GovChime
Notice ID: 120e1871f2ec456e9cb9470d8c51ef28Sources SoughtArchived

Sources Sought: Tangier Island Beneficial Use

Archived on April 10, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM EDT
Posted
March 11, 2026
Notice type
Sources Sought
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTH ATLANTIC.ENDIST NORFOLK.W2SD ENDIST NORFOLK
Place of performance
Tangier, Virginia, 23440
PSC
Y1KF: CONSTRUCTION OF DREDGING FACILITIES
Last updated
Nov 2, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W9123626SA002
Notice ID
120e1871f2ec456e9cb9470d8c51ef28

Description

THIS IS A SOURCES SOUGHT NOTICE ONLY. THIS IS NOT A REQUEST FOR PROPOSALS. ALL AVAILABLE INFORMATION IS INCLUDED IN THIS NOTICE.

Purpose:

USACE is evaluating the beneficial use of shoaled sediments within the Tangier Island navigation channel. The volume of shoaled material varies depending on dredging frequency; however, the most recent survey indicates that approximately 100,000 cubic yards are currently present within the channel. Instead of disposing of this material offshore or placing it directly along the shoreline, USACE proposes to use it for shoreline stabilization by placing it within geotextile tubes (i.e. Geotubes®). Additional details regarding sediment characteristics are provided in the Geotechnical Summary, and design information is included in the Coastal Summary sections.

The attached document contains both the Geotechnical Summary and the Coastal Summary. Please answer the survey questions below using the data from this document.

Industry Survey:

Given the details provided in the attached document, is it feasible to construct geotextile tubes given the fine grained nature of the soil and is there enough material available for the proposed design?

Geotechnical Summary Survey

  1. Based on the fine-grained nature of the dredge material, it is feasible to fill geotextile tubes effectively?
  2. What are the anticipated losses during the dredging and infilling process of the geotextile tubes based on our geotechnical data?
  3. What is the expected "shrinkage" factor? Specifically, for every cubic yard of material dredged, what is the anticipated final, consolidated volume of material inside the tube?
  4. What are the anticipated dewatering times for the geotextile tubes, particularly when filled with material having a high percentage of fines?
  5. How long is the anticipated dewatering and consolidation period to achieve the required strength for the design?
  6. Should additional geotechnical data be collected to better inform your analysis?

Coastal Summary Survey

  1. What are the recommended wave heights for single and stacked systems?
  2. How does the product perform during elevated water levels and overtopping conditions?
  3. What anchoring or toe stabilization measures are recommended in the sandy sediment?
  4. How deep do the anchors go to stabilize the geotextile tubes and is it pertinent to know the type of material the anchors are founded in? Surface grab samples indicate >98% sand.  
  5. How is scour addressed during storm events that produce medium-high wave energy?
  6. Can the geotubes be placed in the nearshore (-3 ft MLLW), or do they need to be placed on the beach?

This Sources Sought Synopsis should not be construed in any manner to be an obligation on the part of the U.S. Army Corps of Engineers–Norfolk District to issue a contract or result in any claim for reimbursement of costs for any effort you expand responding to this request. No solicitation is currently available. The Government will utilize this information in determining an acquisition strategy.

Please submit responses to the above questions via email to Caleb Bookout at brian.c.bookout@usace.army.mil, copying Tiffany N. Kirtsey at tiffany.n.kirtsey@usace.army.mil. Responses must be submitted no later than Close of Business 25 March 2026.

All prospective contractors are required to be registered in the System for Award Management (SAM) database prior to contract award. Offerors and contractors may obtain information on registration and annual confirmation requirements by calling 1-866-606-8220 or via the Internet at https://www.sam.gov. Representations and Certifications Applications apply to this solicitation. Representations and Certifications may be completed online via the SAM.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (1)

  • Tangier Island Beneficial Use - Geotechnical Summary and Coastal Summary.pdf

    704 KBAdded in Sources Sought version 3Posted
    Download

Lifecycle

  1. 3
    Version 3Sources SoughtArchivedCurrent

    Sources Sought: Tangier Island Beneficial Use

    Notice 120e1871f2ec456e9cb9470d8c51ef28 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

W9123626SA002

Archive Date

Apr 10, 2026

Office Address

NORFOLK, VA, 23510-1096