GovChime
Notice ID: df68593433f94a6881a6f8789502126aSolicitation

Hydraulic System Replacement, Pike Island Locks and Dam

Archived on September 18, 2023. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:00 AM UTC−05:00
Posted
December 15, 2022
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W072 ENDIST PITTSBURGH
Place of performance
Wheeling, 26003
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W911WN23B8005
Notice ID
df68593433f94a6881a6f8789502126a

Description

BID OPENING HELD THURSDAY, 15 DECEMBER, 2022 AT 11:00PM EST. Bid Opening Results and Attendance Sheet are attached. UPDATE: 12 December 2022 - Amendment 0002 is now posted. The Invivitation for Bid deadline is not extended. Please see attached Amendment 0002 and Attachments 07-12 for details. Amendment 0001, original IFB, and Attachments 01-06 are also uploaded. Amendment 0001, original IFB, and Attachments 01-06 had been previously posted to PIEE only. UPDATE: 30 November 2022 - Documents from Site Visit on 30 November 2022 In-Person Site Visit added, to include Agenda and Site Visit Sign-In Sheet. Bid due date and time remain unchanged. UPDATE: 23 November 2022 - Documents from Site Visit on 23 November 2022 In-Person Site Visit added, to include Agenda, Contracting Discuss, Site Visit Sign-In Sheet, and U.S. Department of Labor Resources. Bid due date and time remain unchanged. The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves the replacement of the central hydraulic system for the Main and Auxiliary Lock Chambers at Pike Island Locks and Dam, Ohio River, West Virginia. The contract will include a new four-corner hydraulic system for each lock chamber consisting of Hydraulic Power Units (HPUs) for the miter gates and culvert filling/emptying valves. The new HPUs shall be located in new precast buildings at the following locations: ?Two (2) HPUs on the river wall; one upstream and one downstream for operation of the Main Chamber culvert valves and miter gates. ?Two (2) HPUs on the middle wall; one upstream and one downstream for operation of Main Chamber culvert valves and miter gates. In addition, the two HPUs on the middle wall are for operation of the Auxiliary Chamber miter gates. The modified four-corner system reduces the number of HPUs on the middle wall from four to two. ?Two (2) HPUs on the land wall; one upstream and one downstream for operation of the Auxiliary Chamber culvert valves and miter gates. The contract specifically includes: a.Installation of new power, control, and fiber optic cables for the six (6) HPUs. Includes modifying the existing control stations in each control shelter for the addition of the new HPUs and miter gate controls. Includes installation of a new operator control station in the middle wall Operations Building. b. Furnishing and installation of six (6) HPUs, stainless steel hydraulic piping, and hydraulic oil. c. Furnishing and installation of six (6) precast buildings which includes raised concrete pads, power distribution equipment, associated electronics and hardware, and new utility trench covers in various areas of the lock. d. Furnishing and installation of new Motor Control Center (MCC) distribution equipment. e. Demolition and disposal of existing central hydraulic system located in the middle wall Operations Building. This includes all motors, pumps, reservoir, filters, associated piping, and proper disposal of hydraulic oil. f. Demolition and removal of all existing central hydraulic oil lines on the river, middle, and land walls. This includes all lines for pressure and return to each miter gate and culvert valve cylinder. Removal and proper disposal of hydraulic oil and components will be required. Removal and proper disposal of electrical equipment will be required. Ferrous and all other construction waste material will be disposed of at commercially permitted facilities licensed to accept waste or recyclable materials as applicable. Construction work will occur in close proximity to waterway traffic and operating lock and dam gates. The existing lock chambers and dams are currently operated and staffed by Government personnel 24 hours a day 365 days of the year. Lock closures for installation and testing of new equipment will be required to be minimal and at the approval of Government. *Visit the following site for further details and Bid Submission: https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911WN23B8005

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

Solicitation:W911WN23B8005
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationOct 27, 2022

