GovChime
Notice ID: e79c7e2d6db64923b62d29cb914d4e4bPresolicitation

Stonewall Jackson Bridge Abutment Repair

Archived on August 27, 2020. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
Posted
August 13, 2020
Notice type
Presolicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W072 ENDIST PITTSBURGH
Place of performance
Weston, WV, 26452
Last updated
Apr 29, 2026

Identifiers

Solicitation number
W911WN20Q8002
Notice ID
e79c7e2d6db64923b62d29cb914d4e4b

Description

Stonewall Jackson Bridge Abutment Repair Synopsis The U.S. Army Corps of Engineers, Pittsburgh District, has a requirement for void filling and stocking of material at the Stonewall Jackson Dam, Weston, Lewis County, WV. The major features of the requirements are identified below: The overall contract scope of work requires void-filling beneath an existing bridge abutment using cementitious grout. Void is estimated at about 0.75 ft. high x 25 ft. x 25 ft. Void is accessible at ground surface through 0.75 ft. high gap which is about 10 ft. long. Provide means to confine newly placed grout to the void. Grout shall have a minimum strength of 3,000 psi at 28 days. Erosion and sedimentation controls will be required as a stream is beneath the bridge. There are Awardable Options included in this procurement and will consist of approximately 1020 cubic yards of rip rap; 440 cubic yard of filter layer stone; and 220 cubic yards of sand delivered to the Project Site and stockpiled. Period of Performance will be 120 calendar days after Notice to Proceed (NTP), if Options are awarded 30 days will be added to the Period of Performance. The estimated cost of the proposed work is $100,000.00 and $250,000.00. This acquisition will be will procured as a 100% Small Business Set-Aside. The resulting award will be for one (1) Firm-Fixed-Price (FFP) Contract. All responsible bidders are encouraged to participate. The Invitation for Bid (IFB) will be issued on or about June 18, 2020, online through beta.SAM (beta.sam.gov); therefore, requests for hardcopies of the solicitation will not be honored. Contractors MUST be registered in the System for Award Management (SAM) BEFORE SUBMITTING A BID ON THIS SOLICITATION (go to https://www.sam.gov to register). Please be aware that SAM requires a Notarized Statement as part of their registration and renewal process. This process could take more than ten (10) days. The NAICS for this procurement is 237310 Highway, Street, and Bridge Construction and the small business size standard is $39.5 Million. ATTENTION: For companies new to the Army Corps of Engineers, Pittsburgh District, the link below will take you to a training Powerpoint slide presentation which will provide information essential to new contractors to help them navigate our bidding process. It will also help them to make their bid-no bid decision as it contains information on what will be required on a Post- Award performance basis - submittals, timelines, deadlines & milestones, necessary paperwork you need to supply, etc. This will help you capture everything needed in your bid so that there are no surprises later on. This training is not mandatory to be considered qualified to bid; it is meant as a means to assist you in becoming better prepared to work with the Corps of Engineers, Pittsburgh District. You can access the training using the link below: http://www.lrp.usace.army.mil/Portals/72/docs/SmallBusiness/Solving%20the%20Mystery%20- Understanding%20USACE%20Pittsburgh%20Contracting%20Process.pptx You may give feedback on the training package to the District's small business specialist using the email address of LRP.SBO@usace.army.mil . ----------------------------------------- SOLICITATION posted. ---------------------------------------- 7/2/20: Amendment #0002 is the first and only amendment issued against this solicitation. Due to a system error, the Amendment was released as 0002 instead of 0001. ---------------------------------------- 7/7/20: Amendment #0004 is the second amendment issued against this solicitation. Due to a system error, the Amendment was released as 0004 instead of 0003. ---------------------------------------- 8/13/2020 NOTICE OF AWARD PURCHASE ORDER W911WN20P8003 HAS BEEN ISSUED TO GREGORI CONSTRUCTION INC. ON 8/12/2020 IN THE AMOUNT OF $234,567.00.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W911WN20Q8002
  1. Pre-Solicitation
  2. Awarded

Formal solicitation typically follows within 30–60 days. (estimate)

