GovChime
Notice ID: 21a9f8704bf5409e81395a3c3317bb39Solicitation

Union City Dam Earthen Pothole Construction for Wetland

Archived on March 25, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM UTC−05:00
Posted
January 24, 2024
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
238910: Site Preparation Contractors
Agency
Department of WarDepartment of the Army

Notice details

Office
W072 ENDIST PITTSBURGH
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W911WN24Q8001
Notice ID
21a9f8704bf5409e81395a3c3317bb39

Description

The U.S. Army Corps of Engineers, Pittsburgh District, has a project at Union City Dam in French Creek, PA. The work includes construction of earthen potholes at the project site to improve habitat for wetland dependent wildlife. In general, the tasks required in the performance of this contract include: 1 Installation of four (4) wetland potholes as proposed in the work areas and as noted on the drawings. In general, the following work activities will need completed in construction of the wetland potholes: Install temporary erosion control measures as needed to include approximately 600 linear feet of silt sock down grade of the spoil areas. Remove topsoil and stockpile for reuse prior to constructing pothole wetlands. Construct four (4) wetland potholes meeting the requirements of Natural Resources Conservation Service (NRCS) hydrology, soils, and vegetation criteria for a wetland. All excavated spoils shall be resued onsite in locations identified as spoil area 1 and spoil area 2 on the plan view drawing. Create overflow areas for up slope pothole directing flow into down slope pothole. Directing flow from pothole number 1 to pothole number 2 and from pothole number 3 to pothole number 4. Redirect the existing ditch west of the parking lot into pothole number 3. Place and grade smooth all topsoil on all disturbed ground, inside the pothole wetland, and on top of the spoil areas upon completion of the work. Seed and mulch all disturbed areas adjacent to the wetland potholes and the spoil areas. It shall be noted that permanent seeding will not be required inside the potholes. **NOTICE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here? 1-19-2024: Amendment 0001 issued to 1) Answer questions from potential bidders about the solictation2) Update Attachment 2 ? Wage Determination PA202230002 12-22-2023 to PA2024002 1-19-2024. 1-24-2024 Amendment 0002 issued to 1) Provide responses to questions submitted and 2) Provide a Photo showing the location for unloading and loading deliveries.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W911WN24Q8001
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 3×
    SolicitationCurrentJan 8, 2024

    Union City Dam Earthen Pothole Construction for Wetland

    Notice 21a9f8704bf5409e81395a3c3317bb39 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W911WN24Q8001

Archive Date

Mar 25, 2024

Office Address

PITTSBURGH, PA, 15222-4198