GovChime
Notice ID: 8adfe9acc9254d3dae43b8d7f2cf721fSolicitation

Dam Pier Concrete Repairs, Montgomery Locks and Dam, Monaca, Beaver County, Pennsylvania

Archived on January 15, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:00 AM UTC−04:00
Posted
November 3, 2023
Notice type
Solicitation
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W072 ENDIST PITTSBURGH
Place of performance
Monaca, PA, 15061
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W911WN23B8014
Notice ID
8adfe9acc9254d3dae43b8d7f2cf721f

Description

Dam Pier Concrete Repairs, Montgomery Locks and Dam, Monaca, Beaver County, Pennsylvania. The U.S. Army Corps of Engineers, Pittsburgh District, has a requirement for a project at the Montgomery Locks and Dam which comprises eleven (11) concrete dam piers, each measuring approximately 15?-9 ?? wide by 87?-0? long by 58?-6? high, with an elevation of 664.5? above the normal lower pool level. These piers were originally constructed in the 1930s and are currently exhibiting an overall fair to poor condition. Common deficiencies observed in the piers include delamination, spalls with exposed reinforcement, failed patched areas, and significant cracks in multiple locations.Of particular concern are the pier noses, which are in poor condition, characterized by heavy efflorescence build-up, spalls with exposed reinforcement, unsound patched areas, and cracks up to 1? in width. To mitigate these issues and enhance the structural integrity of the piers, the selected contractor will undertake a series of maintenance efforts, focusing on concrete repair and epoxy grouting of cracks.Scope of Work:The dam pier concrete repairs involve the following key activities:1. Survey and Assessment: Conduct a comprehensive survey of the concrete surfaces to assess the extent of damage and identify specific areas that require repair.2. Concrete Repair: Remove and replace spalled and/or unsound concrete in the piers to restore their original strength and integrity.3. Crack Grouting: Utilize epoxy grouting techniques to address and stabilize cracks in the concrete surfaces, preventing further degradation.4. Installation of Government Furnished Flashboard: To facilitate repairs to the piers immediately adjacent to the fixed crest weirs, the Contractor shall install and remove the Government Furnished Flashboards in order to reduce the river flow overtop of the weirs. Only one set of flashboards is provided sufficient to close off the river flow in one of the two fixed crest weirs sections at a time. This flashboard system shall be returned to the Government at the conclusion of the contract. The Contractor may utilize commercially available ready mix concrete deliveries for the concrete repairs as specified in the package. Deliveries of the concrete materials may be provided at lock wall adjacent to the land chamber and shall be coordinated with the Contracting Officer and Lock Master in advance prior to delivery. Only one lift gate maybe closed at one point in time and the adjacent two lift gate on either side of the gate bay where dam pier concrete repairs are being performed will be placed in restricted status. The concrete repairs may be performed in one gate bay or fixed weir section at a time. Gate schedules are provided in the solicitation documents. In two of the gate bays identified on the drawings, concrete repairs are required upstream of the lift gate and downstream of the dam bulkhead. The dam maintenance bulkheads will be installed by Government personnel in these two gate bays upon advanced notification by the Contractor. Water leakage will occur through the dam bulkheads and the Contractor will need to prepare this leakage within their workplans. Currently there are two active Contracts performing construction at the Montgomery Locks and Dam. Additionally, future contractors will be added to the site to perform more work during this Contract Period of Performance. The contract work in this solicitation package is critical to be performed within the prescribed construction timeline to ensure this work is adequately completed prior to the new Lock contractor mobilizing to the site. All construction demolition material shall be removed from the construction site and disposed of in an appropriately permitted facility. Project Timeline:The project is anticipated to commence on 6 January 2024 and must be completed by 30 June 2025. The contractor must adhere to the agreed-upon schedule to avoid any disruptions to other project work and dam operations.Contract Requirements:Interested contractors must possess relevant experience in dam pier concrete repair, epoxy grouting, and have access to floating plant equipment and be able to work along the downstream face of the dam within the Ohio River.The work shall be completed within 540 calendar days after written Notice to Proceed. 11/3/2023 BID OPENING HELD.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W911WN23B8014
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 2×
    Pre-SolicitationSep 15, 2023

