Town of Cairo – Water System Improvements Project
Archived on January 7, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM EST
- Posted
- December 9, 2025
- Notice type
- Sources Sought
- NAICS
- 237110: Water and Sewer Line and Related Structures Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION GREAT LAKES AND OHIO.ENDIST PITTSBURGH.W072 ENDIST PITTSBURGH
- Place of performance
- Cairo, West Virginia, 26337
- Last updated
- Nov 5, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W911WN26B1AZ5
- Notice ID
- 5bfef24b67d54fbdbd8becbcc489cf59
Description
USACE Pittsburgh District (LRP) requests the response of all capable contractors interested in furnishing all labor, equipment, devices, and materials to perform all work necessary to perform Water System Improvements at Town of Cairo in Cairo, Ritchie County, WV.
The U.S. Army Corps of Engineers, Pittsburgh District, is carrying out a project to upgrade the water distribution system in the Town of Cairo by installing new water lines, replacing water service meter setting, rehabilitation an existing pressure reducing valve station, installing a new pressure reducing valve station, and cleaning, inspecting, and rehabilitation and existing water storage tank.
The major features of the Project generally involves the following:
- In-Town Water Line Replacement
- Service Line and Meter Setting Replacement
- Silver Run Water Line Replacement & Extension
- High Street – Smith Hill Interconnection & Pressure Reducing Valve Installation
- Valve Replacements
- Fire Hydrant Replacement
- Leak Detection Meter Installation
- Pressure Reducing Valve Rehabilitation
- Tank Cleaning, Inspection, and Rehabilitation
The work is to be performed on existing utility easements or easements that have been obtained for the project. Project physical construction is proposed to take place in the period between April 2026 and September 2026. This would allow the Contractor to perform all necessary work. Disposal of construction waste material will be disposed of at a landfill.
Note: This is not a solicitation. This is a Sources Sought Notice (SSN) for planning purposes only. The information obtained from responses to this SSN may be used in the development of an acquisition strategy and future solicitation. No contract will be awarded based on the SSN nor any reimbursement made for information submitted.
If this effort is set aside, FAR clause 52.219-14(e)(4), Limitations on Subcontracting, will apply. The contractor agrees that it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 75 percent subcontract amount that cannot be exceeded.
The solicitation will be conducted under NAICS code 237110 - Water and Sewer Line and Related Structures Construction with an associated small business size standard of $45,000,000.00 average annual revenue.
The Magnitude of Construction is Between $1,000,000 and $5,000,000.
The anticipated period of performance is 365 calendar days from Notice to Proceed.
No set-aside determination has been made at this time.
The contractor shall furnish all labor, equipment, devices, and materials and perform all work in accordance with the specifications.
The contractor shall comply with all applicable federal, regional, state, and local laws and commercial standards.
The above description of work is for general information only and is not intended to include or describe every feature of the work or to define the complete scope of the work.
RESPONSE PROCEDURE
To assist with planning, the GOV requests interested contractors submit the following by 10:00AM ET, 23 December 2025:
(1) A positive statement of intent to submit a bid or proposal for this solicitation as a prime contractor. Include a description of how the 75 percent subcontracting requirement would be met. Describe how anticipated subcontractors, if any, would be selected and which functions they would be responsible for.
(2) A capability statement. This must include:
- relevant construction experience, addressing projects of similar size, scope and complexity
- trades involved
- percent of work self-performed vs. in-house
(3) Indicate your firm’s bonding capacity.
(4) Dated letter, certification, or registration in the appropriate program repository from the appropriate competent jurisdiction that evidences SB, 8(a), HUBZone, WOSB, EDWOSB, and/or SDVOSB participation and/or certification, such as an SBA certification letter or other evidence. (For more information on the definition or requirements, refer to http://www.sba.gov.).
