnetic Wet Bench
With AC Magnetization or Equal
For Red River Army Depot (RRAD)
- Scope. This brand name or equal purchase description sets forth the minimum requirements for the purchase and turn-key installation of one (1) each Magnaflux A-2030 Magnetic Wet Bench with AC Magnetization (or equal). The vendor shall supply any tooling and accessories to allow magnetic particle testing in accordance with the specifications outlined in this PD. The vendor shall provide off-loading, unpacking, setup, and connection to all utilities at the installation location. Utilities will be provided within twenty (20) feet of the installation location. At the completion of the equipment installation, the vendor shall provide on-site operator training at RRAD.
- 1.1 Place of Performance. The items acquired via this contract shall be delivered, installed, and made fully operational at building 345 automotive machine shop at Red River Army Depot located at Texarkana, Texas 75507.
-
- Period of Performance. The vendor shall furnish and install all equipment, accessories, tooling, and complete all training and technical requirements of this contract no later than 18 weeks after the date of contract award.
-
- Recognized Holidays. The contractor shall not perform on-site work on the following holidays:
-
-
- New Year’s Day
- Martin Luther King Jr.’s Birthday
- President’s Day
- Memorial Day
- Juneteenth National Independence Day
- Independence Day
- Labor Day
- Columbus Day
- Veteran’s Day
- Thanksgiving Day
-
Christmas Day (Including RRAD Christmas Shutdown)
- General Requirements.
-
- Item Condition. The items offered shall be new and a current production model. A current production model is defined as the manufacturer’s current production model which, on the date this solicitation is issued, has been designed, engineered and sold or is being offered for sale through advertisements or manufacturer’s published catalogue or brochures. Products such as a prototype unit, pre-production model, or experimental units do not qualify as meeting the requirements specified herein. The equipment shall be complete, so that when connected to the utilities identified herein, it can be used for any function for which it was designed and constructed.
-
- General Safety. The equipment shall be fitted with safety devices or coverings for any parts that present safety hazards. The equipment shall include provisions to isolate and lock out all sources of hazardous energy, either input to the equipment or generated by the equipment, to ensure safety of operation and maintenance personnel.
-
- General Standards Compliance. General compliance shall include, but not necessarily be limited to the following:
- Occupational Safety and Health Administration (OSHA) 29 CFR 1910: Code of Federal Regulations, Occupational Safety and Health Standards
- National Fire Protection Agency (NFPA) 70: National Electric Code (NEC), most current edition.
- Vendor shall comply with all local, state, and federal safety, security, and environmental regulations.
- General Standards Compliance. General compliance shall include, but not necessarily be limited to the following:
-
- Environmental Protection. The equipment shall be designed and constructed, so that under the operating service, transportation and storage conditions described herein, the equipment shall not emit materials hazardous to the ecological system as prescribed by federal, state, and local statutes in effect at the time of offer.
-
-
- Compliance with Environmental Laws and Regulations: Contractor shall comply with all applicable federal, state, and local environmental laws, statutes, regulations, executive orders, permits, Army regulations (with supplements), as well as Major Subordinate Command (MSC) and installation regulation, policy, Host Tenant Agreement, Interagency Service Support Agreement, or Status-of-Forces Agreement. Contractor shall immediately report any conflicts between applicable federal, state, local environmental laws, statutes, executive orders, and provisions of Army Regulation 200-1, and any specifications within this contract to the Contracting Officer Representative (COR).
-
-
-
- Conformance with Environmental Management System: Contractor shall take the necessary actions to identify, monitor, and control those contract operations and activities that pose risk of contamination, or can negatively impact the natural and/or human environment.
-
-
- Lubrication. Means shall be provided to ensure adequate lubrication of all moving parts. If the design of the equipment includes a recirculating lubrication system, the system shall include a cleanable or replaceable filter.
-
- Interchangeability. All parts of the end item shall be manufactured to standards and tolerances that will provide for the interchangeability of respective parts between end items of the same model without modification of the part or the equipment. All replacement parts shall be available commercially within the continental United States.
