GovChime
Notice ID: 665983728715424fb3ba4ee784c1e435Solicitation

F-22 Low Observable Component Repair Facility (LOCRF)

Archived on May 20, 2022. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−05:00
Posted
February 15, 2022
Notice type
Solicitation
Agency
Department of WarDepartment of the Army

Notice details

Office
W2SD ENDIST NORFOLK
Place of performance
Langley AFB, VA, 23665
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W9123621R2023
Notice ID
665983728715424fb3ba4ee784c1e435

Description

Amendment 0014 is uploaded to add revised Small Business Participation Plan Uploaded revised Bid Schedule - Amendment 0013 Amendment 12 Technical / ProjNet Responses and FAR clauses Amendment 11 Technical Amendment and extend the solicitation closing date to 17 February 2022. Amendment 10 to extend the solicitation closing date to 11 February 2022. Site Visit 10 January is uploaded Amendment 9 is uploaded Amendment 8 is uploaded. Amendment 7 is upload Amentment 6 is uploaded Amendment 5 is uploaded please review for current information. Amendment 4 is uploaded please review for current information on closing. USACE has received authority to proceed with the acquisition of this construction project and is extending its initial solicitation phase. This is still a bifurcated project. Offerors are encouraged to submit proposals in response to Factors 1 and 2. All offerors, including those that submitted proposals by the original solicitation due date, will be afforded equal consideration throughout the source selection process. Refer to the SF30 for additional details. Amendment 3 is available. This is the Solicitation. Description: This project is the construction of a 6,735-square-meter, four-bay high-bay (three low observable critical repair and one wash rack) Low Observable Component Repair Facility in support of 38 additional F-22A aircraft from Tyndall Air Force Base (AFB), relocated to bed-down at Langley AFB, in Hampton, Virginia, to provide adequate maintenance capacity. Construction includes a compacted fill above the 100-year flood plain, reinforced concrete foundations, concrete floor slab, structural steel frame with concrete masonry unit facade, and a standing seam metal roof. The facility will provide all necessary spaces to house three corrosion control hangar bays, one wash rack hangar, shops, tools/support, staff administration, ready room, break room, restrooms/showers/lockers, and building systems support. Each hangar bay will be equipped with appropriate air filtration supply and return systems. The project includes all utilities, site improvements, pavements, detection protection features, security enhancements and other supporting work necessary to make a complete and useable facility. The facility must be able to withstand seismic and wind effects as prescribed in applicable code and design guides. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria 1-200-1, General Building Requirements. Sustainable principles and life-cycle cost-effective practices will be integrated into the design, development and construction of the project in accordance with Unified Facilities Criteria 1-200-02. This project will comply with Department of Defense minimum anti-terrorism requirements in Unified Facilities Criteria 4-010-01. Air Conditioning: 300 Tons. The three hangar bays will be used for corrosion control maintenance and one bay as a wash rack. The facility will provide fire protection and suppression systems, offices, male/female restrooms with showers and lockers, and electrical/mechanical/ telecommunications support rooms. Site utilities must provide sufficient electrical and communications service to meet F-22A in-bay power-up, data automation system and computerized diagnostic equipment requirements. The facility must provide a secure and climate-controlled space, in which to accomplish the specialized maintenance and repair procedures required for the F-22A’s state-of-the-art stealth mission technology. Construction contract duration is expected to be 730 calendar days.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Dianne K. Grimes
Fax: 7572017183

Documents

No documents available.

Lifecycle

Solicitation:W9123621R2023
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationDec 1, 2020

    F22 LOCRF

    Notice d5edf19f18e742f48a1c16d22a0974aa on SAM.gov

  2. 5×
    SolicitationDec 18, 2020

    F-22 Low Observable Component Repair Facility (LOCRF)

    Notice fc3ba0fc5922452a866ce39956ca7516 on SAM.gov

  3. Special NoticeAug 3, 2021

    W9123621R2023 - F22 LOCRF - Notice of Intent

    Notice 7ff2fe61e55145a58fd5980d873d2c93 on SAM.gov

  4. 5×
    SolicitationOct 6, 2021

    F-22 Low Observable Component Repair Facility (LOCRF)

    Notice 49c742ca4f1f4ee9ae0b48b7f9468086 on SAM.gov

  5. 2×
    Special NoticeNov 3, 2021

    W9123621R2023 - F22 LOCRF - Notice of Intent

    Notice 8a743a98f848482e936c6acddf0a7571 on SAM.gov

  6. 13×
    SolicitationCurrentNov 5, 2021

    F-22 Low Observable Component Repair Facility (LOCRF)

    Notice 665983728715424fb3ba4ee784c1e435 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W9123621R2023

Archive Date

May 20, 2022

Office Address

NORFOLK, VA, 23510-1096