All the above must be submitted in sufficient detail for a decision to be made on the availability of interested SB, 8(a), HUBZone, WOSB, EDWOSB, or SDVOSB concerns. Failure to submit all the information requested may result in a contractor being considered ‘not interested’ in this requirement.
Firms that meet the requirements described in this announcement are invited to submit their documentation to the attention of Aaron Barr, Contract Specialist, at aaron.m.barr@usace.army.mil , and copy Leanna Lesefka, Contracting Officer, at leanna.c.lesefka@usace.army.mil.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
- 3Version 3Sources SoughtArchivedCurrent
Town of Cairo – Water System Improvements Project
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Town of Cairo Water System Improvements Town of Cairo, Cairo, West Virginia The U.S. Army Corps of Engineers, Pittsburgh District, is carrying out a project to upgrade the existing water distribution systems within the Town of Cairo, WV. The project site has been divided into three general areas including the Water Distribution System Improvements, Water Meter Setting Replacements, and Water Storage Tank Rehabilitation. The base contract work generally consists of the following: ? Water Distribution System Improvements o Work includes approximately 5,600 LF of 6-inch water line, approximately 450 LF of 4-inch water line, approximately 1,750 LF of 2-inch water line, approximately 22 gate valves, approximately 18 water line tie ins, approximately 11 fire hydrant installations, approximately 13 fire hydrant demolitions, and approximately 8,250 LF of road restoration in and out of DOH rights-of-way including HMA, gravel, and concrete. ? Water Meter Setting Replacements o Work includes approximately 6,800 LF of polyethylene service tubing varying in size from 3/4-inch to 2-inch, approximately 195-meter settings, approximately 188 existing customer reconnections, and remove and repair approximately 119 existing service saddles. ? Water Storage Tank Rehabilitation o Work includes draining the existing water storage tank, inspecting the existing water storage tank, removing dirt and debris from the existing water storage tank, repairing the existing water storage tank, disinfecting the existing water storage tank, and filling the existing water storage tank. ? Execute various measures to facilitate work including traffic control, erosion and sedimentation control, and others. The contractor will be required to furnish all materials proposed for installation, and will be responsible for properly disposing, or recycling, as appropriate, respective items removed. Removed items deemed for disposal or recycling are to be taken to commercially permitted facilities licensed to accept the same, as applicable. The contractor will be required to adhere to USACE Construction Quality Management concepts and procedures. The work shall be completed within 365 calendar days after written Notice to Proceed. Estimated Contract Magnitude: Between $1,000,000 and $5,000,000The acquisition will be procured as unrestricted, full and open competition. The resulting award will be for one (1) Firm-Fixed-Price (FFP) Contract. All responsible Bidders are encouraged to participate. The Invitation for Bid (IFB) will be issued on or about 17 July 2026, online through Procurement Integrated Enterprise Environment (PIEE) which posts the opportunity to SAM.gov; therefore, requests for hardcopies of the solicitation will not be honored. The North American Industrial Classification System (NAICS) Code for this acquisition is 237110 - Water and Sewer Line and Related Structures Construction. The Small Business Size Standard for this NAICS Code is $45,000,000.00.In order to submit a Bid on this project, your company must-1) Be registered in System for Award Management (SAM) and maintain an active registration status. 