GovChime
Notice ID: a671f610833d4cc3bedc65a8fd58be11Solicitation

Building 34 Chiller Replacement

Archived on February 26, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−05:00
Posted
March 7, 2024
Notice type
Solicitation
Agency
Department of WarDepartment of the Army

Notice details

Office
W2SD ENDIST NORFOLK
Place of performance
Richmond, 23297
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W9123624B2010
Notice ID
a671f610833d4cc3bedc65a8fd58be11

Description

02/27/2024: Amendment 0006 posted, please see attachment. 02/23/2024: Amendment 0005 posted to correct bid due date from 26 February 2024 to 28 February 2024. There is NO ATTACHMENT associated with this amendment as it is administrative only.02/21/2024: Amendment 0004 posted, please see attachment. 02/15/2024: Amendment 0003 posted, please see attachment. 02/07/2024: Amendment 0002 posted, please see attachment. 02/01/2024: Amendment 0001 posted, please see attachment. The work will include demolishing Building 34 existing chilled water equipment, which includes but not limited to: water cooled chiller, cooling tower, and pumps located in two mechanical rooms adjacent to the building entrance and replace with a similar capacity air cooled chiller with supporting equipment (pumps, expansion tanks, piping system, air separators, etc.) and new electrical infrastructure support (feeder and branch circuit, disconnect switches etc.) extending from B34 to new equipment. The existing diesel generator will be demolished and replaced with a new natural gas generator with Automatic Transfer Switch (ATS) to support back-up operation.The air cooled chiller will be placed outdoor in the outdoor equipment area adjacent to the mechanical room. Existing electrical infrastructure to be demolished along with the existing equipment removed. Minor modification to the building structure/site work will be needed to allow removal of existing equipment and installation of new equipment in mechanical rooms and outdoor equipment yard including but not limited to: capping roofing penetrations after cooling tower is removed, wall demolition and new work, removing existing concrete equipment pads, and new underground gas piping for gas generator.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W9123624B2010
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationJan 4, 2024

    Building 34 Chiller Replacement

    Notice b79170ec7ef94bd0bd0897f0c77fb789 on SAM.gov

  2. 10×
    SolicitationCurrentJan 25, 2024

    Building 34 Chiller Replacement

    Notice a671f610833d4cc3bedc65a8fd58be11 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W9123624B2010

Archive Date

Feb 26, 2025

Office Address

NORFOLK, VA, 23510-1096