    Dam Pier Concrete Repairs Montgomery Locks and Dam

    Notice ecf7d2cc00c94686b07944943e864946 on SAM.gov

  2. 5×
    SolicitationCurrentSep 29, 2023

    Dam Pier Concrete Repairs, Montgomery Locks and Dam, Monaca, Beaver County, Pennsylvania

    Notice 8adfe9acc9254d3dae43b8d7f2cf721f on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
-AwardedOpen
The Millvale LPP was constructed by U.S. Army Corps of Engineers (USACE) in 1980 under the authority of Section 205 of the Flood Control Act of 1948 as amended. The project consists of about 6,200 feet of channel improvement including concrete gravity retaining walls, concrete wall supports, anchored concrete toe blocks, concrete cap walls, stone-filled gabion mattresses, flap gates and access ramps. The LPP is an urban Flood Control Work (FCW), and it is not a multipurpose project. Heavy rains from 1-12 April 2024 caused flooding which damaged the Project within Girtys Run, including bank erosion, shoaling, erosion of the improved channel, ruptured gabion baskets, washed-out concrete buttresses, and erosion of grouted riprap. Of particular concern are the washed-out buttresses which have migrated to the center of the improved channel, impeding streamflow. If the buttresses are not removed and stream bank improvements continue to deteriorate, there is a risk that debris will continue to accumulate and could ultimately damage the channel downstream of the impediment. To address these damages, Allegheny County requested rehabilitation assistance from USACE through the PL 84-99 program, which authorizes USACE to rehabilitate eligible Federal and non-Federal LPPs damaged or destroyed by floods. An agreement was signed on 6 August 2025 between the Borough of Millvale and USACE to complete the necessary repairs. The work is to be completed within 365 calendar days after written Notice to Proceed (NTP). The Anticipated Construction Cost is between $300,000.00 and $350,000.00. The North American Industrial Classification Code (NAICS) is 237990 - Other Heavy and Civil Engineering Construction. The Small Business Size Standard is $45,000,000.00. Any resultant award will be for one (1) Firm-Fixed-Price (FFP) Purchase Order. The anticipated award date is 22 December 2026. The basis of award will be of best value to the Government. Quotes will be evaluated in accordance with (IAW) RFO Part 13 and 36, price and past performance. The Government reserves the right to reject any quotes that exceed available funds for this requirement. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on View FFP Contract Changes Playbook Here.
-Solicitation12/08/2026
REQUEST FOR INFORMATION THIS IS A REQUEST FOR INFORMATION (RFI)/SOURCES SOUGHT NOTICE BEING RELEASED PURSUANT TO FEDERAL ACQUISITION REGULATION (FAR) PART 10: MARKET RESEARCH. This RFI is issued solely for informational, market research, and planning purposes only. It does not constitute an Invitation for Bid (IFB), Request for Quote (RFQ), or Request for Proposal (RFP) or a promise to issue an RFQ/IFB/RFP in the future. No solicitation document exists at this time. Issuance of this notice does not constitute any obligation on the part of the Government and is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. In addition, respondents are advised that the United States Government is under no obligation to pay for any information or administrative cost incurred in response to this RFI. At this time, proprietary information is not being requested, and respondents shall refrain from providing proprietary information in response to this RFI. The specifications for this requirement will only be available upon solicitation issuance. Requirement: The U.S. Army Corps of Engineer (USACE), Philadelphia District (NAP), anticipates a requirement for Delaware Avenue Revetment CAP 14 Project in Cape May, NJ. The estimated magnitude of this project is between $5,000,000 and $15,000,000. Description: The purpose of the project is to manage the risk of on-going shoreline erosion along Delaware Avenue which is threatening the integrity of the road and a sanitary sewer utility line (8-inch force main) that runs along the northern right-of-way of the road, approximately 4 feet under the surface. The least cost alternative and selected plan identified in the feasibility study involves the removal of approximately 8,400 cubic yards (CY) of existing rubble (sand, rock, concrete and paving debris) along the shoreline and the placement of approximately 3,000 CY of rip-rap. Once the rip-rap is placed, the water ward side of the structure will be backfilled with approximately 5,000 CY of sand and planted with native wetland vegetation. The estimated period of performance will be 165 calendar days. The anticipated North American Industrial Classification System (NAICS) code is 237990, Other Heavy and Civil Engineering Construction, with a SBA Size standard