2) Be registered in the Procurement Integrated Enterprise Environment (PIEE) for the Solicitation Module with the PROPOSAL MANAGER Manger role. System for Award Management (SAM) Registration Registering in SAM.gov includes both entity validation and entity registration.To register in SAM:a. Navigate to SAM.govb. Select Sign-In (top right)c. Select Create an Account then Follow the Instructions. d. After Account is Set-up, Select Sign In.e. Under the Entity Management widget, Select -inchGet Started-inch button. f. Select Register Entity. As part of entity registration, a Unique Entity ID will be assigned.For Additional Information on SAMTo Register Your Entity (company), please visit https:/www.fsd.gov/gsafsd_sp?id=gsa_index . Here you will find the following, Get Started with Your Registration Check Registration Status ? ACTIVE, INACTIVE, PENDING Update Your Registration Become an Entity Administrator Validate Your Entity *Access User Guides *By selecting this option, you can obtain a Quick Start Guide for Contract Registrations.Also, here you will find in addition to the User Guides - FAQs, Videos, and Definitions.PLEASE NOTEIt is mandatory that all companies be registered in SAM in order to receive federal contracts.There is no charge to register or maintain your company (entity) registration.Login.gov manages usernames and passwords for SAM.gov. *Important* Registration InformationRegistration can take at least ten (10) business days to be active in SAM.gov.Registration must be in active status upon offer submission and remain active during award period.Registration must be renewed every 365 days to remain active.The Federal Service Desk (FSD) for SAM questions, may be contacted. Phone Number: 866-606-8220Hours of Operation: Monday-Friday 8 a.m. to 8 p.m. ETProcurement Integrated Enterprise Environment (PIEE) Solicitation Module RegistrationTo register for PIEE follow the below instructions. Register in PIEE:a. Navigate to https://piee.eb.mil/b. Select Register [top right]c. Select Vendord. Create a User ID and Password and follow the prompts [next]e. Create Security Questions [next]f. Complete your User Profile Information [next]g. Complete your Supervisor or Approving Official Information [next]h. Complete Rolesi. Step 1. Select SOL-Solicitationii. Step 2. Select Proposal Manageriii. Step 3. Click Add Rolesiv. Step 4. Fill in your Location Code (CAGE Code) [next]i. Provide a justification for your registration [next]j. Follow the remaining prompts to submit your registrationThe Procurement Integrated Enterprise Environment (PIEE) help desk may be reached by calling telephone number 866-618-5988 for assistance. | 94% | Pre-Solicitation | 07/17/2026 |
Update 0005 is to adjust the estimated solicitation issue date to on or about January 04, 2027 and estimated response date (bid opening) to on or about February 04, 2027. Update 0005 is for administrative purposes only, any official amendment will be accompanied by an SF30. Update 0004 is to adjust the estimated solicitation issue date to on or about July 20, 2026 and estimated response date (bid opening) to on or about August 20, 2026. Update 0004 is for administrative purposes only, any official amendment will be accompanied by an SF30. Update 0003 is to adjust the estimated solicitation issue date to on or about April 13, 2026 and estimated response date (bid opening) to on or about May 13, 2026. Update 0003 is for administrative purposes only, any official amendment will be accompanied by an SF30. Update 0002 is to adjust the estimated solicitation issue date to on or about March 13, 2026 and estimated response date (bid opening) to on or about April 13, 2026. Update 0002 is for administrative purposes only, any official amendment will be accompanied by an SF30. Amd 0001 to Notice to add the estimated solicitation issue date of January 23, 2026 and estimated response date (bid opening) February 24, 2026 to the notice. The work includes various maintenance access and pipeline isolation improvements along the existing Brine Discharge Pipeline (16-inch to 30-inch diameters). Construction generally includes the installation of 4 pipeline/access improvements along Goetz Road, 2 pipeline/access improvements along Winter Circle, 4 pipeline/access improvements along the Salt Creek channel and within the Salt Creek Trail, and 2 pipeline/access improvements located inside the Districts Sun City Regional Water Reclamation Facility property. The work also includes cleaning of approximately 13,140 linear feet of the existing Brine Discharge Pipeline. The work is located in the City of Menifee, Riverside County, California. This is a Small Business Set Aside acquisition. This acquisition will be conducted under Federal Acquisition Regulation (FAR)Part 14 Sealed Bid. The estimated magnitude of construction is $5,000,000 - $10,000,000. North American Industry Classification System (NAICS) code - 237110 Water and Sewer System Construction. Size Standard $45,000,000.00. BIDDERS PLEASE NOTE: This project may be delayed, canceled or revised at any time prior to issuance of solicitation, bid opening or contract award. | 74% | Pre-Solicitation | 02/04/2027 |
