GovChime
Notice ID: 3ebfcc84613bf8fad5c8ba68216ae416Solicitation

Y--North Park Lake Section 206 Aquatic Ecosystem Restoration

Archived on November 29, 2009. Full description on SAM.gov.

Overview

Posted
September 14, 2009
Notice type
Solicitation
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W072 ENDIST PITTSBURGH
Place of performance
US Army Corps of Engineers, Pittsburgh District 1000 Liberty Avenue, W.S. Moorhead Federal Building, 21st Floor Pittsburgh PA 15222-4186 US
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W911WN09B0005
Notice ID
3ebfcc84613bf8fad5c8ba68216ae416

Description

The work under this contract shall be performed at North Park Lake, the Wildwood Mine Sediment Disposal Site, and the haul routes to the disposal site, all located in Allegheny County, PA. North Park Lake is located within North Park, a County-operated recreation facility that lies about 10 miles north of the City of Pittsburgh, PA. The project is separated into three construction packages (Site Preparation Allegheny County, Phase I U.S. Army Corps of Engineers (USACE), and Phase II- Allegheny County). This contract award is for Phase I only, which is the only phase of the project awarded by the U.S. Army Corps of Engineers, Pittsburgh District. Phase I consists of excavation from the upstream end of North Fork Pine Creek arm to an area near the dam. Water depths in the North Fork Pine Creek arm currently range from a few inches to about 2 feet. Excavation of this area willcreate depths that range from shallow shoreline areas to approximately 12 feet at the most downstream end of the lake arm. The volume of excavation isspecified in the contract line item schedule. Excavation will be performed in the dry. Following excavation, habitat structures (rock humps, porcupine cribs, etc.) will be placed to provide cover for fish and to increase benthic production. Coir logs will be placed along portions of the shoreline to prevent erosion and encourage wetland vegetation growth near shore. These habitats are important for fish spawning and provide nursery areas for young fish. Phase I work will also include installation, staging, and removal of temporary stream diversions, including temporary crossings; and wetland vegetation planting, including c oir log plantings and surrounding shoreline plantings.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Carole Householder, 412-395-7274 US Army Corps of Engineers, Pittsburgh District

Documents

No documents available.

Lifecycle

Solicitation:W911WN09B0005
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 9×
    Pre-SolicitationMay 15, 2009

    Y--North Park Lake Section 206 Aquatic Ecosystem Restoration

    Notice ae28fed2fe66cf420e2e9dcccb8d20d6 on SAM.gov

  2. AwardedSep 14, 2009

    Y--North Park Lake Section 206 Aquatic Ecosystem Restoration

    Notice 13f2adc8f1a023d41f77ab3ae4e521d1 on SAM.gov

  3. SolicitationCurrentSep 14, 2009

    Y--North Park Lake Section 206 Aquatic Ecosystem Restoration

    Notice 3ebfcc84613bf8fad5c8ba68216ae416 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W911WN09B0005

Archive Date

Nov 29, 2009

Office Address

PITTSBURGH, PA, 15222-4198