GovChime
Notice ID: ce474646ce6e12274f65bb3603ea58c7Presolicitation

N--Installation of 2 HVAC sytems for controlled environment.

Archived on October 19, 2009. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 AM UTC−05:00
Posted
July 6, 2009
Notice type
Presolicitation
NAICS
238220: Plumbing, Heating, and Air-Conditioning Contractors
Agency
Department of WarDepartment of the Army

Notice details

Office
W6QM MICC-DUGWAY PROV GRD
Place of performance
ACA, Dugway Proving Ground Division of Contracting, Building 5330 Valdez Circle Dugway UT 84022-5000 US
PSC
N: INSTALLATION OF EQUIPMENT
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W911S609R0009
Notice ID
ce474646ce6e12274f65bb3603ea58c7

Description

Pre-Solicitation Notice W911S6-09-R-0009 The U.S. Army Dugway Proving Ground Directorate of Contracting intends to issue a request for proposals (RFP) for interested contractors to provide all labor, tools, materials, equipment, and supervision to install 2 HVAC Systems the Ditto area of Dugway Proving Grounds, Dugway, Utah in accordance with solicitation plans and specifications. The plans and specifications will be posted on the FBO website once the RFP is released for competition. The formal RFP is anticipated to be released on or around June 11, 2009. This acquisition is unrestricted. All qualified contractors, as described in the solicitation, shall be allowed to submit a proposal. The estimated price range for this project is between $275,000.00 and $325,000.00. The estimated completion date is anticipated to be 120 calendar days after notice to proceed.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Paul E. Frailey, 435-831-2587 ACA, Dugway Proving Ground

Documents

No documents available.

Lifecycle

Solicitation:W911S609R0009
  1. Pre-Solicitation

Formal solicitation typically follows within 30–60 days. (estimate)

  1. 3×
    Pre-SolicitationCurrentMay 28, 2009

    N--Installation of 2 HVAC sytems for controlled environment.

    Notice ce474646ce6e12274f65bb3603ea58c7 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Amendment 0001 posted Summary of Changes: Terms & Conditions Added bullet 8 for attachments C04 Attachment 9 – Q&A’s and Pictures Disregard questions as we are past the due date for all main questions Solicitation closing extended to November 20th, 2026 with offers due by 1500hrs MST Attachment 9 – Q&A Question and Answers from site visits and email submissions received by vendors. Statement of Work Added , 454B or R32 GWP refrigerants are also acceptable to Refrigerant requirements Updates to verbiage/requirements and information based on site visits Added Duchesne Bunkhouse floor plan and work notes, see page 20 Schedule of Items Adjusted to show correct solicitation #: 1240LR27Q0002 ****As a heads up we will be issuing an amendment for this solicitation prior to the current due date for quotes listed in the current solicitation. We will be extending the due date which will be listed in the amendment forthcoming. If you already submitted please resubmit an updated quote after the amendment has been sent out so that you can review the updates and sign the amendment form (SF30) and return it with your quote.**** This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotatuions are being requested and a separate written solicitation will not be issued. Solicitation number1240LR27Q0002 is issued as a Requst for Quotation (RFQ) for : BASE BID – The work under this contract includes furnishing all labor, materials, equipment, tools, transportation, and incidentals necessary to remove the existing 5‑ton air‑cooled refrigerant condenser unit and associated indoor coil, and to provide and install a new 2.5‑ton air‑cooled condenser unit and compatible indoor coil at the Duchesne Bunkhouse. Work shall include, but is not limited to: • Disconnecting, recovering, and properly disposing of all refrigerant in accordance with federal and state environmental regulations. • Disconnecting and removing the existing condenser, indoor coil, associated piping, electrical connections, mounting hardware, and any other components required for a complete system removal. • Providing and installing the new 2.5‑ton condenser and coil, including all refrigerant piping, line sets, insulation, fittings, mounting pads, vibration isolation, and supports as required. • Making all necessary electrical modifications, including reconnection to existing circuits, installation of new disconnects or breakers if required, and ensuring code‑compliant grounding and bonding. • Pressure‑testing, evacuating, and charging the new system with the appropriate refrigerant type and quantity, following manufacturer specifications. • Verifying proper airflow, condensate drainage, thermostat compatibility, and control wiring to ensure a fully functional and balanced system. • Performing system start‑up, testing, and commissioning to confirm proper operation and to meet manufacturer performance standards. • Restoring and/or repairing all surfaces, penetrations, and finishes affected by the work, leaving the site in clean and workmanlike condition. All work shall be completed in accordance with applicable codes, manufacturer instructions, and agency standards to provide a fully operational and complete HVAC system. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238220. The small business size standard is $19 Million. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
-Combined Synopsis11/20/2026
Upgrade the existing heating infrastructure in building 1515 on Hill AFB in accordance with the Statment of Work. The objective is to transition from the current steam heat exchanger system to a more efficient, decentralized gas-fired hot water boiler system.
-Combined Synopsis11/12/2026
Operations Mechanical BPA
-Solicitation12/11/2026
Portable Air Conditioners
-Combined Synopsis11/17/2026
PROJECT TITLE: REMOVE AND REPAIR TWO (2) HIGH VELOCITY AIR HANDLING UNITSPROJECT LOCATION: WATERVLIET ARSENAL, BUILDING 35TO PROVIDE ALL LABOR MATERIAL, PARTS AND EQUIPMENT REQUIRED TO REMOVE AND REPLACE TWO (2) HIGH VELOCITY AIR HANDLING (HV) UNITS AT BUILDING 36 AT WATERVLIET ARSENAL.ALL WORK TO BE PERFORMED IN ACCORDANCE WITH STATEMENT OF WORK #26PW056.WAGE DETERMINATION NY2, MOST RECENT REVISION, APPLIES AND IS INCORPORATED.100% PAYMENT AND PERFORMANCE BONDS ARE REQUIRED.TECHNICAL POC IS MICHAEL WHITE.SITE VISITDATE: Tuesday, 10 November 2026 @ 10:00 a.m. LOCATION: 1 Buffington St. Watervliet, NY 12189 (Watervliet Arsenal)FOR ACCESS INTO THE FRONT GATE PLEASE CONTACT Maria DeCrescenzo, (518)266-4641 WITH NAME(S) AND COMPANY REPRESENTED AT LEAST A MINIMUM OF 24 HOURS INADVANCE OF SITE VISIT.MEETING POINT IS THE FRONT GATE PARKING AREA JUST INSIDE THE MAIN ENTRANCE.PLEASE PLAN TO ARRIVE AT LEAST 15 MINUTES EARLY TO ALLOW TIME GETTINGTHROUGH THE GATE PROCESSING THROUGH THE VISITORS CENTER.POINT OF CONTACT IS: Maria DeCrescenzo (518) 266-4641THIS IS THE ONLY SITE VISIT, ALTERNATE DATES AND/OR TIMES WILL NOT BE GRANTED!
-Combined Synopsis11/25/2026

Additional Details

Solicitation Number

W911S609R0009

Archive Date

Oct 19, 2009

Office Address

DUGWAY, UT, 84022-5000