Midwest City Water Tower - Midwest City, OK. Please review solicitation W912BV26RA027 and all associated attachments as provided with this notice. *Amendment 0001 - This Amendment corrects a contract line item and adds additional work for demolition. A completed Geotechnical Report is being added as attachments to the solicitation. Please review all new specification sections, plans, and attachments for full details. *Amendment 0002 - This Amendment is to incorporate revisions to specification section 33 16 15, please review the attached files for full details. | 74% | Solicitation | 08/13/2026 |
This Request for Quote (RFQ) is for the contractor shall provide all materials, equipment, and labor to replace approximately 810 lineal feet of 2? HDPE water line and tie into existing underground gatevalves at point 1 and point 3 at Cagles Mill Lake located in Poland, IN. All work shall be performed in strict compliance with the attached specifications and all other terms, clauses, and conditions incorporated herein. Quotes are due on 9 July 2026 at 10:00 AM Eastern Time.NOTE: THIS RFQ IS 100% SET ASIDE FOR SMALL BUSINESS. The NAICS code for this procurement is 237110. The size standard is $45M.The solicitation will be available on the web only. Telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can view, navigated, or printed using Adobe Acrobat Reader. To download the solicitation for this project, contractors are required to register at the Federal Business Opportunities. Amendments will be available from the beta.sam.gov website by download only. Prior to submission of quotes all contractors must have an active registration in the System for Award Management (SAM) database. To register or update information go to http://www.SAM.gov. Questions may be addressed to adyson.medley@usace.army.mil. This announcement serves as the advance notice. | 73% | Solicitation | 07/14/2026 |
On October 21, 2026, amendment 0003 to solicitation 1240LT26Q0109 - GAOA Flaming Gorge Water System Buckboard, Ashley National Forest has been posted to SAM.gov and accomplished the following: 1. Extends the due date for quotes from 11/04/2026 to 11/17/2026. 2. Post RFI Q&A labeled "C04a RFI QA 1240LT26Q0109 102026." 3. Post revised SOW labeled "C04b New SOW 1240LT26Q0109 102026." 4. Post revised Specs labeled "C04c New Specs 1240LT26Q0109 102026." 5. Post measurement and payment supplement labeled "C04d Measurement PYMT Sup 1240LT26Q0109 102026." 6. Post measurement and payment specs labeled "C04e Measurement PYMT Spec 1240LT26Q0109 102026." 7. Post revised SOI labeled "C04f New SOI 1240LT26Q0109 102026." 8. Post options supplement labeled "C04g Options Supplement 1240LT26Q0109 102026." This amendment must be acknowledged and submitted with your quote. ********************************************************************************************************************************* On October 16, 2026, amendment 0002 to solicitation 1240LT26Q0109 - GAOA Flaming Gorge Water System Buckboard, Ashley National Forest has been posted to SAM.gov and accomplished the following: 1. Extends the due date for quotes from 10/27/2026 to 11/04/2026. 2. Post the site visit attendance sheet labeled "C05a Site Visit 1240LT26Q0109." This amendment must be acknowledged and submitted with your quote. ********************************************************************************************************************** On September 30, 2026, amendment 0001 to solicitation 1240LT26Q0109 - GAOA Flaming Gorge Water System Buckboard, Ashley National Forest has been posted to SAM.gov and accomplished the following: 1. Extends the due date for quotes from 10/08/2026 to 10/27/2026.This amendment must be acknowledged and submitted with your quote. ************************************************************************************************************************* Buckboard Marina Water System Improvements | 72% | Combined Synopsis | 11/17/2026 |
Additional Details
Solicitation Number
W911WN26B1AZ5
Archive Date
Jan 7, 2026
Office Address
PITTSBURGH, PA, 15222-4198