Notice ID: 21a9f8704bf5409e81395a3c3317bb39Solicitation
Union City Dam Earthen Pothole Construction for Wetland
Archived on March 25, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM UTC−05:00
- Posted
- January 24, 2024
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 238910: Site Preparation Contractors
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W072 ENDIST PITTSBURGH
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W911WN24Q8001
- Notice ID
- 21a9f8704bf5409e81395a3c3317bb39
Description
The U.S. Army Corps of Engineers, Pittsburgh District, has a project at Union City Dam in French Creek, PA. The work includes construction of earthen potholes at the project site to improve habitat for wetland dependent wildlife. In general, the tasks required in the performance of this contract include: 1 Installation of four (4) wetland potholes as proposed in the work areas and as noted on the drawings. In general, the following work activities will need completed in construction of the wetland potholes: Install temporary erosion control measures as needed to include approximately 600 linear feet of silt sock down grade of the spoil areas. Remove topsoil and stockpile for reuse prior to constructing pothole wetlands. Construct four (4) wetland potholes meeting the requirements of Natural Resources Conservation Service (NRCS) hydrology, soils, and vegetation criteria for a wetland. All excavated spoils shall be resued onsite in locations identified as spoil area 1 and spoil area 2 on the plan view drawing. Create overflow areas for up slope pothole directing flow into down slope pothole. Directing flow from pothole number 1 to pothole number 2 and from pothole number 3 to pothole number 4. Redirect the existing ditch west of the parking lot into pothole number 3. Place and grade smooth all topsoil on all disturbed ground, inside the pothole wetland, and on top of the spoil areas upon completion of the work. Seed and mulch all disturbed areas adjacent to the wetland potholes and the spoil areas. It shall be noted that permanent seeding will not be required inside the potholes. **NOTICE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here? 1-19-2024: Amendment 0001 issued to 1) Answer questions from potential bidders about the solictation2) Update Attachment 2 ? Wage Determination PA202230002 12-22-2023 to PA2024002 1-19-2024. 1-24-2024 Amendment 0002 issued to 1) Provide responses to questions submitted and 2) Provide a Photo showing the location for unloading and loading deliveries.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W911WN24Q8001- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 3×SolicitationCurrentJan 8, 2024
Union City Dam Earthen Pothole Construction for Wetland
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W911WN24Q8001
Archive Date
Mar 25, 2024
Office Address
PITTSBURGH, PA, 15222-4198