GovChime
Notice ID: b2f44c6e7a8646946efcb7ef6e92a464Combined Synopsis/Solicitation

95--Structural Steel Shapes

Archived on March 25, 2013. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
6:00 AM UTC+01:00
Posted
January 24, 2013
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
332111: Iron and Steel Forging
Agency
Department of WarDepartment of the Army

Notice details

Office
W072 ENDIST PITTSBURGH
Place of performance
USACE District, Pittsburgh 1000 Liberty Avenue, W.S. Moorhead Federal Building, 22nd Floor Pittsburgh PA 15222-4186 US
PSC
95: METAL BARS, SHEETS, SHAPES
Last updated
Dec 5, 2025

Identifiers

Solicitation number
W911WN13T0014
Notice ID
b2f44c6e7a8646946efcb7ef6e92a464

Description

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. 1. SURFACE PREPARATION. ITEMS 1 THRU 16 to be abrasive blast and prime coated. ITEMS 1 thru 16 shall be abrasive blasted to a minimum Steel Structures Painting Council SSPC-SP6, Commercial Blast, per the Steel Structures Painting Council. The blast profile should be jagged rather than quote mark peened quote mark and between 1-1/2 to 2-1/2 mils. After blasting, vacuum or blow off all dust and ensure surface remains clean before painting. Then apply one coat of CATHO-COAT 302H ZINC PRIMER as manufactured by International Devoe High Performance Coatings. Coating shall be applied per manufacturer's recommendation. The film thickness of the applied coating shall be 2.5 - 4.0 mils dry; 3.2 - 5.0 mils wet. 2. CERTIFICATION OF COMPLIANCE. Certificates of compliance shall be submitted for all items demonstrating compliance of materials with the specification requirements. The certificate(s) shall verify that the supplied material complies with the established standards for material and chemical properties for the material specified. Each certification shall be signed by an official authorized to certify on behalf of the manufacturing company and shall contain the name and address of the contractor, the contract number and the quantity and date(s) of shipment or delivery to which the certifications apply. 3. MATERIAL TEST REPORTS. Material Certification testing shall be performed and reports shall be submitted for all items supplied under the contract. The reports shall include a description of material, specifications, chemical properties and mechanical properties of the material used to manufacture the contract items. Information shall be included which renders the reports identifiable and traceable with the specific items provided under this contract.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Walter Staniszewski, 4123957278 USACE District, Pittsburgh

Documents

No documents available.

Lifecycle

Solicitation:W911WN13T0014
  1. Combined Synopsis
  1. Combined SynopsisCurrentJan 24, 2013

    95--Structural Steel Shapes

    Notice b2f44c6e7a8646946efcb7ef6e92a464 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W911WN13T0014

Archive Date

Mar 25, 2013