Mobile Home Demolition
Archived on September 26, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM EDT
- Posted
- September 9, 2026
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 238910: Site Preparation Contractors
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- NATIONAL GUARD BUREAU.JFHQ USPFO FL.USPFO FL PROCUREMENT.W7M2 USPFO ACTIVITY FL ARNG
- Place of performance
- Jacksonville, Florida, 32221
- PSC
- P400: SALVAGE- DEMOLITION OF BUILDINGS
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W911YN-26-Q-A024
- Notice ID
- d578f654fd3a46fbac4dfaf905d3e19a
Description
***SEE ATTACHED Q&A SET AS OF 09 SEP 2026***
PERFORMANCE WORK STATEMENT
Mobile Office Demolition
1.0 Objective
The primary objective of this project is to safely and completely demolish one specified unit, process and remove all materials and debris from the site, and install safety cones, caution tape and decals.
2.0 Scope of Work
This project will be executed in three (3) distinct phases:
Phase 1: Structural Demolition and Separation Systematically dismantle and demolish one (1) unit located on the property. Work includes structural tear down and careful separation of components. All necessary tools and equipment will be utilized to safely deconstruct the units in a controlled manner, mitigating risk to surrounding property and personnel.
Phase 2: Debris Processing and Haul-Away All debris, rubble, and waste generated from the demolition of both units will be collected and loaded into a designated roll-off dumpster. The steel trailer frame will be methodically cut into smaller, manageable sections suitable for safe handling and transport. Once loaded, the dumpster containing all general demolition debris and the prepared steel sections will be hauled away from the property for proper disposal and/or recycling at a certified facility.
Phase 3: Final Site Cleanup Upon removal of all large debris, a comprehensive cleanup of the entire work area will be performed. This includes sweeping, raking, and removing any remaining project-related materials, fasteners, or fragments. The goal is to leave the site in a clean, orderly, and hazard-free condition.
3.0 Completion Standard
The project will be considered complete when the unit is fully demolished, all associated materials and debris have been removed from the premises, and the immediate work area is clean and clear.
4.0 Details
Location: FMS 11, 9902 Normandy Blvd, Jacksonville, FL 32221
Dimensions: 70 ft x 30 ft (2310-01-C03-6479, MOBILE HOME: 10834-AB)
Site POC: CW2 Merrill, Andrew
(904) 682-6215 ext. 1150
andrew.d.merrill2.mil@army.mil
Site Visit
Date: 09 September 2026
Time: 10:00 AM
Location: FMS 11, 9902 Normandy Blvd, Jacksonville, FL 32221
POC: Andrew Merrill (CW2)
andrew.d.merrill2.mil@army.mil
(904) 682-6215 ext. 1150
Robert Glanowski (Contract Specialist)
robert.j.glanowski.civ@army.mil
(904) 823-0555
***Attendance is not required and will not prohibit quote submissions.***
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (4)
Lifecycle
- 1Version 1SolicitationArchived
Mobile Home Demolition
- 3Version 3SolicitationArchivedCurrent
Mobile Home Demolition
Similar Opportunities
Additional Details
Solicitation Number
W911YN-26-Q-A024
Archive Date
Sep 26, 2026
Office Address
ST AUGUSTINE, FL, 32085-1008