GovChime
Notice ID: 9cf0cdfe54d046edac18eee369646aecSolicitation

Fish Reefs Project, Lower Monongahela River, Elizabeth/Monessen, Pennsylvania

Archived on September 18, 2023. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:00 AM UTC−04:00
Posted
September 18, 2023
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W072 ENDIST PITTSBURGH
Place of performance
PA
Last updated
Dec 6, 2025

Identifiers

Solicitation number
W911WN23B8003
Notice ID
9cf0cdfe54d046edac18eee369646aec

Description

The US Army Corps of Engineers, Pittsburgh District, has a requirement to install 73 fish reefs in 5 separate segments within the Monongahela River Pools 2 and 3, Lower Mon River, Elizabeth/Monessen, Allegheny County, PA. Specific features of work under the contract mentioned in this description do not represent a construction sequence. The contract features of work include, but are not limited to the following: (a) Contractor to perform a preconstruction survey of each segment prior to commencement of work to assess and adjust the proposed fish reef dimensions in the summary tables provided on Contract drawings C-101 through C-105 based on any changes to the existing riverbed base file. The existing base file was developed from bathymetric survey data collected in 2016. It is acceptable for the Contractor to conduct one survey for the entire project or a survey prior to the start of construction at each segment. Government review and approval of the preconstruction survey data will also be required prior to the start of construction (Section 01 32 23.00 08 SURVEY AND ALIGNMENT CONTROL). (b) Contractor shall install the 73 fish reefs within the five segments in the locations and to the tolerances shown on the Contract drawings. There is one segment in Pool 2 and four segments within Pool 3. The Contractor will need to perform all work via floating plant.(Drawing G-004, C-101 through C-105, and C-401, Section 35 31 19 RIVERINE STRUCTURES). (c) Contractor to perform check surveys of each reef prior to acceptance and payment as outlined in 01 32 23.00 08. A postconstruction bathymetric survey of all segments will be completed after installation of all reefs. Payment is not contingent on the results of the final postconstruction survey. (Section 01 32 23.00 08 SURVEY AND ALIGNMENT CONTROL). The IFB Package contains the solicitation and three (3) Attachments. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/then clicking on View FFP Contract Changes Playbook Here.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W911WN23B8003
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationFeb 7, 2023

