GovChime
Notice ID: 96d055300cec46509b6dd8edbf77451cSolicitation

Permanent Culvert Improvements Project at Allegheny River Lock and Dam 4

Archived on July 23, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:00 AM UTC−04:00
Posted
August 3, 2023
Notice type
Solicitation
Set-aside
SBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W072 ENDIST PITTSBURGH
Place of performance
PA, 15065
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W911WN23B8000
Notice ID
96d055300cec46509b6dd8edbf77451c

Description

The US Army Corps of Engineers, Pittsburgh District, has a requirement that involves permanently relocating an enclosed stream on Government property to ultimately travel via gravity through the penstock of the lock land wall and into the Allegheny River, as well as associated decommissioning and/or restoration efforts pertaining to a variety of features to varying degrees. The Allegheny River Lock and Dam No. 4 Permanent Culvert Improvements Project (Project)generally involves the following:? Provide a three-foot (height) by four-foot (width) reinforced concrete box culvert and connect to each an existing junction box and the existing vault of the lock land wall, via open trench and/or shored construction, to permanently relocate the corresponding stream through these features and into the lock land wall penstock, while providing various lock land wall structural counterweight measures;? Decommission various features to varying degrees (i.e. remove and dispose off-site, remove and turn over to the Government, grout fill and abandon in-place, etc.) including but not limited to 36-inch diameter vitrified clay pipe culverts, temporary diversion of water system, various stormwater features, junctions, and various concrete pavement structures;? Restore and/or install various features to varying degrees including but not limited to stormwater features (i.e. culverts, junction boxes, yard inlets, roof downspouts, etc.), concrete pavement structures (i.e. driveways, curbs and gutters, esplanade, sidewalk, etc.), and fences;? Install cured-in-place pipe (CIPP) lining of 36-inch diameter vitrified clay pipe culverts;? Execute work associated with each the lock land wall vault hatch cover plate support system (including providing new support brackets, new recessed ledge angle, new angle brackets, etc.), part of the esplanade electrical utility trench (remove and replace, and maintain utilities during construction), and part of the esplanade trench drain (remove and replace);? Execute various measures to facilitate work including traffic control, diversion of water, erosion and sedimentation control, and others. The contractor will be required to furnish all materials proposed for installation, and will be responsible for properly stockpiling, disposing, or recycling, as appropriate, respective items removed. Removed items deemed for disposal or recycling are to be taken to commercially permitted facilities licensed to accept the same, as applicable. Allegheny River Lock No. 4 will remain in operation while work is being completed, however, the Government will permit temporary scheduled lock closures in accordance with the contract specifications. The contractor will be required to adhere to USACE Construction Quality Management concepts and procedures. The IFB Package contains the solicitation and four (4) Attachments. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W911WN23B8000
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationJun 7, 2023

    Permanent Culvert Improvements at Allegheny River Lock and Dam No. 4

    Notice ea051242325d4e5da6bf80b247d3709d on SAM.gov

  2. 5×
    SolicitationCurrentJun 26, 2023

    Permanent Culvert Improvements Project at Allegheny River Lock and Dam 4

    Notice 96d055300cec46509b6dd8edbf77451c on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W911WN23B8000

Archive Date

Jul 23, 2024

Office Address

PITTSBURGH, PA, 15222-4198