  1. 4×
    Pre-SolicitationJun 4, 2020

    Stonewall Jackson Bridge Abutment Repair

    Notice ffc3f34e55ee45e2bbc596e3c9bac837 on SAM.gov

  2. AwardedAug 13, 2020

    W911WN20P8003 Stonewall Jackson Bridge Abutment Repair

    Notice d6fcf0d6ac7d4a5bbd9fd07b8fbd4622 on SAM.gov

  3. Pre-SolicitationCurrentAug 13, 2020

    Stonewall Jackson Bridge Abutment Repair

    Notice e79c7e2d6db64923b62d29cb914d4e4b on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Paving Repairs, Bourne Bridge, Bourne, MA
86%
Solicitation01/22/2026
******************PLEASE MAKE NOTE THAT THIS SOLICITATION HAS BEEN CANCELLED AT THIS TIME AND WILL BE READVERTISED AT A LATER DATE********************* ********************PLEASE MAKE NOTE AMENDMENT 001 HAS BEEN ADDED*************** The U.S. Army Corps of Engineers, Philadelphia District, intends to award a firm fixed contract work that consists of the repair of the Reedy Point Bridge in Delaware City, Delaware. Contract work consists of the following: a. Repair of severely advanced deteriorated concrete substructure piers with large spalls, delaminated concrete, and exposed rebar. Repairs will include removal and replacement of these significantly deteriorated areas of concrete. b. Replacement of existing deteriorated sliding bearings with new elastomeric bearings. This will include jacking/temporarily supporting the steel beam. c. Miscellaneous steel repairs of deteriorated steel members including diaphragm replacement and strengthening of steel beam webs and flanges that is required due to deterioration. All areas where steel is repaired will be cleaned and painted. d. Joint replacement to prevent water intrusion to the steel and bearing areas below. The design plans and specifications will be prepared according to AASHTO bridge design and construction specifications. The period of performance for the base contract will be 540 calendar days. Estimated cost range of the project is $10,000,000 to $15,000,000,000. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation offerors must access the official U.S. government website for people who make, receive, and manage federal awards. The website is (https://sam.gov ). Additional questions may be emailed to the Contract Specialist at zaquette.everett@usace.army.mi
82%
Solicitation09/23/2022
The work shall be in strict compliance with the SOW, the project specifications, and the project drawings. Sections of the SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements will apply. All work will be coordinated with Base Operations. A Macomb County Soil Erosion Permit will be required for this project. The Contractor shall obtain, pay for, and follow the requirements of this permit. The work will consist of Construction of new 2 and 3 lane roads. The requirement includes full-depth pavement repairs, mill/overlay, crack repairs, and work along the entire Perimeter Road and Jefferson Ave. All work will be completed IAW drawings Repair Perimeter Rd VGLZ 182035. Installation of subsurface edge drainage for all new pavement sections. Localized grading of the project site to address current inadequate drainage. New paint and markings on all new pavements. The Contractor must maintain a constant flow of traffic during construction. Base perimeter road surfacing to be primarily of HMA Pavement. Existing base perimeter road distance to be resurfaced unofficially is 4.2 miles of primarily two and three lane road, with Jefferson Ave from Main Gate to Wilbur Wright Blvd. being three lanes. Those three lanes make up one mile of the projects 4.2 total miles. Contractor to remove and reinstall steel wedge barriers and jersey barriers throughout construction per the direction of SANGB Security Staff. Steel barriers to be reinstalled at grade to match pre-construction condition. Interested vendors should respond to this sources sought announcement through the Procurement Integrated Enterprise Environment (PIEE) solicitation module by providing a full capabilities statements, socio-economic status, applicable NAICS codes, prior experience in road construction and repair, past performance, government contract numbers for highway work, bonding status letter from financial institution, Please see Sources Sought Notice attached with this announcement. (See attachments for further information)
75%
Pre-SolicitationOpen
