Notice ID: 3ebfcc84613bf8fad5c8ba68216ae416Solicitation
Y--North Park Lake Section 206 Aquatic Ecosystem Restoration
Archived on November 29, 2009. Full description on SAM.gov.
Overview
- Posted
- September 14, 2009
- Notice type
- Solicitation
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W072 ENDIST PITTSBURGH
- Place of performance
- US Army Corps of Engineers, Pittsburgh District 1000 Liberty Avenue, W.S. Moorhead Federal Building, 21st Floor Pittsburgh PA 15222-4186 US
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W911WN09B0005
- Notice ID
- 3ebfcc84613bf8fad5c8ba68216ae416
Description
The work under this contract shall be performed at North Park Lake, the Wildwood Mine Sediment Disposal Site, and the haul routes to the disposal site, all located in Allegheny County, PA. North Park Lake is located within North Park, a County-operated recreation facility that lies about 10 miles north of the City of Pittsburgh, PA. The project is separated into three construction packages (Site Preparation Allegheny County, Phase I U.S. Army Corps of Engineers (USACE), and Phase II- Allegheny County). This contract award is for Phase I only, which is the only phase of the project awarded by the U.S. Army Corps of Engineers, Pittsburgh District. Phase I consists of excavation from the upstream end of North Fork Pine Creek arm to an area near the dam. Water depths in the North Fork Pine Creek arm currently range from a few inches to about 2 feet. Excavation of this area willcreate depths that range from shallow shoreline areas to approximately 12 feet at the most downstream end of the lake arm. The volume of excavation isspecified in the contract line item schedule. Excavation will be performed in the dry. Following excavation, habitat structures (rock humps, porcupine cribs, etc.) will be placed to provide cover for fish and to increase benthic production. Coir logs will be placed along portions of the shoreline to prevent erosion and encourage wetland vegetation growth near shore. These habitats are important for fish spawning and provide nursery areas for young fish. Phase I work will also include installation, staging, and removal of temporary stream diversions, including temporary crossings; and wetland vegetation planting, including c oir log plantings and surrounding shoreline plantings.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Carole Householder, 412-395-7274 US Army Corps of Engineers, Pittsburgh District
Documents
No documents available.
Lifecycle
Solicitation:
W911WN09B0005- Pre-Solicitation
- Solicitation
- Awarded
Award typically follows within 30–90 days after the response deadline. (estimate)
- 9×Pre-SolicitationMay 15, 2009
Y--North Park Lake Section 206 Aquatic Ecosystem Restoration
- AwardedSep 14, 2009
Y--North Park Lake Section 206 Aquatic Ecosystem Restoration
- SolicitationCurrentSep 14, 2009
Y--North Park Lake Section 206 Aquatic Ecosystem Restoration
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W911WN09B0005
Archive Date
Nov 29, 2009