Notice ID: 083469c9e2347ff153be703a03a0fb36Sources Sought
93--SIP-Hut
Archived on April 30, 2013. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 6:00 AM UTC+01:00
- Posted
- March 1, 2013
- Notice type
- Sources Sought
- NAICS
- 321992: Prefabricated Wood Building Manufacturing
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W6QM MICC-WEST POINT
- Place of performance
- MICC - West Point Directorate of Contracting, ATTN: SFCA-NR-WP, 681 Hardee Place West Point NY 10996-1514 US
- PSC
- 93: NONMETALLIC FABRICATED MATERIALS
- Last updated
- Dec 5, 2025
Identifiers
- Solicitation number
- W911SD13T0122
- Notice ID
- 083469c9e2347ff153be703a03a0fb36
Description
SIP-Hut Building Foundation The building will have outside dimensions of 16-ft. x 32-ft. and will be built on a series of piers approximately 8-in. in diameter placed on an 8-ft. x 8-ft. grid. The SIP solution must be able to rest on the pier system with no additional foundation support members provided by the purchaser. The purchaser will provide the piers and all necessary tie-down hardware to resist lateral loads. Building Envelope The building will appear as in Figure 1 with the outside dimensions being 16-ft. x 32-ft. The plate height on the eaves will be 8 ft. from the surface of the floor The door opening on each end of the building will be centered and accommodate a 36-in. x 80-in. door. The entire building envelope (floor, walls, roof) will be constructed with Structural Insulated Panels (SIPs). The roof, walls and floor must have insulation ratings of R-40, R-26, and R-30, respectively. It is desirable to keep panel thickness to a minimum. The SIPs will be constructed with an Exposure 1 OSB that meets product standard PS 2-92. The individual panels cannot weigh more than 200 lbs. nor be greater than 8-ft. in one of its two dimensions to allow placement in a standard military shipping container (CONEX). The roof pitch will be 4:12 on the gable end. The minimum overhang for gables and eaves will be 1 ft. Constructability The SIP system must be designed for ease of assembly by soldiers having little familiarity with the system or design. Easy assembly is characterized by wall and roof panel connections that align easily and require relatively few actions on the part of the assembler. An example of such a connection is a cam-lock system which is engaged by turning a bolt using a T-wrench. The SIP solution provided must include all required splines, foam sealant with dispensing guns, panel screws, and shop drawings. The SIP system must be easily disassembled to enable repackaging and movement to another location. The SIP provider must provide on-site assembly assistance with the building package.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Richard Williams, 845-938-0821 MICC - West Point
Documents
No documents available.
Lifecycle
Solicitation:
W911SD13T0122- Market Research
Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W911SD13T0122
Archive Date
Apr 30, 2013