of $45.0M. The Product Service Code (PSC) is Y1QA - Construction of Restoration of Real Property (Public or Private). Survey: The Government is issuing this notice to determine a competitive basis. This is not a solicitation and the items listed herein are subject to change. This survey is for market research purposes only. Only prospective contractors capable of performing this type of work should respond to this Request for Information. Your response to this survey is requested by 2:00 PM Eastern Time, November 11, 2026. Please send by email to Jessica Hazen at Jessica.A.Hazen@usace.army.mil and Connor Struckmeyer at Connor.A.Struckmeyer@usace.army.mil. Include in the title "Sources Sought - Delaware Avenue Revetment" as the subject line in email communications. All submitted responses must be in either Microsoft Word or Adobe pdf format. 1.) Name of your firm: 2.) CAGE/Unique Entity Identifier: 3.) Point of Contact, Phone Number, and E-mail Address: 4.) List up to three (3) projects completed within ten (10) years of the date of this notice that demonstrates experience, as a prime contractor or subcontractor, related to the type of construction provided in the description above. a.) Project Name: Contract Number (if applicable): Year Completed: Was the project completed on time? Prime or Subcontractor: Type and percentage of work self-performed (based on contract value): Dollar Amount: General description of project: b.) Project Name: Contract Number (if applicable): Year Completed: Was the project completed on time? Prime or Subcontractor: Type and percentage of work self-performed (based on contract value): Dollar Amount: General description of project: c.) Project Name: Contract Number (if applicable): Year Completed: Was the project completed on time? Prime or Subcontractor: Type and percentage of work self-performed (based on contract value): Dollar Amount: General description of project: 5.) Are you a Small Business classified under the above NAICS code? If so, do you fall into a sub-category (e.g. HubZone, 8(a), SDVOSB, WOSB, etc.)? 6.) For this requirement, what percentage of this work would you subcontract (reference RFO 52.219-14, Limitations on Subcontracting? 7.) What type of work requirements will you subcontract out to small businesses? 8.) Do you plan to subcontract to only small businesses? 9.) If the answer to question 8 is "yes", are these small businesses with a sub-category (e.g. e.g. HubZone, 8(a), SDVOSB, WOSB, etc.) 10.) What is your bonding capacity per contract? 11.) What is your aggregate bonding capacity per contract? 12.) If this requirement is advertised, do you anticipate submitting a proposal?
-Market Research11/11/2026
JP Murtha Float Mooring Bitts Retrofit - The United States Army Corps of Engineers, (USACE) Pittsburgh District has a requirement for the retrofitting of existing hydraulic structures within an active navigation lock. The Prime Contractor must be capable of executing complex in-the-wet construction, specifically: The John P. Murtha Floating Mooring Bitt Retrofit consists of the installation of Government furnished Floating Mooring Bitts into Contractor fabricated embedded frame on the existing River Chamber Middle Wall. In-the-wet construction methods are required. Design, fabrication, and installation of two dewatering boxes are required for installation of the Floating Mooring Bitts. Removal or alterations to existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started. To achieve this Requirement the Contractor must: a. Floating Plant Operations: Providing, operating, and mooring a fully compliant floating plant (crane/deck barge and push boat) in an active river chamber in accordance with EM 385-1-1. b. Dewatering Box (Cofferdam): Fabricating, installing, and sealing structural steel dewatering boxes against lock monoliths for a strict maximum duration of 90 days. c. Heavy Demolition and Concrete Work: Executing concrete wire-sawing, core drilling, and demolition of existing lock wall recesses, followed by cast-in-place concrete integration. d. Structural Steel and Mooring Bitts: Fabricating heavy steel embedded anchorage frames, and salvaging/installing Government-Furnished Floating Mooring Bitts. e. Commercial Diving: Providing certified commercial dive teams to support underwater inspection, rigging, and cofferdam sealing. The work shall be completed within 730 calendar days after written Notice to Proceed. This acquisition will be procured as an Unrestricted Full and Open Solicitation. The resulting award will be for one (1) Firm-Fixed-Price (FFP) Construction Contract. All responsible Bidders are encouraged to participate. The Invitation for Bid (IFB) will be issued on or about 15 September 2026, online through Procurement Integrated Enterprise Environment (PIEE) which posts the opportunity to SAM.gov; therefore, requests for hardcopies of the solicitation will not be honored. .The North American Industrial Classification System (NAICS) for this procurement is 237990 - Other Heavy and Civil Engineering Construction and the small business size standard is $45Million.In order to submit a Bid on this project, your company must-1) Be registered in System for Award Management (SAM) and maintain an active registration status. 