    Fish Reefs Project, Monongahela River, PA

    Notice dcbac46d8d064d15a9c5fba4b5b77b0c on SAM.gov

  2. 5×
    SolicitationCurrentMar 9, 2023

    Fish Reefs Project, Lower Monongahela River, Elizabeth/Monessen, Pennsylvania

    Notice 9cf0cdfe54d046edac18eee369646aec on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Amendment 0001 issued on July 20, 2022 Amendment 0002 issued on August 09, 2022 Amendment 0003 issued on August 22, 2022 Amendment 0004 issued on August 26, 2022 Abstract of Bids issued on August 30, 2022 Lower Wicomico River Maintenance Dredging at Wicomico County, MD This proposed procurement is a Competitive Invitation for Bid (IFB); NAICS 237990 “Other Heavy and Civil Engineering Construction” with a size standard of $39,500,000.00. Total 100% Small Business Set-aside. This project is to include the hydraulic dredging the lower half of the Wicomico River to its authorized depth of 14 feet (plus one foot of allowable over depth). Approximately 120,000 cubic yards of silty material, with small pockets of sandy material, are to be dredged. Placement of material via pipeline will be utilized. Pipeline distance will be, on average, 8 miles, with a maximum pumping distance of 14 miles. The pipeline will travel through the Wicomico River and over land (approximately 4 miles) to reach the placement site. The pipeline will be placed atop the existing berm at the WMA impoundment and a diffuser shall be used at multiple locations to place the material at a lower velocity into the placement site. The outflow of the pipeline shall be moved across the project placement areas to achieve the desired elevation. As such, careful attention to the prescribed elevation in placing the material is critical to the success of the project. Approximately 70 acres of land will be restored. Due to the location of the placement site being surrounded by water and the WMA impoundment, minimal land access is available with little to no access for heavy equipment from the land side of the project placement site. Wetland restoration is meant to increase migratory bird nesting habitat. To ensure the restoration goals are met the placement location shall also include placing straw bales as natural containment around the southern end of the placement site. The straw bales are to act as containment for dredged material placed for wetland restoration and increasing migratory bird nesting habitat. Approximately 11,000 strawbales will be used stacked two high with an additional single stacked row at the interior of the placement site to provide proper containment of the dredged material. Tidal ditch plugs shall be constructed in areas of high erosion or open water. Approximately 20 ditch plugs of varying size are to be constructed. After dredged material placement, vegetation will be planted to restore the wetland. Planting of vegetation will occur over the two growing seasons post dredged material placement. Vegetation will be Spartina patens and Distichlis spicata, and possibly a smaller amount of Panicum. Vegetation the first growing season may require aerial seeding, based on consolidation of the dredged material. Vegetation the first growing season shall also require the exterior edge only to be hand planted to provide stabilization, with interior planting occurring the second growing season once material has consolidated.
84%
Solicitation08/30/2022
EFFECTIVE APRIL 4, 2023: The government has attached the Bid Opening Results (please refer to the"Attachments" Section of this Notice). ****************************************************************************************************************************************************** VIRTUAL BID OPENING INFORMATION: THE VIRTUAL BID OPENING WILL BE CONDUCTED ON APRIL 4, 2023 AT 2:00 P.M. (CENTRAL TIME). AT THE DESIGNATED DAY AND TIME, PLEASE JOIN BY: MEETING LINK: https://usace1.webex.com/usace1/j.php?MTID=m5562782dd074c15ee45044deb827dad5 Meeting number (access code): 2761 926 4942 Meeting password: HypVGR2Z@67 OR, JOIN BY PHONE: 1-844-800-2712 US Toll Free 1-669-234-1177 US Toll Access code: 2761 926 4942 Conf ID: press the # sign TIME OF SUBMISSION: Bids are required one hour prior the time specified on Page 1 of this Solicitation, Block #13a. Please note, FAR Subpart 14.302 Bid submission; “Bids shall be submitted so that they will be received in the office designated in the invitation for bids not later than the exact time set for opening of bids.” ************************************************************************************************************************************************** EFFECTIVE MARCH 30, 2023: The government has posted Amendment No. 0005 hereunder this Notice (please refer to the Attachments Section). ************************************************************************************************************************************************** EFFECTIVE MARCH 28, 2023: The government has attached the attendance sheet from the Pre-Bid Meeting held on March 23, 2023 (please refer to the "Attachments" Section of this Notice). ************************************************************************************************************************************************** EFFECTIVE MARCH 20, 2023: The government has posted Amendment No. 0004 hereunder this Notice (please refer to the Attachments Section). ************************************************************************************************************************************************** EFFECTIVE MARCH 20, 2023: The government has posted Amendment No. 0003 hereunder this Notice (please refer to the Attachments Section). ************************************************************************************************************************************************** ATTENTION TO BIDDERS ****************************************PRE-BID MEETING & PROJECT SITE VISIT MARCH 23, 2023************************************ A pre?bid meeting and project site visit is scheduled for Thursday, March 23, 2023 at 1:00 p.m. (Central Time). Interested contractors are to meet at location: E. Banta Court (Cul de Sac, under College Ave. Bridge), Appleton, Wisconsin 54915. ****************************************PRE-BID MEETING & PROJECT SITE VISIT MARCH 23, 2023************************************ EFFECTIVE MARCH 1, 2023: The government has posted Amendment No. 0002 hereunder this Notice (please refer to the Attachments Section). ************************************************************************************************************************************************** EFFECTIVE FEBRUARY 22, 2023: The government has posted Amendment No. 0001 hereunder this Notice (please refer to the Attachments Section). ************************************************************************************************************************************************** NOTICE TO BIDDERS (FEBRUARY 21, 2023): Please be advised an amendment is forthcoming to provide a new ProjNet bidder inquiry key, which is planned for issuance on February 22, 2023. ***************************************************************************************************************************************************** Under this Solicitation Notice, the United States Army Corps of Engineers - Chicago District issues Solicitation No. W912P623B0004 for bidding purposes. Therefore, provided hereunder is the relevant bid package for the construction project entitled, "Appleton Lower Dam Gates 1-5 Replacement in Outagamie County, Appleton, Wisconsin on the Fox River." PROJECT INFORMATION: This project will include the replacement of tainter gates 1-5 at Appleton Lower Dam. The exisiting will be removed and newly fabricated gates installed. CONTRACTING OFFICE: USACE Chicago District, 231 SOUTH LaSALLE STREET, SUITE 1500, Chicago, IL 60604 ACQUISITION INFORMATION: Competition for this acquisition is RESERVED EXCLUSIVELY for Small Business Concerns. The North American Industry System Classification Code is 237990, with a small business size standard in dollars of $39.5 Million. The magnitude of cost for construction is estimated between $1,000,000.00 and $5,000,000.00. The Solicitation (Invitation for Bids –“IFB”) is downloadable from the INTERNET ONLY. The project specification files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Responses to this Solicitation (Invitation for Bids) are due by 2:00 p.m. (Central Time) on March 14, 2023. IN THE CASE OF A DISCREPANCY BETWEEN THE DATES PUBLISHED IN THIS NOTICE AND THOSE CALLED OUT IN THE IFB DOCUMENT, THE DATES IN THE IFB DOCUMENT OVERRIDES THOSE PUBLISHED HEREIN THIS NOTICE; THIS IS RELATIVE TO THE IFB ISSUANCE DATE AND THE DUE DATE FOR BIDS. IMPORTANT POLICY: Bidders are REQUIRED to be registered in the System for Award Management (SAM) AT THE TIME ITS BID IS SUBMITTED to comply with the annual representations and certifications requirements. Registration can be completed free of charge at www.sam.gov. Request for solicitation packages made by telephone, fax or e-mail will not be honored. The Point of Contact for this acquisition is Ericka Hillard at (312) 846-5378, or via email: ericka.d.hillard@usace.army.mil. ** Please include Solicitation Number W912P623B0004 on all correspondence
79%
Solicitation04/04/2023
This Pre-Solicitation Notice is being issued by the United States Army Corps of Engineers - Chicago District to inform interested/potential contractors of the District's imminent issue of an Invitation for Bid Package for its construction project entitled, "Appleton Lower Dam Gates 1-5 Replacement in Outagamie County, Appleton, Wisconsin on the Fox River." PROJECT INFORMATION: This project will include the replacement of tainter gates 1-5 at Appleton Lower Dam. The exisiting will be removed and newly fabricated gates installed. CONTRACTING OFFICE: USACE Chicago District, 231 SOUTH LaSALLE STREET, SUITE 1500, Chicago, IL 60604 ACQUISITION INFORMATION: Competition for this acquisition is RESERVED EXCLUSIVELY for Small Business Concerns. The North American Industry System Classification Code is 237990, with a small business size standard in dollars of $39.5 Million. The magnitude of cost for construction is estimated between $1,000,000.00 and $5,000,000.00. The Solicitation (Invitation for Bids –“IFB”) will be downloadable from the INTERNET ONLY. The project specification files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Once the package is released into advertisement at this website ("System for Award Management"), interested bidders may download the full package, includes: specification and drawings files. The Solicitation package is planned for advertisement on or about February 10, 2023, with bids due on or about March 14, 2023. IN THE CASE OF A DISCREPANCY BETWEEN THE DATES PUBLISHED IN THIS NOTICE AND THOSE CALLED OUT IN THE IFB DOCUMENT, THE DATES IN THE IFB DOCUMENT OVERRIDES THOSE PUBLISHED HEREIN THIS NOTICE; THIS IS RELATIVE TO THE IFB ISSUANCE DATE AND THE DUE DATE FOR BIDS. IMPORTANT POLICY: Bidders are REQUIRED to be registered in the System for Award Management (SAM) AT THE TIME ITS BID IS SUBMITTED to comply with the annual representations and certifications requirements. Registration can be completed free of charge at www.sam.gov. Request for solicitation packages made by telephone, fax or e-mail will not be honored. The Point of Contact for this acquisition is Ericka Hillard at (312) 846-5378, or via email: ericka.d.hillard@usace.army.mil. ** Please include Solicitation Number W912P623B0004 on all correspondence. **
79%
Pre-Solicitation03/14/2023