-
- Controls. All mechanical, electrical, hydraulic and pneumatic operating controls required for operation shall be located convenient to the operator's workstation(s).
-
- Equipment Assembly. The equipment shall be constructed of parts that are new, without defects and free of repairs. The equipment construction shall include all components, parts, and features necessary to meet the performance requirements specified herein. All parts subject to damage from environmental hazards (such as dust, debris, or residue) shall be sealed or otherwise protected. The structure shall withstand all forces encountered during the operation of the equipment to its maximum rating and capacity without permanent distortion or failure.
-
- Surfaces. All surfaces shall be clean and free of harmful or extraneous materials. All edges shall be either rounded or beveled unless sharpness is required to perform a necessary function. Except as otherwise specified herein, the condition and finish of all surfaces shall be in accordance with the manufacturer's commercial practices.
-
- Measuring and Indicating Devices. All measuring and indicating devices such as dial indicators, pressure gages, temperature indicators, depth stops, scales, and other similar devices used on the equipment shall be graduated in the U.S. Customary System of Units (US). Markings on all measuring and indicating devices shall be permanently and legibly engraved or etched on a non-glare background. All dials and other type indicating devices shall be securely mounted in place.
-
- Maintainability. The equipment shall be designed and constructed to permit maintenance personnel to easily service the equipment using a minimal number of tools. All parts subject to wear, breakage, or distortion shall be accessible for adjustment, replacement, or repair. Consistent with required maintenance and design of the equipment, the vendor shall provide any special tools required to service the unit. The equipment shall be equipped with access covers to facilitate inspection, cleaning, repair, or replacement of parts.
- Technical Specifications.
3.1 Magnaflux A-2030 Magnetic Wet Bench with AC Magnetization or Equal. The vendor shall provide one (1) each magnetic wet bench with AC magnetization subject to the following specifications:
3.1.1. Capable of 3,000 amps of alternating current magnetization for finding surface defects
3.1.2. Two outputs for independently adjusting each magnetic field, circular or longitudinal
3.1.3. Operator enabled automatic double-mag shot with 1-touch control
3.1.4. Capable of generating 300+ shots per hour at maximum output
3.1.5. Allen-Bradley PLC or equivalent to control mag current
3.1.6. Agitator system for preventing blockages and clumping
3.1.7. User friendly operator interface with touch-screen controls
3.1.8. Direct amperage control and fluctuation mitigation
3.1.9. 5% duty cycle of 0.5 seconds on, 10 seconds off at maximum output
3.1.10. Control Circuit feedback loop for amperage regulation and repeatability
3.1.11. External pump system for particle bath agitation, circulation and application
3.1.12. Integrated decaying AC demagnetization with 1-touch control
3.1.13. Low-voltage output
3.1.14. Adjustable mag shot time from 0.5 to 2 seconds
3.1.15. Mag shot activating front push bar with 1-touch control to enable/disable the feature
3.1.16. Current assurance indicator light
3.1.17. Solid state circuitry
3.1.18. Minimum length of part capacity 102 in
3.1.19. Minimum unsupported part weight capacity 300 lbs
3.1.20. Minimum supported part weight capacity 700 lbs
3.1.21. Minimum part diameter 16 in (Coil size)
3.1.22. Power requirement is 460v
3.1.23. Operator must be able to set amperages in 10 amp increments
3.1.24. Operator adjustable mag shot time
-
- Magnetic Wet Bench Accessories. The vendor shall provide the below listed accessories designed for operation with the magnetic wet bench in order to facilitate mag particle inspection. The provided accessories shall be compatible with the Magnaflux A-2030 Magnetic Wet Bench model to facilitate use with existing equipment.
