Notice ID: b2f44c6e7a8646946efcb7ef6e92a464Combined Synopsis/Solicitation
95--Structural Steel Shapes
Archived on March 25, 2013. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 6:00 AM UTC+01:00
- Posted
- January 24, 2013
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 332111: Iron and Steel Forging
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W072 ENDIST PITTSBURGH
- Place of performance
- USACE District, Pittsburgh 1000 Liberty Avenue, W.S. Moorhead Federal Building, 22nd Floor Pittsburgh PA 15222-4186 US
- PSC
- 95: METAL BARS, SHEETS, SHAPES
- Last updated
- Dec 5, 2025
Identifiers
- Solicitation number
- W911WN13T0014
- Notice ID
- b2f44c6e7a8646946efcb7ef6e92a464
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. 1. SURFACE PREPARATION. ITEMS 1 THRU 16 to be abrasive blast and prime coated. ITEMS 1 thru 16 shall be abrasive blasted to a minimum Steel Structures Painting Council SSPC-SP6, Commercial Blast, per the Steel Structures Painting Council. The blast profile should be jagged rather than quote mark peened quote mark and between 1-1/2 to 2-1/2 mils. After blasting, vacuum or blow off all dust and ensure surface remains clean before painting. Then apply one coat of CATHO-COAT 302H ZINC PRIMER as manufactured by International Devoe High Performance Coatings. Coating shall be applied per manufacturer's recommendation. The film thickness of the applied coating shall be 2.5 - 4.0 mils dry; 3.2 - 5.0 mils wet. 2. CERTIFICATION OF COMPLIANCE. Certificates of compliance shall be submitted for all items demonstrating compliance of materials with the specification requirements. The certificate(s) shall verify that the supplied material complies with the established standards for material and chemical properties for the material specified. Each certification shall be signed by an official authorized to certify on behalf of the manufacturing company and shall contain the name and address of the contractor, the contract number and the quantity and date(s) of shipment or delivery to which the certifications apply. 3. MATERIAL TEST REPORTS. Material Certification testing shall be performed and reports shall be submitted for all items supplied under the contract. The reports shall include a description of material, specifications, chemical properties and mechanical properties of the material used to manufacture the contract items. Information shall be included which renders the reports identifiable and traceable with the specific items provided under this contract.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Walter Staniszewski, 4123957278 USACE District, Pittsburgh
Documents
No documents available.
Lifecycle
Solicitation:
W911WN13T0014- Combined Synopsis
- Combined SynopsisCurrentJan 24, 2013
95--Structural Steel Shapes
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W911WN13T0014
Archive Date
Mar 25, 2013