    Hydraulic System Replacement, Pike Island Locks and Dam

    Notice b4865b28c6144f4ba44b2a6d868f7280 on SAM.gov

  2. 10×
    SolicitationCurrentNov 15, 2022

    Hydraulic System Replacement, Pike Island Locks and Dam

    Notice df68593433f94a6881a6f8789502126a on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Dashields Locks and Dam Install 4 Corner Hydraulics Dashields Locks and Dam, Coraopolis, PennsylvaniaThe Dashields hydraulic system upgrade consists of demolition and removal of the existing hydraulic system and its related components, and installation of a new hydraulic system with supporting controls and buildings.Primary hydraulic system components to be demolished and removed are motors, pumps, reservoir, filters, filter housings, piping and pipe hangers, hydraulic fluid, valves, and manifolds. Any hydraulic piping that is embedded in concrete must be drained, cut flush with the concrete surface, capped or plugged, and abandoned in place. Nine (9) new hydraulic cylinders must be furnished by the contractor and five (5) will be furnished by the government. Electrical demolition work must include but not be limited to removal of specified buckets, cabinet doors, junction boxes, levers, buttons, indicators, limit switches, wiring, and hardware. Some concrete demolition work must be required for placement of new buildings and routing of new electrical cable and mechanical pipe.Three (3) new hydraulic power units (HPUs) must be furnished and installed on the land and middle lock walls inside two new 2-story HPU buildings at locations specified on the contract drawings. The fourth HPU will be furnished and installed on an elevated platform in the river wall at the location specified in the contract drawings. The HPU buildings and elevated platform must be designed and constructed by the contractor in accordance with the performance specification and the concept drawings included in the contract drawings. The HPUs must send hydraulic power to the existing hydraulic cylinders by means of new stainless-steel piping and new manifold mounted hydraulic components.The new hydraulic equipment must be operated by new electronic controls that will be installed inside new panels and new control consoles. The new control panels must be installed on each HPU with an additional control panel inside of the middle wall operations building. The new control consoles must be installed inside three existing and one new 1-story control shelter at locations specified in the contract drawings. The control shelter must be designed and constructed by the contractor in accordance with the performance specification and the concept drawings included in the contractdrawings.New buckets and supporting equipment must be installed inside existing motor control centers (MCCs). New hardware and power and control cabling must be installed as specified and as required for operation of the new electrical/mechanical equipment. Some concrete installation work must be required for placement of new buildings and routing of new electrical cable and mechanical pipe. A geotechnical and civil site analysis must be completed to confirm the structural integrity of all foundations for all new project components and to confirm proper drainage. Minimal new steel grating must be required for placement over top new concrete utility trenches. All new hydraulic and controls equipment must be tested and commissioned prior to project handoff. This project is to be completed at a locks and dam site along the Ohio River and thus requires the use of a floating work plant and work boat(s) for construction. Also, all as-built drawings must be stamped by a registered PE.The work shall be completed within 730 after written Notice to Proceed.The acquisition will be procured as 100% Set-Aside for Small Business. The resulting award will be for one (1) Firm-Fixed-Price (FFP) Contract. All responsible Offerors are encouraged to participate. The Request for Proposal (RFP) will be issued on or about 18 June 2026, online through Procurement Integrated Enterprise Environment (PIEE) which posts the opportunity to SAM.gov; therefore, requests for hardcopies of the solicitation will not be honored.The North American Industrial Classification System (NAICS) Code for this acquisition is 237990 - 0ther Heavy and Civil Engineering Construction.The Small Business Size Standard for this NAICS Code is $45,000,000.00.In order to submit an Offer on this project, your company must-1) Be registered in System for Award Management (SAM) and maintain an active registration status. 