GovChime
Notice ID: 22e8c2a266cf4ecd969e98116f15064fCombined Synopsis/SolicitationArchived

Automatic Aqueous Parts Washer

Archived on March 17, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM CST
Posted
February 23, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
333310: Commercial and Service Industry Machinery Manufacturing
Agency
Department of WarDepartment of the Army

Notice details

Office
AMC.ACC.ACC-CTRS.ACC-DTA.W6QK ACC RRAD
Place of performance
Texarkana, Texas, 75505
PSC
4940: MISCELLANEOUS MAINTENANCE AND REPAIR SHOP SPECIALIZED EQUIPMENT
Last updated
Nov 2, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W911RQ26QA010
Notice ID
22e8c2a266cf4ecd969e98116f15064f

Description

Purchase Description (PD)

Automatic Aqueous Parts Washer

Commodity Section II, Combat Division, B-421S

Red River Army Depot (RRAD)

Texarkana, TX 75507-5000

  1. Scope

This Purchase Description is to define the specifications necessary to award a contract to purchase and install a new STINGRAY 4063 PARTS WASHER with upgrades or Equal  automatic aqueous parts washer to replace system currently in place in B-421S, Serial # 3963 MART Tornado manufactured in 1993. Contractor shall perform any site preparation needed for new equipment, delivery of new equipment, offloading and positioning of new equipment, planning and designing, fabrication, testing, installation, training, and commissioning necessary to furnish one automatic aqueous parts washer. Contractor is required to have the adequate resources for the manufacture of a system, and upon completion, shall be installed in building (B-421South), and made fully operational (Turnkey), with operator and maintenance personnel training completed, prior to the Government’s acceptance.

1.1 Order of Precedence

In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence.  Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.

2.0 Requirements

Design, fabricate, and install a new STINGRAY 4063 PARTS WASHER with upgrades or Equal automatic aqueous parts washer capable of meeting or exceeding current washer size and requirements, which are as follows:

Power- 460V 3PH

Heat Source- Steam

Pump HP- 50+

Flow- 320gpm+

Pressure- 150psi+

Temp Range- 140-190 degrees F

Reservoir Capacity- 180 gallons+

Heavy Duty Turntable w/anchoring attachments- 3500LB+

Oscillating non-synchronous wash pattern

Automatic Programmable Oil Skimmer

2.0 Requirements cont’d

Insulated Cabinet

Automatic Steam Drying Cycle

Stainless steel cabinet internals

Internal reservoir cover w/chip basket

Electrical system to meet NFPA 79 requirements to include:

            Safety power disconnect

            Hour meter

            Turntable Jog

            Lifting Lugs

            Drain and Clock override

Stainless steel heat exchanger

Emergency Stop with Master Control Relay

3.0 Time Period

The machine shall be installed and operational within 12 months from contract award.  The contractor shall submit a detailed project time chart that shows milestones for a completed machine installation within the 12 months.  Any modifications or extensions shall be requested through the Contracting Officer for this contract. The contractor shall coordinate the proposed installation schedule with RRAD POC within sixty (60 Days) prior to delivery of the system. The installation schedule shall be subject to approval.  Approval of the installation schedule shall not relieve the contractor of any responsibility for performance.  RRAD works a four day, ten hour workweek, Mon-Thurs, 0630-1700.  Working Friday is not guaranteed but will be taken into consideration.  Contractor may request to work Friday with 48 hours prior notice to RRAD POC. In Accordance With (IAW) CDRL A0001

RRAD will be closed on all Federal Holidays which are:

New Year’s Day

Martin Luther King Birthday

President’s Day

Memorial Day

Juneteenth

Independence Day

Labor Day

Columbus Day

Veteran’s Day

Thanksgiving Day

Christmas Day

3.1 Installation

Contractor shall offload, position, and make operational all equipment.  Console/Stand shall be built or assembled on mobile stand so it can be relocated with minimal impact to production. Government will furnish all necessary utilities within 20 feet of the equipment site. Contractor shall make all connections to the utilities from the equipment to the provided hookup.