3.2.1. GE-96 Inspection Enclosure for long item inspection
3.2.1.1. Adjustable overhead frame
3.2.1.2. Easy access through front curtain (theater style)
3.2.1.3. Flame resistant, adjustable length curtain
3.2.1.4. White light and ventilation fan with touchscreen controls
3.2.2. EV6000 Hand-Held LED UV Lamp
3.2.2.1 Must be portable
3.2.2.2. Uniform beam with no hot-spots
3.2.2.3. Circular spot, 9 in wide beam
3.2.2.4. Integrated filter for minimal visible light emission
3.2.2.5. Must meet all current specifications for use with fluorescent liquid penetrant and magnetic particle testing.
3.2.2.6. Fully sealed IP65 rated housing, fan-less cooling system and non-clouding lens
3.2.2.7. Maximum weight of 2.8 lbs
3.2.2.8. 5,000 μW/cm2 maximum irradiance at 15 in
3.2.2.9. Minimum lamp cord length 17 ft
3.2.2.10. Minimum power supply cord length 9 ft
3.2.3. Replacement copper braid pads, (4.75 x 7.5 in) or comparable 2 each
3.2.4. All mag particle penetrant, cleaner, developer, etc. required to perform inspection
- Utilities. The magnetic wet bench shall operate from 460 Volts, Single (1) Phase, maximum 100 amps – RRAD will provide power and air utility connection points within twenty (20) feet of the installation location.
- Installation. The vendor shall provide a full turn-key installation of the magnetic wet bench. This includes off-loading from shipment, unpacking, inspecting, assembling, moving the system into the installation area, leveling, and connection to all utilities. The vendor shall provide all equipment, tooling, and manpower to accomplish the installation. The magnetic wet bench shall be installed in building 345 first floor – automotive machine section.
- Training. The vendor shall provide a factory representative that is thoroughly familiar with all aspects of the magnetic wet bench and accessories for the purpose of training RRAD personnel. The training shall be provided during the normal day shift working hours of RRAD. The training shall include machine operation, programming, preventative maintenance, and troubleshooting. The training shall be provided for a minimum of one (1) working day at RRAD. RRAD will provide items to be used during training. The training shall begin within two (2) weeks of installation completion.
- Warranty. The items furnished under this contract shall be guaranteed for a period of three (3) years, against defective materials, design, and workmanship. Upon receipt of notice from the Government of failure of any part of the system during the warranty period, that part or parts shall be replaced promptly with new parts at the expense of the vendor. The vendor shall provide installation services for replacement items during the warranty period. The warranty is to begin upon final acceptance by the Government.
- Final Acceptance. The Government will examine the equipment supplied during the training portion of this contract to determine technical compliance. Technical compliance is defined as observing acceptable technical operation of the magnetic wet bench and accessories during inspection operations.
- Technical Data. The vendor shall provide a complete set of manufacturer’s technical data for the magnetic wet bench. The technical data shall include at a minimum:
-
- User operation procedures
- Preventative maintenance procedures
- HMI Interface. Any equipment requiring an HMI interface must be approved, prior to award, at the TACOM level.
- Itemized Listing. The vendor shall provide a detailed itemized listing of the proposed contents of the complete system at the time of offer. The itemized listing shall be detailed to allow the Government to determine compliance with the technical requirements described in this PD.
Installation Responsibilities
Government Contractor
() (XX) b. Furnish labor and material handling equipment for
off-loading and placing item on foundation.
() (XX) c. Set and level the machine components on its
foundation.
() (XX) d. Provide and install anchor bolts and nuts if required.
() (XX) e. Connect machine to the provided utilities hook-up.
() (XX) f. Provide all necessary materials, tools, gages and
instrumentation necessary to perform the required tests.
Material and tooling required of the performance testing at
government facility.
() (XX) g. Provide and charge all systems with fluids in accordance with
manufacturer's instructions.
