Notice ID: 84dbcfac8469487eb5fea5a7aa9b3a1bCombined Synopsis/Solicitation
Air Curtain Ash Rake
Responses closed . Full description on SAM.gov.
Overview
- Response deadline
- 3:00 PM CDT
- Posted
- May 28, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- AMC.ACC.MISSION INSTALLATION CONTRACTING COMMAND.419TH CSB.W6QM MICC-FT DRUM
- Place of performance
- Ft Hood TX, 76544
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W911S226U3336
- Notice ID
- 84dbcfac8469487eb5fea5a7aa9b3a1b
Description
2026 or 2027 new air curtain ash rake compatible for the Air Burners S327 Air Curtain. CONSTRUCTION: Material - High carbon steel rake head with reinforced welds; Handle -Heavy gauge steel tubular handle; Heat Rating - Suitable for continuous exposure to 1,600?2,000 F chamber temperatures; Finish - Industrial high temp black oxide or heat resistant coating. DIMENSIONS: Overall Length: 72?96 inches (6?8ft), Rake Head Width: 12?16 inches, Rake Head Thickness: 1/4in ? 3/8in plate steel, Handle Diameter: 1?1.25in WEIGHT: Approx. 12?18lbs, depending on length and head configuration. FUNCTIONAL USE - PRIMARY FUNCTIONS: Ash leveling during active burns, pulling unburned material toward the combustion zone, clearing burn chamber floor after shutdown, managing hot coals to maintain optimal burn efficiency, assisting with chamber clean out before next operational cycle. OPERATIONAL COMPATIBILITY -DESIGNED FOR USE WITH: Fire Box S Series (S111, S220, S327, S330, S460, etc.), Fire Box skid mounted and trailer mounted units, Air Curtain Destructor (ACD) military variants. SAFETY and COMPLIANCE - SAFETY FEATURES: Extended handle length for operator standoff distance, heat resistant construction to prevent tool failure, reinforced rake head to withstand heavy debris loads. Option - The optional ash clean-out implement with a blank 1in steel faceplate, for welding on a future connection supplied by the buyer. Final price shall include shipping to Ft Hood TX 76544.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Links (4)
- PIEE Solicitation Module Link for W911S226U3336piee.eb.milPosted
- Web Based Training for the PIEE Solicitation Modulepieetraining.eb.milPosted
- Registration Instructions for the PIEE Solicitation Modulewww.acq.osd.milPosted
- Department of Defense Procurement Toolboxdodprocurementtoolbox.comPosted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationCurrent
Air Curtain Ash Rake
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W911S226U3336
Archive Date
May 28, 2027
Office Address
FORT DRUM, NY, 13602-5220