2) Be registered in the Procurement Integrated Enterprise Environment (PIEE) for the Solicitation Module with the PROPOSAL MANAGER Manger role. System for Award Management (SAM) RegistrationRegistering in SAM.gov includes both entity validation and entity registration.To register in SAM:a. Navigate to SAM.govb. Select Sign-In (top right)c. Select Create an Account then Follow the Instructions. d. After Account is Set-up, Select Sign In.e. Under the Entity Management widget, Select Get Started button. f. Select Register Entity. As part of entity registration, a Unique Entity ID will be assigned.For Additional Information on SAMTo Register Your Entity (company), please visit https:/www.fsd.gov/gsafsd_sp?id=gsa_index . Here you will find the following, Get Started with Your Registration Check Registration Status ACTIVE, INACTIVE, PENDING Update Your Registration Become an Entity Administrator Validate Your Entity *Access User Guides *By selecting this option, you can obtain a Quick Start Guide for Contract Registrations.Also, here you will find in addition to the User Guides - FAQs, Videos, and Definitions.PLEASE NOTEIt is mandatory that all companies be registered in SAM in order to receive federal contracts.There is no charge to register or maintain your company (entity) registration.Login.gov manages usernames and passwords for SAM.gov. *Important* Registration InformationRegistration can take at least ten (10) business days to be active in SAM.gov.Registration must be in active status upon offer submission and remain active during award period.Registration must be renewed every 365 days to remain active.The Federal Service Desk (FSD) for SAM questions, may be contacted. Phone Number: 866-606-8220Hours of Operation: Monday-Friday 8 a.m. to 8 p.m. ETProcurement Integrated Enterprise Environment (PIEE) Solicitation Module RegistrationTo register for PIEE follow the below instructions. Register in PIEE:a. Navigate to https://piee.eb.mil/b. Select Register [top right]c. Select Vendord. Create a User ID and Password and follow the prompts [next]e. Create Security Questions [next]f. Complete your User Profile Information [next]g. Complete your Supervisor or Approving Official Information [next]h. Complete Rolesi. Step 1. Select SOL-Solicitationii. Step 2. Select Proposal Manageriii. Step 3. Click Add Rolesiv. Step 4. Fill in your Location Code (CAGE Code) [next]i. Provide a justification for your registration [next]j. Follow the remaining prompts to submit your registrationThe Procurement Integrated Enterprise Environment (PIEE) help desk may be reached by calling telephone number 866-618-5988 for assistance. 30 June 2026 - Amendment 0001 issued. 23 July 2026 - Amendment 0002 Issued 31 July 2026 - Amendment 0003 issued. 13 August 2026 - Amendment 0004 issued.
98%
Solicitation08/20/2026
Dashields Locks and Dam Install 4 Corner Hydraulics Dashields Locks and Dam, Coraopolis, PennsylvaniaThe Dashields hydraulic system upgrade consists of demolition and removal of the existing hydraulic system and its related components, and installation of a new hydraulic system with supporting controls and buildings.Primary hydraulic system components to be demolished and removed are motors, pumps, reservoir, filters, filter housings, piping and pipe hangers, hydraulic fluid, valves, and manifolds. Any hydraulic piping that is embedded in concrete must be drained, cut flush with the concrete surface, capped or plugged, and abandoned in place. Nine (9) new hydraulic cylinders must be furnished by the contractor and five (5) will be furnished by the government. Electrical demolition work must include but not be limited to removal of specified buckets, cabinet doors, junction boxes, levers, buttons, indicators, limit switches, wiring, and hardware. Some concrete demolition work must be required for placement of new buildings and routing of new electrical cable and mechanical pipe.Three (3) new hydraulic power units (HPUs) must be furnished and installed on the land and middle lock walls inside two new 2-story HPU buildings at locations specified on the contract drawings. The fourth HPU will be furnished and installed on an elevated platform in the river wall at the location specified in the contract drawings. The HPU buildings and elevated platform must be designed and constructed by the contractor in accordance with the performance specification and the concept drawings included in the contract drawings. The HPUs must send hydraulic power to the existing hydraulic cylinders by means of new stainless-steel piping and new manifold mounted hydraulic components.The new hydraulic equipment must be operated by new electronic controls that will be installed inside new panels and new control consoles. The new control panels must be installed on each HPU with an additional control panel inside of the middle wall operations building. The new control consoles must be installed inside three existing and one new 1-story control shelter at locations specified in the contract drawings. The control shelter must be designed and constructed by the contractor in accordance with the performance specification and the concept drawings included in the contractdrawings.New buckets and supporting equipment must be installed inside existing motor control centers (MCCs). New hardware and power and control cabling must be installed as specified and as required for operation of the new electrical/mechanical equipment. Some concrete installation work must be required for placement of new buildings and routing of new electrical cable and mechanical pipe. A geotechnical and civil site analysis must be completed to confirm the structural integrity of all foundations for all new project components and to confirm proper drainage. Minimal