(XX) () h. Provide unobstructed utilities hook-up within 20 feet of
system.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (1)
- Download
Magnaflux Purchase Description.docx
28 KBAdded in Solicitation version 3Posted
Lifecycle
- 3Version 3SolicitationArchivedCurrent
Magnaflux A-2030 Magnetic Wet Bench
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
3 Machine Specific Requirements: The new Magnetic Particle Inspection Machine shall be capable of inspecting the outer surface and the internal surface of the 155mm M284, M776, M199 cannon breeches manufactured at the Watervliet Arsenal.3.1.1 General Physical Requirement: The Magnetic Particle unit complete with: ? Maximum current output 6,000 amps FWDC ? Demagnetization - Reversing DC ? 30in Head Opening ? Digital Ammeter with ?hold? feature ? Infinitely variable current control ? 30in Coil ? Stainless Steel Tank 58in L x 47in W, V shape stainless tank with sufficient pitch angle, mesh screens, and dust covers? Hardwood Grilles ? Foot switch operation ? air chuck ? Full Panels ? Louvered ? Hip Bar ? Powered rotary turn table 500 lb. capacity (safety payload up to 1500lbs.)? 30in diameter coil to be raised and lowered by manual pneumatic valve.? 2in diameter aluminum thru conductor to be raised and lowered by manual pneumatic valve. Thru conductor will manually pivot horizontally for rear storage after use. ? A overhead 500 lb. hoist/trolly will be supplied. ? Full curtain inspection enclosure with REL C4 magnum LED black light and 1000 CFM roof extraction fan. ? Accessory including Keto ring, keto ring CAL fixture, Gould-Bass MD-220 Hall Effect Magnetic Field Strength Meter, and 2 handheld cordless dual white / UV-A LED lights? Voltage 460VAC, 60HZ, 3 phase 200 Amps, Four - No. 4 AWG 3.1.2 Performance Characteristics Magnetizing Output Current (maximum): 6000 DC Control Setting: Infinite adjustment. Regulation: Electronic Rectification: Silicon Controlled Rectifiers (SCRs) Demagnetization Output DC Mode: 6,000 amperes (maximum) alternating polarity ramped to zero amperes Range of Automatic Timer DC Magnetization: 1/6 to 1 seconds ( second normal) DC Demagnetization: 15 to 40 seconds (30 seconds normal) Manual Timing: Manual operation (Remote cable must be used for manual timing) (Terminal cutout will disconnect unit if overheated.) Duty Cycle At 100% Rated Output: .5 seconds ON, 4 minutes OFF At 40% Rated Output: 10 seconds ON, 3 minutes OFF Thermal Cut Out: Disconnects unit if overheated Convenience Outlet: 115V AC, 60 Hz, 5 amperes Weight: 1150 pounds (approximate) Dimensions (Overall) Length: 136 inches Width: 111 inches Height: 112 inches 3.1.2 Detail Description 1. Constructed of a rigid steel framework with full louvered panel finish. 2. Maximum current output is 6,000 amperes FWDC in the conventional mode. 3. Complete with automatic reversing DC demagnetization. 4. Complete with (quick break) circuitry to ensure maximum residual field and maximum repeatability of inspection results. 5. Complete electronic controls including self-indicating plug-in modules for reliability and ease of maintenance. The electronic controls also provide a very fast response time of only 8 milliseconds, i.e. time taken for the magnetizing current to reach the desired level.6. Complete with infinitely variable, current control current selection between zero and maximum output. 7. Fitted with digital readout meter with L.E.D. display, accurate to 1%. This meter has a (hold and display) feature whereby the magnetizing current level is shown and held on display until the next magnetizing shot. The meter is also fitted with a current assurance light which illuminates to show magnetizing current flowing through the component. 8. On the control panel of the unit are mounted all the various switches for choice of current, magnetization or demagnetization, and for contact or coil method. 