The project is located along the right descending bank of Lake Sharpe near the Lower Brule, SD town site. Lower Brule North Element 2 includes a 100-foot-wide riparian planting bench, a gravel maintenance path along the entire reach, a riprap revetment to protect the shoreline and island from erosion, and the creation of a 200-by-1,500-foot island constructed in water up to three feet deep. The sheltered open water area between the island and the shoreline will develop into approximately 5.17 acres of emergent wetland, and this will also create approximately 32 acres of riparian habitat. Related tasks include earth moving, grading, bank shaping, rock installation, water management, fill, and topsoil placement.
75%
Solicitation12/03/2026
On or about 23 October 2026, the Government intends to issue the Invitation for Bid (IFB) for LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2. The IFB will close on or about 3 December 2026. This is a 100% Small Business Set-Aside. Sit Visit: A Site Visit is scheduled for 3 November 2026. Additional information regarding the site visit will be provided in the solicitation in Section 00 21 00. Project Description: Element 2 of the project includes the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path along the entire reach, and the creation of a 200-by-1,500-foot island within Reach 4 of the lake, in water up to three feet deep. The island will be planted with cottonwood trees and other culturally significant vegetation. To protect the lakeward side of the island from wind, wave action, and ice erosion, a riprap revetment will be installed. The sheltered open water area between the island and the shoreline is anticipated to naturally evolve into approximately 5.17 acres of emergent wetland. Additionally, this measure will result in the creation of roughly 32 acres of riparian habitat. DO NOT submit requests for plans and specifications. See Obtaining Solicitation Documents below. Completion Date: The Contractor will be required to commence work upon receipt of contract award and complete the work 550 days after receipt of Notice to Proceed. This is subject to change after IFB issuance. Provisions will be included for liquidated damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required. Estimated Construction Costs: The estimated construction cost of this project is between $10,000,000 and $25,000,000. NAICS Code: The Primary North American Industry Classification System (NAICS) code anticipated for solicitation is 237990, Heavy and Other Civil Engineering Construction, with a size standard for Small Business of $45M. All contractors must be registered and have an active and verified account in the System for Award Management (SAM) in order to receive a contract award from any DoD activity. Contractors may access the Internet site at: https://www.sam.gov/ to register and/or obtain information about the SAM program. Contractors must ensure that the applicable NAICS listed above is included in their profile prior to submission of offer. Contracting Officer Address: USACE Omaha District 1616 capital Ave Omaha, NE 68102-4901 Point Of Contact: All questions shall be submitted on ProjNet. ProjNet access, and additional guidance, will be given at time of issuance of the IFB Solicitation. Place of performance: Big Bend, Lower Brule, South Dakota 57548 Bid Submissions: BID SUBMISSION REQUIREMENTS HAVE CHANGED AND WILL NO LONGER BE ACCOMPLISHED VIA EMAIL. Contractors shall submit their bids via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module no later than 1 hour before the date and time established in Block 13 of the Standard Form (SF) 1442, or Block 14 of the most recently issued SF 30 as applicable: **It is recommended that contractors create their PIEE Solicitation Module account as soon as possible and not wait till bid due date, as access may take time. The following information is provided for reference. Step 1: Complete vendor registration on https://piee.eb.mil/.Instructions for registration can be found through: https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdfStep 2: Upload offer in the Solicitation Module through https://piee.eb.mil/. Instructions for uploading an offer can be found through: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtmlDo not assume submission will be instantaneous. File size and number of files submitted shall be considered. Contractors should allow adequate time for submission completion because the entire bid must be received by the due date and time specified in Block 13 of SF 1442, or SF 30 as applicable. Bids received after the date and time stated within Block 13 of the SF 1442 or Block 14 of the most recent SF 30, as applicable, will be considered late and will not be considered for award. To avoid rejection of a bid, the bidder must ensure the submission is virus-free. The government will follow FAR 14.406 if a bid is unreadable. Part 15 is not applicable to this acquisition. Do not assume submission will be instantaneous. File size and number of files submitted shall be considered. Bidder/Teammate/Subcontractors should allow adequate time for submission completion because the entire bid (i.e. bidders submission and all teammate/subcontractor(s) independent submissions) must be received by the bid due date and time specified in Block 13 of SF 1442, or SF 30 as applicable. Obtaining Solicitation Documents: Solicitation documents will be posted in the PIEE Solicitation Module. A link to the solicitation documents on https://piee.eb.mil will be available on SAM.gov. The links below provide resources for accessing the PIEE Solicitation Module. Web Based Training for the PIEE Solicitation Module - https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml Department of Defense Procurement Toolbox - https://dodprocurementtoolbox.com/site-pages/solicitation-module Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database http://www.sam.gov/ exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. PHONE CALLS WILL NOT BE ACCEPTED.
75%
Pre-SolicitationOpen

Additional Details

Solicitation Number

W911WN23B8003

Archive Date

Sep 18, 2023

Office Address

PITTSBURGH, PA, 15222-4198