new steel grating must be required for placement over top new concrete utility trenches. All new hydraulic and controls equipment must be tested and commissioned prior to project handoff. This project is to be completed at a locks and dam site along the Ohio River and thus requires the use of a floating work plant and work boat(s) for construction. Also, all as-built drawings must be stamped by a registered PE.The work shall be completed within 730 after written Notice to Proceed.The acquisition will be procured as 100% Set-Aside for Small Business. The resulting award will be for one (1) Firm-Fixed-Price (FFP) Contract. All responsible Offerors are encouraged to participate. The Request for Proposal (RFP) will be issued on or about 18 June 2026, online through Procurement Integrated Enterprise Environment (PIEE) which posts the opportunity to SAM.gov; therefore, requests for hardcopies of the solicitation will not be honored.The North American Industrial Classification System (NAICS) Code for this acquisition is 237990 - 0ther Heavy and Civil Engineering Construction.The Small Business Size Standard for this NAICS Code is $45,000,000.00.In order to submit an Offer on this project, your company must-1) Be registered in System for Award Management (SAM) and maintain an active registration status. 2) Be registered in the Procurement Integrated Enterprise Environment (PIEE) for the Solicitation Module with the PROPOSAL MANAGER Manger role. System for Award Management (SAM) RegistrationRegistering in SAM.gov includes both entity validation and entity registration.To register in SAM:a. Navigate to SAM.govb. Select Sign-In (top right)c. Select Create an Account then Follow the Instructions. d. After Account is Set-up, Select Sign In.e. Under the Entity Management widget, Select ?Get Started? button. f. Select Register Entity. As part of entity registration, a Unique Entity ID will be assigned.For Additional Information on SAMTo Register Your Entity (company), please visit https:/www.fsd.gov/gsafsd_sp?id=gsa_index . Here you will find the following, Get Started with Your Registration Check Registration Status ? ACTIVE, INACTIVE, PENDING Update Your Registration Become an Entity Administrator Validate Your Entity *Access User Guides *By selecting this option, you can obtain a Quick Start Guide for Contract Registrations.Also, here you will find in addition to the User Guides - FAQs, Videos, and Definitions.PLEASE NOTEIt is mandatory that all companies be registered in SAM in order to receive federal contracts.There is no charge to register or maintain your company (entity) registration.Login.gov manages usernames and passwords for SAM.gov. *Important* Registration InformationRegistration can take at least ten (10) business days to be active in SAM.gov.Registration must be in active status upon offer submission and remain active during award period.Registration must be renewed every 365 days to remain active.The Federal Service Desk (FSD) for SAM questions, may be contacted. Phone Number: 866-606-8220Hours of Operation: Monday-Friday 8 a.m. to 8 p.m. ETProcurement Integrated Enterprise Environment (PIEE) Solicitation Module RegistrationTo register for PIEE follow the below instructions. Register in PIEE:a. Navigate to https://piee.eb.mil/b. Select Register [top right]c. Select Vendord. Create a User ID and Password and follow the prompts [next]e. Create Security Questions [next]f. Complete your User Profile Information [next]g. Complete your Supervisor or Approving Official Information [next]h. Complete Rolesi. Step 1. Select SOL-Solicitationii. Step 2. Select Proposal Manageriii. Step 3. Click Add Rolesiv. Step 4. Fill in your Location Code (CAGE Code) [next]i. Provide a justification for your registration [next]j. Follow the remaining prompts to submit your registrationThe Procurement Integrated Enterprise Environment (PIEE) help desk may be reached by calling telephone number 866-618-5988 for assistance.
98%
Pre-Solicitation06/18/2026
Webbers Falls Excitation System Replacements, Webbers Falls, Oklahoma. *AM0001 - This Amendment provides pre-proposal site visit information, please review the attachment for details. *AM0002 - This Amendment provides specification, plans, and drawings updates resulting from answered Bidder Inquiries. A proposal due date extension has also been granted. Please review all attachments for full details. *AM0003 - This Amendment is to provide a revised specification sections and changes the Wage Determinations for this project. Please review all the attachments for full details.
84%
Solicitation11/05/2026
PROJECT TITLE: JOHN DAY UNIT 10 PACKING BOX REPLACEMENT PROJECT LOCATION: JOHN DAY DAM, SHERMAN COUNTY, OREGON THIS IS A FULL AND OPEN PROCUREMENT. IN ACCORDANCE WITH RFO 19.110, THIS PROJECT REQUIRES THE HUBZONE 10% PRICE EVALUATION. THE JOHN DAY DAM ON THE COLUMBIA RIVER BETWEEN SHERMAN COUNTY, OREGON, AND KLICKITAT COUNTY, WASHINGTON. THE ESTIMATED MAGNITUDE OF CONSTRUCTION IS BETWEEN $500,000.00 AND $1,000,000.00. THE NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE FOR THIS ACTION IS 237990; OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION WITH A SMALL BUSINESS SIZE STANDARD OF $45M. AS PRESCRIBED IN DFARS 204.7504(A), THIS REQUIREMENT INCLUDES DFARS CLAUSE 252.204-7021 COMPLIANCE WITH THE CYBERSECURITY MATURITY MODEL CERTIFICATION (CMMC) LEVEL REQUIREMENTS. THE CMMC LEVEL REQUIRED BY THIS SOLICITATION IS CMMC LEVEL 1. BID OPENING WILL OCCUR ONE (1) HOUR AFTER BID CLOSING AT 2:00 PM PST DECEMBER 4TH, 2026.