3.2 Lockout/Tagout (LOTO)

Contractor shall furnish a graphical, machine-specific LOTO procedure that clearly and specifically describes the steps necessary to establish a zero-energy state for the equipment in accordance with the requirements of OSHA Regulation CFR 1910.147.  This procedure shall be printed on a durable laminated material suitable for posting on the equipment.  All LOTO locations on the equipment shall be clearly identified with a durable label keyed to the LOTO procedure.  Contractor shall furnish the procedure in an electronic format so the information can easily be transferred into a maintenance management. In Accordance With (IAW) CDRL A0002

3.3 Training

The contractor shall provide one or more qualified representatives who are thoroughly familiar with all aspects of equipment, installation, calibration, maintenance, and operation, for the purpose of training facility personnel.  All printed training aids shall be supplied at no additional cost to the Government and shall be in English language.  Training consist of a minimum of 5 hours for system operation personnel (10 people) and 5 hours for maintenance personnel (5 people).  It shall consist of verbal instruction and hands-on operations by contractor representative. In Accordance With (IAW) CDRL A0004

3.3.1 Training Location

Training shall be performed at RRAD building 421-S, and shall commence after onsite training testing and run off of the system.  Training shall be provided for machine tending operators on system operations and maintenance personnel on general maintenance schedule.

3.4 Manuals

The contractor shall provide three (3) hard copies and one electronic copy on CD/DVD of operations sequence, system program, Bill of Materials (BOM), wiring diagrams/schematics, maintenance manuals for contractor installed equipment including calibration information and procedures where applicable. In Accordance With (IAW) CDRL A0005

3.5 Government Furnished Materials (GFM)

The government will provide all necessary test materials during startup and testing.

3.6 Warranty

The machine furnished under this specification shall be guaranteed for a period of one (1) year or manufacturer’s standard warranty (whichever is greater) from defective materials, design, and workmanship.  Upon receipt of notice from the Government of failure of any part of the machine during the warranty period, that parts shall be replaced within 7-10 business days with new parts at the expense of the contractor.  All commercial OEM equipment included with the machine shall be guaranteed to the manufacturer’s normal warranty or covered under the one (1) year guarantee from the time of acceptance, whichever is longer.  The warranty is to begin upon final acceptance by the Government.

3.7 Preparation

Packaging, preservation, and packing for shipment to RRAD shall be the responsibility of the contractor.  Any damage to materials, components, equipment, or other parts of the machine due to contamination, oxidation, shifting loads, or other circumstances during transportation shall be repaired or replaced by the contractor at the discretion of the Contracting Officer. All packaging and any shipping material shall be the responsibility of the contractor to remove from Depot.

Responsibilities

Government     Contractor

            ()             (XX)             a.  Furnish labor and material handling equipment for

                                                      off-loading and placing item on location.

            ()             (XX)             b.  Connect machine to the provided utilities hook-up.

            ()             (XX)             c.  Provide all necessary materials, tools, gages and

                                                     instrumentation necessary to perform the required tests.

                                                

()             (XX)             d.  Provide and charge all systems with fluids in accordance                              

                                                     with manufacturer's instructions.

            (XX)          ()                e.  Provide unobstructed utilities hook-up within 20 feet of

                                                     system.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (5)

  • CDRL A0005 Manuals Parts Washer.pdf

    205 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • CDRL A0004 Training Parts Washer.pdf

    205 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • CDRL A0002 Lockout Tagout Parts Washer.pdf

    206 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • CDRL A0001 Project Time Period Parts Washer.pdf

    116 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • Combined Synopsis Power washer V 0.3.pdf

    161 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download

Lifecycle

  1. 3
    Version 3Combined Synopsis/SolicitationArchivedCurrent

    Automatic Aqueous Parts Washer

    Notice 22e8c2a266cf4ecd969e98116f15064f on SAM.gov

  2. 6
    Version 6Award NoticeArchived

    Type changed from Combined Synopsis/Solicitation to Award Notice

    Automatic Aqueous Parts Washer

    Notice 30450a5f4e8f4108b00fbb5a99db9aa0 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

W911RQ26QA010

Archive Date

Mar 17, 2026

Office Address

TEXARKANA, TX, 75507-5000