The work shall be in strict compliance with the SOW, the project specifications, and the project drawings. Sections of the SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements will apply. All work will be coordinated with Base Operations. A Macomb County Soil Erosion Permit will be required for this project. The Contractor shall obtain, pay for, and follow the requirements of this permit. The work will consist of Construction of new 2 and 3 lane roads. The requirement includes full-depth pavement repairs, mill/overlay, crack repairs, and work along the entire Perimeter Road and Jefferson Ave. All work will be completed IAW drawings Repair Perimeter Rd VGLZ 182035. Installation of subsurface edge drainage for all new pavement sections. Localized grading of the project site to address current inadequate drainage. New paint and markings on all new pavements. The Contractor must maintain a constant flow of traffic during construction. Base perimeter road surfacing to be primarily of HMA Pavement. Existing base perimeter road distance to be resurfaced unofficially is 4.2 miles of primarily two and three lane road, with Jefferson Ave from Main Gate to Wilbur Wright Blvd. being three lanes. Those three lanes make up one mile of the projects 4.2 total miles. Contractor to remove and reinstall steel wedge barriers and jersey barriers throughout construction per the direction of SANGB Security Staff. Steel barriers to be reinstalled at grade to match pre-construction condition. Interested vendors should respond to this sources sought announcement through the Procurement Integrated Enterprise Environment (PIEE) solicitation module by providing a full capabilities statements, socio-economic status, applicable NAICS codes, prior experience in road construction and repair, past performance, government contract numbers for highway work, bonding status letter from financial institution, Please see Sources Sought Notice attached with this announcement. (See attachments for further needed information)
71%
Market Research03/17/2026
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service-disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs. Interested businesses must submit the following by e-mail to CFLContracts@dot.gov (Attn: Laura Slauter) for receipt by close of business (2 p.m. local Denver time) on November 04, 2026. (1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor; (2) A list of all confirmed socioeconomic categories (i.e., 8(a), small-disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business; (3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $5 million, and your firm’s aggregate bonding capacity; and (4) Provide a list of road construction projects of equal or greater value and scope to the WY BR WYAO US20(1) US 20 and Hayden Arch Bridge Repairs project in which you performed reconstruction of the bridge approaches, minor drainage improvements, signing, and guardrail replacement. Bridge repairs include concrete spall, crack, delamination, and patch repairs in the bridge superstructure and deck. Installing a waterproofing membrane on the bridge deck and constructing a temporary debris shield underneath the bridge. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK. The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ PROJECT DESCRIPTION: The Hayden Arch Bridge is located on Hayden Arch Road approximately 5 miles west of Cody, WY. The bridge spans the Shoshone River at approximately 5,060 feet above sea level and provides access for the Bureau of Reclamation (BOR) to the Buffalo Bill Dam Power Plant. The PS&E includes one (1) base schedule with no options. SCOPE OF THE WORK: The project scope includes repairs of the Hayden Arch Bridge, reconstruction of the bridge approaches, minor drainage improvements, signing, and guardrail replacement. Bridge repairs include concrete spall, crack, delamination, and patch repairs in the bridge superstructure and deck. The scope also includes installing a waterproofing membrane on the bridge deck and constructing a temporary debris shield underneath the bridge. The bridge will be closed to public traffic for the duration of construction. PRINCIPAL WORK ITEMS: 15701-0000 Soil Erosion Control: LPSM 30202-2000 Roadway Aggregate, Method 2: 310 TONS 40301-0100 Asphalt Concrete Pavement, Type 1: 350 TONS 55901-0000 Membrane Waterproofing: 445 SQYD 56205-0000 Debris Shield: LPSM 57201-0000 Repair Concrete (Deep): 38 SQYD 57201-0000 Repair Concrete (Deep Bridge Deck): 80 SQYD 57201-0000 Repair Concrete (Full Depth Bridge Deck): 80 SQYD 60901-1000 Curb, Concrete, 12-Inch Depth: 520 LNFT 61701-4500 Guardrail System Mgs, Type 2, Class A, Steel Posts: 263 LNFT ANTICIPATED SCHEDULE: Advertisement: January 2027 Award: March 2027 Notice to proceed: April 2027 Contract completion: October 2027 Total duration for construction: 120 days ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000.
69%
Market Research11/04/2026

Additional Details

Solicitation Number

W911WN20Q8002

Archive Date

Aug 27, 2020

Office Address

PITTSBURGH, PA, 15222-4198