3.1.3. Conventional Magnetization or Demagnetization In the conventional mode parts can be magnetized in the longitudinal direction and the circumferential direction. The field is applied to the part by either clamping between the head and tail stock and firing a half second current shot through it, or by still retaining the part in the head and tail stock, moving the coil into position, and then energizing the coil. The conventional mode can be carried out with FWDC current.3.1.4 Enclosure: It shall block light such that the inside of the enclosure does not exceed 2 footcandles of brightness. The enclosure shall include a large ventilation fan. The enclosure shall come equipped with a white light, 2 handheld cordless dual white and UV-A LED lights that meet ASTM E1444 and E3022. A calibrated digital radiometer in accordance with ASTM E1444 and E2297-23 for measuring UV in w per cm visible light in foot candles shall be supplied. A main control panel with white light and fan control.3.1.5 Magnetic Particle Solution System: The machine shall come equipped with a minimum 30-gallon stainless steel tank for the magnetic particle solution. A pump system shall recirculate and agitate the solution such that the magnetic particles will not accumulate or settle during operation. The agitation system shall allow the magnetic particle solution to remain within 3% of theoretical level during an 8 hours continuous runtime. The machine shall come equipped with a fluid catch tray to collect the magnetic particle solution that is applied to the workpiece. The machine shall come equipped with a spray nozzle/hose located in the inspection enclosure. The spray nozzle shall be hung above the catch tray when not in use. The magnetic particle solution shall not spill or splash onto the floor during normal operation. The machine shall have a secondary catch pan to catch fluid in case of a leak in the main catch pan. This pan shall have a readily accessible drain but does not need to tie into the recirculation system.3.2 Machine Control System: The machine?s control system shall be located within the inspection enclosure and at the inspection area. 3.2.1 Control Features: ? Machine On Off using the emergency stop button.? Emergency Stop? Workpiece Magnetization/Demagnetization? Pump System On Off? Fan On/Off? White Light On Off? Digital Current Meter Display on control panel.? Infinitely Variable Current Control? Adjustable Shot Time 3.1 Safety Features: E-Stops at inspection station area of machine3.3.2 Digital Current Meter Display: The digital current meter display shall be accurate to 10%. The meter shall have a ?hold and display? feature that displays the magnetizing current level until the next magnetizing shot. The meter shall be fitted with an indicator light that illuminates to show when magnetizing current has flowed through the workpiece.3.3.3 Diagnostic Capabilities: the machine unit shall be equipped with diagnostic capabilities covering the mag control boards.3.4 Requirements for Demonstration of Conformance:3.4.1 Certification of Completeness: The contractor shall provide written certification that the machine is complete, has been properly calibrated, and visually examined for appearance, workmanship, maintainability, and completeness, including all specified system, and accessories.3.4.2 Test of Conformance to Specified Workpiece: The contractor shall perform a magnetic particle inspection on a cannon breech if requested. The machine shall be observed for proper function and compliance with the requirements of this specification. 3.4.3 Additional Testing: If requested the contractor will demonstrate or verify the machine compliance with any requirement in this specification.3.4.4 Provision of Materials and Equipment for Preliminary and Final Acceptance Testing:3.4.4.1 Workpieces: All workpieces to be tested as required in paragraph 3.4.2 shall be provided by Yuma Proving Ground.3.4.4.2 Magnetic Particle Solution: The magnetic particle solution shall be provided by the contractor for the preliminary acceptance and by Yuma Proving Ground for final acceptance.4 Quality Assurance Provisions:4.1 Responsibility for Inspection: The contractor shall be responsible for performing all certifications and tests required in paragraph 3.4 and shall provide such materials, supplies and equipment as specified.4.2 Preliminary Acceptance Inspection: Preliminary acceptance inspection by Yuma Proving Ground level 3 NDT expert shall occur at the contractor?s facility prior to machine shipment to Yuma Proving Ground and shall consist of the certifications and tests specified in paragraph 3.4. When the certification of conformance is completed, the contractor shall provide no less than 15 calendar days notice to the Yuma Proving Ground Contracting Officer that the machine is ready for the preliminary acceptance inspection.4.2.1 Re-inspection Provisions: If, during the course of preliminary acceptance inspection deficiencies are disclosed which cannot be satisfactorily corrected during this visit, preliminary acceptance will be withheld and the contractor will be required to take corrective actions. In such cases, the Yuma Proving Ground POC reserves the right dispatch Yuma Proving Ground representatives to observe a re-inspection. 