Notice ID: 1038c2520c434840b8b55ee32e6c5f0dCombined Synopsis/Solicitation
Commercial Water Heaters - Fort Bragg
Responses closed . Full description on SAM.gov.
Overview
- Response deadline
- 12:25 PM EDT
- Posted
- May 27, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 333414: Heating Equipment (except Warm Air Furnaces) Manufacturing
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- AMC.ACC.MISSION INSTALLATION CONTRACTING COMMAND.419TH CSB.W6QM MICC-FT DRUM
- Place of performance
- Bldg. 249 Boxcar St. Pope AAF, NC 28308, 28308
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W911S226U3321
- Notice ID
- 1038c2520c434840b8b55ee32e6c5f0d
Description
Commercial Water Heaters - Fort Bragg
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Links (4)
- PIEE Solicitation Module Link for W911S226U3321piee.eb.milPosted
- Web Based Training for the PIEE Solicitation Modulepieetraining.eb.milPosted
- Registration Instructions for the PIEE Solicitation Modulewww.acq.osd.milPosted
- Department of Defense Procurement Toolboxdodprocurementtoolbox.comPosted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationCurrent
Commercial Water Heaters - Fort Bragg
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Amended to decrease the days due cut off date. PURPOSE OF THE AMMENDMENT IS TO INCREASE THE QUANTITY FROM 25 TO 37 HEATERS | - | Combined Synopsis | 09/24/2026 |
Temp Boiler Unit | - | Combined Synopsis | 09/02/2026 |
Temp Boiler Unit | - | Combined Synopsis | 09/02/2026 |
Temp Boiler Unit | - | Combined Synopsis | 09/02/2026 |
Brand name or exact match, MINIMUM REQUIREMENTS: Condensing Hot Water Boiler, rated at 399 MBH Input, 359 MBH Output, Natural Gas Fired at 90% Efficiency Full Modulation Firing 5:1 Turndown, 4? Outlet (AL29-4C),120/1/60 Voltage. Unit will include all manufactures standard equipment, condensate neutralizing kit, start-up services and a ten (10) year warranty on the heat exchanger due to defects in material and workmanship, a twenty-five (25) year warranty on the heat exchanger due to thermal stress, and a one (1) year parts warranty, no labor MUSTINCLUDE: -BACnet Protocessor -Dungs lock-up style high gas pressure regulator. Preferred model: Model KN4 Condensing Hot Water Boiler | - | Combined Synopsis | 01/12/2026 |
Additional Details
Solicitation Number
W911S226U3321
Archive Date
May 27, 2027
Office Address
FORT DRUM, NY, 13602-5220