Notice ID: d6c4bf31dd8c989aa49571b9ea202961Award NoticeAwarded
Z--Joint Federal Project Phase V- American River Right Bank Stabilization
Awarded on May 12, 2015. Full description on SAM.gov.
Awarded tounder W91238-15-C-0004 (source: SAM.gov award notice)• $1.8M
Overview
- Posted
- May 12, 2015
- Notice type
- Award Notice
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W075 ENDIST SACRAMENTO
- Place of performance
- USACE District, Sacramento 1325 J. Street, Sacramento CA 95814 US
- PSC
- Z: MAINT, REPAIR, ALTER REAL PROPERTY
- Last updated
- Dec 5, 2025
- Award date
- May 12, 2015
- Award amount (SAM.gov award notice)
- $1.8M
Identifiers
- Solicitation number
- W9123815R0029
- Notice ID
- d6c4bf31dd8c989aa49571b9ea202961
- Award number (PIID)
- W91238-15-C-0004
Description
The primary objective of this project is to ensure the increment of the slope between about elevations 125 feet and 160 feet (NAVD 88) remains stable during future operations of the auxiliary spillway. To achieve this, the lower bank slopes below about elevation 160 will be reinforced with 32' long, post tensioned, rock bolts based on U.S. Army Corps of Engineers (USACE) Engineer Manual (EM) 1110-1-2907. Bolts will generally be installed on a 20-foot by 20-foot diamond pattern; however, additional bolts may be installed at up to ten (10) locations at the direction of the Government. In addition to the installation of rock bolts as described above, it is anticipated that some dental concrete may be required to fill reentrant joint cavities to prevent the potential dislodging of several large rock blocks in the vicinity of Sta. 14+90. Site accessibility and the steep topography of the American River right bank site are a challenge to the planning, design and construction of the right bank stabilization effort. The access ramp or temporary access route to the midslope work area will be steep with a grade as much as 30%. Rock bolts will be installed on the lower vertical slopes and as such will require limited access drilling capability in order to install the bolts while suspended alongside the vertical slopes.
Award Overview
Award Number
W91238-15-C-0004
Award Amount (SAM.gov award notice)
$1.8M
Award Date
May 12, 2015
Awardee
Awardee UEI
NBH9KJABV2K5
Original Solicitation
Notice ID: d6c4bf31dd8c989aa49571b9ea202961
Posted Date: May 12, 2015
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Matthew Hancsarik, 9165577480 USACE District, Sacramento
Documents
No documents available.
Lifecycle
Solicitation:
W9123815R0029- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 2×Pre-SolicitationFeb 2, 2015
Z--Joint Federal Project Phase V- American River Right Bank Stabilization
- SolicitationApr 10, 2015
Z--Joint Federal Project Phase V- American River Right Bank Stabilization
- AwardedCurrentMay 12, 2015
Z--Joint Federal Project Phase V- American River Right Bank Stabilization
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W9123815R0029
Archive Date
Jun 11, 2015