GovChime
Notice ID: 01d75ad8f4a4441aaeecdb9dfee93e10Sources SoughtArchived

Winfield Roller Gate RFI

Archived on September 8, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 PM EDT
Posted
July 30, 2026
Notice type
Sources Sought
Set-aside
No Set aside used
NAICS
332312: Fabricated Structural Metal Manufacturing
Agency
Department of WarDepartment of the Army

Notice details

Office
W072 ENDIST HUNTINGTON
Place of performance
Red House, West Virginia, 25168
PSC
9640: IRON AND STEEL PRIMARY AND SEMIFINISHED PRODUCTS
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W91237-26-Q1C5L
Notice ID
01d75ad8f4a4441aaeecdb9dfee93e10

Description

This Request For Information Notice is intended to garner industry input for questions regarding Roller Gate Fabrication for the Winfiled Lock and Dam Located in Red House, West Virgina. Interested Contractors are encouraged to reply to the following questions after reviewing the Attached Technical Drawings: 1. Can the skin plate splices be performed using submerged arc welding? 2. Economies of scale: Are there significant efficiencies related to fabrication of 1 gate v 2 gates v 3 gates, etc. 3. Not grinding skin plate welds—What is the time and labor savings? Would not staggering skin plate splices increase efficiency/benefit fabrication? Note that splice welds would still be required to be ground flush at the intersections of longitudinal and transverse splice welds a minimum of 4” in all directions. 4. What factors do you consider when doing 100% RT on this quantity of welds? Shutting down shop? How is this cost factored in? What is the production rate? Cost per test? 5. Would a design featuring multiple pieces (2-4) with transverse gate splice(s) benefit fabrication? Would you prefer this splice be welded or bolted using slip critical bolted connection. Note that full assembly would be required at the shop prior to shipment for a full shop fit assembly. 6. Would a design featuring bolted on end shields and/or apron benefit fabrication/increase efficiency? 7. Would you be more or less likely to bid if this was a Construction Contractor (i.e. working with a prime contractor to install) vs a supply fabrication contract. 8. What can USACE do to reduce risk/contingency in bidding a project like this? 9. Are there connections that would be more cost efficient bolted instead of welded? Would it be more cost efficient to weld, or use slip critical bolts to connect splices on the skin plate(longitudinal and transverse)? 10. Are there a fabrication cost difference between bearing type and slip-critical bolted connections. 11. If final assembly of the gates is allowed in the field during installation, is this something that would be a benefit for fabrication/increase efficiency?

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (1)

  • Drawings.pdf

    876 KBAdded in Sources Sought version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Sources SoughtArchived

    Winfield Roller Gate RFI

    Notice 3633088476034fb6bf33e03b2c9506b4 on SAM.gov

  2. 3
    Version 3Sources SoughtArchivedCurrent

    Winfield Roller Gate RFI

    Notice 01d75ad8f4a4441aaeecdb9dfee93e10 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

W91237-26-Q1C5L

Archive Date

Sep 8, 2026

Office Address

HUNTINGTON, WV, 25701-5000