GovChime
Notice ID: d6c4bf31dd8c989aa49571b9ea202961Award NoticeAwarded

Z--Joint Federal Project Phase V- American River Right Bank Stabilization

Awarded on May 12, 2015. Full description on SAM.gov.

Awarded tounder W91238-15-C-0004 (source: SAM.gov award notice)• $1.8M

Overview

Posted
May 12, 2015
Notice type
Award Notice
Agency
Department of WarDepartment of the Army

Notice details

Office
W075 ENDIST SACRAMENTO
Place of performance
USACE District, Sacramento 1325 J. Street, Sacramento CA 95814 US
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 5, 2025
Award date
May 12, 2015
Award amount (SAM.gov award notice)
$1.8M

Identifiers

Solicitation number
W9123815R0029
Notice ID
d6c4bf31dd8c989aa49571b9ea202961
Award number (PIID)
W91238-15-C-0004

Description

The primary objective of this project is to ensure the increment of the slope between about elevations 125 feet and 160 feet (NAVD 88) remains stable during future operations of the auxiliary spillway. To achieve this, the lower bank slopes below about elevation 160 will be reinforced with 32' long, post tensioned, rock bolts based on U.S. Army Corps of Engineers (USACE) Engineer Manual (EM) 1110-1-2907. Bolts will generally be installed on a 20-foot by 20-foot diamond pattern; however, additional bolts may be installed at up to ten (10) locations at the direction of the Government. In addition to the installation of rock bolts as described above, it is anticipated that some dental concrete may be required to fill reentrant joint cavities to prevent the potential dislodging of several large rock blocks in the vicinity of Sta. 14+90. Site accessibility and the steep topography of the American River right bank site are a challenge to the planning, design and construction of the right bank stabilization effort. The access ramp or temporary access route to the midslope work area will be steep with a grade as much as 30%. Rock bolts will be installed on the lower vertical slopes and as such will require limited access drilling capability in order to install the bolts while suspended alongside the vertical slopes.

Full description on SAM.gov

Award Overview

Award Number

W91238-15-C-0004

Award Amount (SAM.gov award notice)

$1.8M

Award Date

May 12, 2015

Awardee

Awardee UEI

NBH9KJABV2K5

Original Solicitation

Notice ID: d6c4bf31dd8c989aa49571b9ea202961

Posted Date: May 12, 2015

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Matthew Hancsarik, 9165577480 USACE District, Sacramento

Documents

No documents available.

Lifecycle

Solicitation:W9123815R0029
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 2×
    Pre-SolicitationFeb 2, 2015

    Z--Joint Federal Project Phase V- American River Right Bank Stabilization

    Notice 9f5f282ee17cabd8f557e7a34172101c on SAM.gov

  2. SolicitationApr 10, 2015

    Z--Joint Federal Project Phase V- American River Right Bank Stabilization

    Notice d52bc139689b98e8e02ff4db7e12bded on SAM.gov

  3. AwardedCurrentMay 12, 2015

    Z--Joint Federal Project Phase V- American River Right Bank Stabilization

    Notice d6c4bf31dd8c989aa49571b9ea202961 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W9123815R0029

Archive Date

Jun 11, 2015