Notice ID: 1f10fda5b084fe59afcd09e58f6901baAward NoticeAwarded
SAO Boiler
Awarded on September 30, 2019. Full description on SAM.gov.
Awarded tounder W911XK19C0022 (source: SAM.gov award notice)• $6.2M
Overview
- Posted
- October 1, 2019
- Notice type
- Award Notice
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of War
Notice details
- Place of performance
- Soo Locks, in Sault Ste. Marie, Michigan, Sault Ste. Marie, MI, 49783
- PSC
- Z: MAINT, REPAIR, ALTER REAL PROPERTY
- Last updated
- Dec 4, 2025
- Award date
- Sep 30, 2019
- Award amount (SAM.gov award notice)
- $6.2M
Identifiers
- Solicitation number
- W911XK19R0017
- Notice ID
- 1f10fda5b084fe59afcd09e58f6901ba
- Award number (PIID)
- W911XK19C0022
Description
The US Army Corps of Engineers (USACE), Detroit District requires construction services for replacement of the boiler system in the Steam Plant Building, at the Soo Locks, in Sault Ste. Marie, Michigan. At 20 years old, the existing natural-gas-fired boilers are near the end of the typical service life for this type of boiler. This project replaces the existing boilers and supporting equipment while providing improvements to the system as far as efficiency and controls. Work includes demolition and removal of the existing boiler system electrical and mechanical equipment, and backup propane tanks. The new boiler system consists of 3 natural-gas-package boilers, approximately 5,000,000 Btu/hr output each, a larger condensate return tank, building ventilation improvements, automatic chemical treatment, feed water heating, a new make-up water connection, and a Programmable Logic Controller (PLC) system with tie in to the existing Supervisory Control and Data Acquisition (SCADA) system. Upgrades to the Steam Plant Building include, fire alarm system, electrical unit heaters, surge protection system, lighting, and replacement/additions of the Concrete Masonry Unit (CMU) and limestone façade associated with ventilation changes. This project is logistically challenging because the Steam Plant Building is located between the Poe and Davis Locks. It's anticipated that marine activities will be required for delivery and removal of construction equipment and the boilers. Option 1 work includes the addition of a utility tunnel and trench that connects the Steam Plant Building to the Poe lock gallery for gas, steam, and condensate piping as well as electrical and communication cable routing. Option 2 work includes replacement of the Steam Plant Building roof.
Award Overview
Award Number
W911XK19C0022
Award Amount (SAM.gov award notice)
$6.2M
Award Date
Sep 30, 2019
Awardee
Awardee UEI
GTP8S87MBPF3
Original Solicitation
Notice ID: 1f10fda5b084fe59afcd09e58f6901ba
Posted Date: Oct 1, 2019
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $24.3MSigned Apr 22, 2026
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W911XK19R0017- Market Research
- Pre-Solicitation
- Combined Synopsis
- Awarded
This opportunity has been awarded.
- 2×Special NoticeJul 12, 2019
FY19 Soo Area Office Boiler Replacement
- 6×
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W911XK19R0017
Archive Date
Aug 12, 2020
Office Address
DETROIT, MI, 48226-5000