GovChime
Notice ID: 31070a81891949f2a66968d50e46a76eSolicitation

Marshall Township West View Water Authority Water Main Extension Project

Archived on September 18, 2023. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:00 AM UTC−05:00
Posted
September 18, 2023
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237110: Water and Sewer Line and Related Structures Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W072 ENDIST PITTSBURGH
Place of performance
Sewickley, 15143
Last updated
Dec 6, 2025

Identifiers

Solicitation number
W911WN23B8002
Notice ID
31070a81891949f2a66968d50e46a76e

Description

The U.S. Army Corps of Engineers, Pittsburgh District, has entered into a Project Partnership Agreement with the West View Water Authority to complete installation of potable water mains within state and county rights-of-way, in Marshall Township, Allegheny County, Pennsylvania. More specifically, the work areas are located along Warrendale-Bayne Road (S.R.4052) between Innovation Drive and Wheatland Road, Mingo Road (S.R. 4051) between Neely School Road and Warrendale Bayne Road, and Brush Creek Road (C.R. 1052) between Warrendale Bayne Road and Ericsson Drive. Major features of work for this contract will include installation of 13,100-linear feet of 16-inch diameter water main by the open trench, and jack and bore methods, pressure and disinfection testing of water mains, traffic control, asphalt base, binder, and wearing courses replacements, and pavement markings. Excavated material not used as backfill material will be disposed of at a properly permitted facility. *Visit https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911WN23B8002 to obtain more details. AMENDMENT 0003 POSTED TO PIEE.GOV *Visit https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911WN23B8002 to obtain more details. 5 January 2023: Bid opening held virtually at 11:00 ET, attendance register and bid results attached.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W911WN23B8002
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationNov 8, 2022

    Marshall Township West View Water Authority Water Main Extension Project

    Notice fa6bf3709adc411081d74c1d6e708c96 on SAM.gov

  2. 7×
    SolicitationNov 22, 2022

    Marshall Township West View Water Authority Water Main Extension Project

    Notice 092123b9ee2d421ab46bf83599e50c63 on SAM.gov

  3. AwardedMar 6, 2023

    Marshall Township West View Water Authority Water Main Extension Project

    Notice ee86646b818347f6a53034e12bbe990e on SAM.gov

  4. 2×
    SolicitationCurrentSep 18, 2023

    Marshall Township West View Water Authority Water Main Extension Project

    Notice 31070a81891949f2a66968d50e46a76e on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W911WN23B8002

Archive Date

Sep 18, 2023

Office Address

PITTSBURGH, PA, 15222-4198