2) Be registered in the Procurement Integrated Enterprise Environment (PIEE) for the Solicitation Module with the PROPOSAL MANAGER role. System for Award Management (SAM) Registration. Registering in SAM.gov includes both entity validation and entity registration. To register in SAM: a. Navigate to SAM.gov b. Select Sign-In (top right) c. Select Create an Account then Follow the Instructions. d. After Account is Set-up, Select Sign In. e. Under the Entity Management widget, Select Get Started button. f. Select Register Entity. As part of entity registration, a Unique Entity ID will be assigned. For Additional Information on SAM To Register Your Entity (company), please visit https:/www.fsd.gov/gsafsd_sp?id=gsa_index . Here you will find the following, Get Started with Your Registration Check Registration Status ACTIVE, INACTIVE, PENDING Update Your Registration Become an Entity Administrator Validate Your Entity *Access User Guides *By selecting this option, you can obtain a Quick Start Guide for Contract Registrations. Also, here you will find in addition to the User Guides - FAQs, Videos, and Definitions. PLEASE NOTE It is mandatory that all companies be registered in SAM in order to receive federal contracts. There is no charge to register or maintain your company (entity) registration.Login.gov manages usernames and passwords for SAM.gov. *Important* Registration Information Registration can take at least ten (10) business days to be active in SAM.gov. Registration must be in active status upon offer submission and remain active during award period. Registration must be renewed every 365 days to remain active. The Federal Service Desk (FSD) for SAM questions, may be contacted. Phone Number: 866-606-8220 Hours of Operation: Monday-Friday 8 a.m. to 8 p.m. ET Procurement Integrated Enterprise Environment (PIEE) Solicitation Module Registration To register for PIEE follow the below instructions. Register in PIEE: a. Navigate to https://piee.eb.mil/ b. Select Register [top right] c. Select Vendor d. Create a User ID and Password and follow the prompts [next] e. Create Security Questions [next] f. Complete your User Profile Information [next] g. Complete your Supervisor or Approving Official Information [next] h. Complete Roles i. Step 1. Select SOL-Solicitation ii. Step 2. Select Proposal Manager iii. Step 3. Click Add Roles iv. Step 4. Fill in your Location Code (CAGE Code) [next] i. Provide a justification for your registration [next] j. Follow the remaining prompts to submit your registration The Procurement Integrated Enterprise Environment (PIEE) help desk may be reached by calling telephone number 866-618-5988 for assistance.
-Solicitation11/12/2026
The U.S. Army Corps of Engineers (USACE), Pittsburgh District, has a project as the Canonsburg-Houston Local Protection Project (LPP) is an authorized federal flood damage reduction project spanning over 20,500 linear feet of channel improvements along Chartiers Creek. Originally constructed by USACE in two phases (Houston unit completed in 1970; Canonsburg unit completed in 1976), operation and maintenance responsibilities were subsequently transferred to Washington County. Severe storm events resulted in substantial damage to the channel embankment along the right bank of Chartiers Creek, including displacement of stone protection and loss of subgrade stabilization. This rehabilitation contract encompasses repair and re-armoring of the degraded channel reach to restore federal project integrity and design conveyance capacity. The work is to be completed within 365 calendar days after written Notice to Proceed (NTP). The Anticipated Construction Cost is between $150,000.00 and $350,000.00. The North American Industrial Classification Code (NAICS) is 237990 - Other Heavy and Civil Engineering Construction. The Small Business Size Standard is $45,000,000.00. Any resultant award will be for one (1) Firm-Fixed-Price (FFP) Purchase Order. The anticipated award date is 11 December 2026. The basis of award will be of best value to the Government. Quotes will be evaluated in accordance with (IAW) RFO Part 13 and 36, price and past performance. The Government reserves the right to reject any quotes that are unrealistically low or exceed available funds for this requirement. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on View FFP Contract Changes Playbook Here.
-Solicitation11/23/2026

Additional Details

Solicitation Number

W911WN23B8014

Archive Date

Jan 15, 2024

Office Address

PITTSBURGH, PA, 15222-4198