78%
Solicitation12/04/2026
Amendment 0002 - See attached Amendment 0002 - The purpose of this amendment is to incorporate clauses that were unintentionally removed by the Army Contract Writing System and to extend the bid submission date by 11 days from 11:00 A.M. Pacific on 19-NOV-2026 to 11:00 A.M. Pacific on 30-NOV-2026; the bid opening will occur at 1:00 P.M. on the date bids are due. Amendment 0001 - See attached Amendment 0001 and updated solicitation notice below for all details regarding the site visit date and link up location changes: The U.S. Army Corps of Engineer (USACE) Portland District is soliciting construction firms who are interested in submitting a competitive firm-fixed-price bid for this project. This solicitation announcement is for the repair and rehabilitation of two Tainter Valves (TV3 and TV4) at the John Day Lock and Dam (JDA). See the attached Solicitation, which includes the Specifications, and the attached Planset for all details. Because a similar requirement at The Dalles Lock and Dam will be solicited after this solicitation, the Government will host the following two site visits on Tuesday, 03 November 2026: 1. 9:00 A.M. @ John Day Dam (Oregon side), Exit 109 from I-84, John Day Dam Rd, Rufus, OR 97050. Check in with security at the front gate and then proceed to the parking lot across the road from the construction trailer; see the link up location map in the solicitation amendment notice. 2. 2:00 P.M. @ The Dalles Dam (Washington side), Lyle, WA 98635. Take US-197N and exit towards The Dalles Dam Boat Launch and park on the left hand side of the road immediately after turning left 90 degrees towards the Boat Launch; see the link up location map in the solicitation amendment notice. Contractors will be able to see a removed Tainter Valve at The Dalles Dam. Send an email to Andrew Sprys and Justin Figueredo by 11:00 A.M. on Wednesday, 28 October 2026, with the following information to register for the site visits: Solicitation Number: W9127N27BA009, Project Title: JOHN DAY DAM NAVIGATION LOCK TAINTER VALVE (TV) REPAIRS TV3 AND TV4, Name(s) of individual(s) attending site visit, Name of Company, Phone Number, Email Address, Are all individuals U.S. Citizens? Participants of the scheduled site visit must abide by the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, latest version) in accordance with Section 5, Personal Protective and Safety Equipment. It is the responsibility of the participants to wear personal protective and safety equipment as required by this regulation. Failure to comply could result in denial of access to site visit location. Site visit attendees must be U.S. citizens and possess a REAL ID to access the sites. Any subsequent visits will require prearrangement with the Contracting Division personnel listed above and may not be guaranteed/approved. Acceptable forms of proof of citizenship for anyone born outside the USA is: 1. US Birth Certificate: Must be certified and issued by either a US State or the US State Department. 2. US Passport Undamaged: Issued by the US Dept of State, without limitation, does not need to be current, is/was valid for 10 years for adults and 5 years for children under 16. 3. US Passport Card Undamaged: Issued by the US Dept of State, without limitation, does not need to be current. 4. US Certificate of Citizenship: Issued by US Citizenship and Immigration Service. 5. Consular Report of Birth Abroad: Issued by the US State Department. 6. US Naturalization Certificate: Issued by US Citizenship and Immigration Service. 7. Enhanced Drivers License: from Michigan, Minnesota, New York, Vermont, or Washington. Acceptable ID: 1. Real ID drivers license. 2. Enhanced drivers license. 3. Federal Identification Cards PIC/CAC/PIV/Etc. 4. Transportation Worker Identification Card (TWIC). 5. United States Passport or United States Passport Card. 6. Drivers license issued by the Department of State. Magnitude of Construction: The estimated cost of the project is between $1,000,000 to $5,000,000. Cybersecurity Maturity Model Certification (CMMC) level: The CMMC level anticipated for this requirement is CMMC Level 1 (Self). This CMMC level, or higher (see 32 CFR part 170), will be required prior to award and maintained for the duration of the contract for each contractor information system that will process, store, or transmit Federal contract information (FCI) or controlled unclassified information (CUI) during performance of the contract. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE RESPONSE DATE AND TIME. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SOLICITATION OR ANY FOLLOW-UP INFORMATION REQUESTS.
77%
Solicitation11/30/2026

Additional Details

Solicitation Number

W911WN23B8005

Archive Date

Sep 18, 2023

Office Address

PITTSBURGH, PA, 15222-4198