4.3 Final Acceptance Inspection: Final inspection and acceptance of the machine shall be after installation at Yuma Proving Ground. At this time the machine shall again be subjected to, and required to pass, the test procedures specified in paragraph 3.4. 4.4 Warranty: Upon final acceptance of the machine a Standard Commercial Warranty shall commence for the duration of a one-year warranty covering parts and labor and five-year warranty covering Frame and Tank to include as a minimum, parts and labor for the duration of the warranty, at no cost to the Government. The 1-year period shall commence from the date of notification by the Contracting Officer of the final acceptance. Final acceptance is defined as the act of an authorized representative of the Government, by which the Government assumes ownership of existing supplies/equipment and/or approves specific services rendered, as partial or complete performance of the contract (i.e. testing, training, and delivery of all required technical documentation). 5 Preservation, Packaging and Delivery Instructions: The contractor shall utilize standard commercial methods of preservation and packaging appropriate for machine tools and acceptable to commercial carriers. As a minimum, all areas susceptible to damage from exposure to the elements shall be preserved and/or packed to prevent damage. The machine and equipment shall be blocked, braced and skidded to prevent damage during transport and to facilitate handling, loading and unloading. The contractor shall be responsible for ensuring that the machine and equipment are delivered to Yuma Proving Ground in good condition and shall retain this responsibility until the machine and equipment are offloaded at Yuma Proving Ground by the responsible parties. | 71% | Combined Synopsis | 07/03/2026 |
Digital Oscilloscope | 61% | Combined Synopsis | 11/20/2026 |
Rugged Spectrometers | 61% | Combined Synopsis | 11/17/2026 |
MINICAMS PARTS / Submission Requirements and Technical Compliance - Submission Method: Only bids submitted through the official solicitation portal will be accepted. Emailed submissions will not be considered.Brand Name or Equal: This solicitation is brand name or equal. If quoting an equal product, the bidder must demonstrate that the product meets or exceeds all salient physical, functional, or performance characteristics listed in the description.Mandatory Documentation: A completed Buy American form is required. Bids submitted without a completed form may be deemed non-responsive and rejected.Shipping and Invoicing: Prices must include all shipping, packaging, and inspection charges. A single shipment and invoice are required. Multiple shipments require prior written approval from the WDTC S2P2 Point of Contact (POC). | 61% | Combined Synopsis | 11/16/2026 |
Nitrogen Content Analysis Equipment: Amendment 0001: 1. Which nitrogen analysis instrument does the laboratory operate today? - Nitrogen determination divides into Kjeldahl and Dumas combustion methods, and the two are not interchangeable with an existing accredited method.The nitrogen analysis is performed using a ferrous sulphate potentiometric titration method. The needed equipment was specified in the solicitation.2. Which method is required here, and is there a required make and model, or will an equal meeting stated salient characteristics be considered? If salient characteristics have been documented, please confirm where they are posted.- Method 4.5.1.2 of MIL-N-00494B and 4.5.1 of MIL-DTL-244C Amendment 1; both publicly available documents. 3. Sample matrix and required throughput.N/A see method4. Scope: is an autosampler, digestion unit, scrubber or fume handling included? Are consumables and reference standards included?No5. Are installation, operational qualification and operator training within contractor scope?This was detailed in the solicitation. 6. Required warranty term and whether a service or calibration plan is in scope.This was detailed in the solicitation. 7. Required delivery date.This was detailed in the solicitation. Amendment 0002: added Brand Name Solicitation | 61% | Combined Synopsis | 10/29/2026 |
Additional Details
Solicitation Number
W911RQ26A005
Archive Date
Feb 5, 2026
Office Address
TEXARKANA, TX, 75507-5000